Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C 

UIT-T SG15

Transport network structures

Periodo de estudios 2009

Resultados :487 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Siguiente Next
Contribuciones  [ AI/Cuestión: Q13/15 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 1657 ]  
(Rev.1) 
Proposals on the factors used for the master selection of time/phase sync     China , China Mobile Communications Corporation , ZTE Corporation   Q13/15   2011-11-21
[ 1655 ]  
(Rev.1) 
Analysis of selection window and oscillator     China , ZTE Corporation   Q13/15   2011-11-21
[ 1654 ]  
(Rev.1) 
Analysis about timestamp process of PTP event packet     ZTE Corporation   Q13/15   2011-11-21
[ 1653 ]  
(Rev.1) 
Proposal to emphasize the clarification for CBR40G jitter generation for STM-256 case in OTN equipment     China Unicom   Q9/15, Q13/15   2011-11-21
[ 1620 ]  
(Rev.1) 
Proposal on the 1588v2 over OTN by OSC     FiberHome Technologies Group , ZTE Corporation   Q13/15, Q11/15   2011-11-19
[ 1617 ]  
 
Withdrawn: Duplicate of C-1620  
Withdrawn
 
FiberHome Technologies Group , ZTE Corporation   Q13/15, Q11/15   2011-11-19
[ 1607 ]  
(Rev.1) 
Study of maximum absolute time error accumulation in a chain of Boundary Clocks with time filtering and with Physical Layer frequency assist     Anue Systems   Q13/15   2011-11-18
[ 1606 ]  
(Rev.1) 
Simulation results regarding spectrum of time-stamping granularity error     Anue Systems   Q13/15   2011-11-18
[ 1605 ]  
(Rev.1) 
Reduction of impact of time-stamping granularity noise on time transfer error     Anue Systems   Q13/15   2011-11-18
[ 1604 ]  
(Rev.1) 
Sliding versus jumping windows     Anue Systems   Q13/15   2011-11-18
[ 1603 ]  
(Rev.1) 
Floor Packet Population PDV limit for two-way methods     Anue Systems   Q13/15   2011-11-18
[ 1602 ]  
(Rev.1) 
Test Case for 150us cluster and 200s window     Anue Systems   Q13/15   2011-11-18
[ 1601 ]  
(Rev.1) 
Observations on the framework of Floor Population Metrics for PDV Limits     Anue Systems   Q13/15   2011-11-18
[ 1600 ]  
(Rev.1) 
Developing a graphical understanding of floor population PDV metrics     Anue Systems   Q13/15   2011-11-18
[ 1599 ]  
(Rev.1) 
Names and formulae for floor population metrics     Anue Systems   Q13/15   2011-11-18
[ 1597 ]  
 
Observations regarding floor population percentage measurements     Anue Systems   Q13/15   2011-11-18
[ 1596 ]  
(Rev.1) 
PDV network limit in G.8261.1     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1595 ]  
(Rev.1-2) 
Intra-site Time Sync Requirements in G.8271     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1591 ]  
(Rev.1-3) 
EEC with enhanced Holdover     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1589 ]  
(Rev.1) 
Noise Generation in G.8263     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1587 ]  
(Rev.1) 
Proposal for text concerning packet selection in G.8260     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1586 ]  
(Rev.1) 
Discussion on reference points and network limits in G.8271     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1583 ]  
(Rev.1) 
Proposal for network limits in G.8271     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1571 ]  
(Rev.1) 
G.8263 : PEC-S-F state under limits of noise tolerance     Cisco Systems, Inc.   Q13/15   2011-11-18
[ 1570 ]  
(Rev.1) 
Utilization of IP mapping for hop-by-hop BC model     Cisco Systems, Inc.   Q13/15   2011-11-18
[ 1569 ]  
(Rev.1) 
Two-step clock issue with multicast transmission     Cisco Systems, Inc.   Q13/15   2011-11-18
[ 1564 ]  
(Rev.1) 
Holdover specification in G.8263     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1563 ]  
(Rev.1) 
Discussion on Architecture and BMC algorithm for the Time Sync Telecom Profile (G.8275 and G.8275.1)     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1561 ]  
(Rev.1) 
PTP Mapping in the first Time Sync Telecom Profile (G. 8275.1)     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1538 ]  
(Rev.1) 
Example of changes to G.8021 to support enhanced holdover     Ciena Canada   Q13/15   2011-11-17
[ 1535 ]  
(Rev.1) 
Clean-up of G.8260 text     Zarlink Semiconductor   Q13/15   2011-11-17
[ 1534 ]  
(Rev.1) 
Harmonization of cluster & percentile selection for clock emulation metrics     Zarlink Semiconductor   Q13/15   2011-11-17
[ 1517 ]  
 
Specification of a Pulse per Second (1PPS) interface for Telecom     Huawei   Q13/15   2011-02-02
[ 1516 ]  
 
Translation of an IP Multicast address to an Ethernet MAC Multicast address     Huawei   Q13/15   2011-02-02
[ 1515 ]  
 
PTP link-local and internetwork IPv4 Multicast addresses for hop-by-hop time transfer     Huawei   Q13/15   2011-02-02
[ 1514 ]  
 
Effect of Pdelay or Delay Request/Response Turnaround Time, and Sojourn Time, on Boundary Clock Performance     Huawei   Q13/15   2011-02-02
[ 1513 ]  
 
G.8275.1 time-profile: ClockClass attribute discussion     Huawei   Q13/15   2011-02-02
[ 1512 ]  
 
Minimum 1PPS requirements and additional requirements     Huawei   Q13/15   2011-02-02
[ 1511 ]  
 
Mathematical Description of Boundary Clock Simulation Models for the Case of Frequency Distribution via syncE     Huawei   Q13/15   2011-02-02
[ 1510 ]  
 
Comparison of Boundary Clock Simulation Models     Huawei   Q13/15   2011-02-02
[ 1509 ]  
 
Additional external 1PPS interface point, and PTP / non-PTP interworking for GPON/DSL     Huawei   Q13/15   2011-02-02
[ 1497 ]  
 
Architectural constructs to describe phase/time distribution     Ciena Corporation   Q13/15   2011-02-02
[ 1459 ]  
 
G.8260: comments on WD107 from Edinburgh interim meeting (PDV metrics)     France Telecom , Tellabs   Q13/15   2011-02-02
[ 1458 ]  
 
Network PDV accumulation study with "end-to-end" data traffic model     France Telecom   Q13/15   2011-02-02
[ 1457 ]  
 
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented     France Telecom   Q13/15   2011-02-02
[ 1456 ]  
 
G.8272: comments on PRTC limits proposal     France Telecom   Q13/15   2011-02-02
[ 1455 ]  
 
G.8263: testing methodology for the PDV tolerance of a packet slave clock     France Telecom   Q13/15   2011-02-02
[ 1454 ]  
 
G.8261.1: Hypothetical Reference Models proposal     France Telecom   Q13/15   2011-02-02
[ 1453 ]  
 
G.8261.1: Preliminary proposal of PDV network limits for the HRM-1     France Telecom   Q13/15   2011-02-02
[ 1452 ]  
 
Possible locations of external phase/time interfaces in a phase/time distribution chain based on Boundary Clocks     France Telecom   Q13/15   2011-02-02
Resultados :487 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-6-22