Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : R23-WP7D : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R R23-WP7D  C 

UIT-R R23-WP7D

Radioastronomía

Resultados :236 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 86 ]  
 
Draft reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5C and 7C for information) - WRC-27 agenda item 1.3     Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science (IUCAF)   AI1.3   2024-08-16
[ 85 ]  
 
Draft reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B and 7C for information) - Information to support the studies under WRC-27 agenda item 1.1     Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science (IUCAF)   AI1.1   2024-08-16
[ 84 ]  
 
Draft revision of Recommendation ITU-R V.431-8 - Nomenclature of the frequency and wavelength bands used in telecommunications     ATDI     2024-07-26
[ 83 ]  
 
Reply liaison statement to Working Party 7D - Update to preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ]     WP 5D     2024-07-16
[ 82 ]  
 
Information on the preparation of texts for the draft CPM Report to WRC-27     Chair, CPM-27     2024-07-09
[ 81 ]  
 
Liaison statement to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D - WRC-27 agenda item 1.7     WP 5D   AI1.7   2024-07-08
[ 80 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 4C, 5A, 5D and 7D for information) - Beam Wireless Power Transmission (WPT)     WP 1A     2024-06-21
[ 79 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 5A, 5D, 7C and 7D for information) - Work of Working Party 1A on beam-Wireless Power     WP 1A     2024-06-21
[ 78 ]  
 
Reply liaison statement to Working Party 7D (copy to Working Parties 4C, 5A, 5D and 7C for information) - Beam Wireless Power Transmission (WPT)     WP 1A     2024-06-21
[ 77 ]  
 
Reply liaison statement to Working Party 7D (copied to Working Party 5D for information) - Boundary conditions for the coordination and protection of the radio astronomy service in the 42.5-43.5 GHz band - Preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ]     WP 3M     2024-06-13
[ 76 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.17     WPs 3L and 3M   AI1.17   2024-06-12
[ 75 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1     WP 3M   AI1.1   2024-06-12
[ 74 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A,7B, 7C and 7D for information) - Studies under WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14     WPs 3L and 3M   AI1.14, AI1.13, AI1.12, AI1.11   2024-06-12
[ 73 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7C and 7D for information) - WRC-27 agenda item 1.3     WP 3M   AI1.3   2024-06-12
[ 72 ]  
 
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 4C, 5A, 5C, 7C and 7D for information) - Propagation information to support studies in preparation for WRC-27 agenda item 1.8     WPs 3J, 3K and 3M   AI1.8   2024-06-12
[ 71 ]  
 
Reply liaison statement to Working Parties 7C and 7D (copy to Working Parties 4A, 4C, 5A, 5B and 5C for information) - Propagation aspects related to WRC-27 agenda item 1.18     WPs 3J and 3M   AI1.18   2024-06-12
[ 70 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Relevant technical information to support studies under WRC-27 agenda item 1.15     WP 3J   AI1.15   2024-06-12
[ 69 ]  
 
Reply liaison statement to Working Party 5C (copy to Working Parties 1A, 4A, 4B, 4C, 5A, 5B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10     WPs 3J and 3M   AI1.10   2024-06-11
[ 68 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7     WPs 3K and 3M   AI1.7   2024-06-10
[ 67 ]  
 
Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 4A, 4C, 5A, 5B and 5D for information) - WRC-27 agenda items 1.16     WPs 3J and 3M   AI1.16   2024-06-10
[ 66 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 3J, 4A, 4C, 5A, 5B, 5D, 7A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.15     WP 5C   AI1.15   2024-05-29
[ 65 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5D, 6A, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.13     WP 5C   AI1.13   2024-05-29
[ 64 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.7     WP 5C   AI1.7   2024-05-29
[ 63 ]  
 
Liaison statement to Working parties 4A, 4C, 5A, 5B, 3J and 3M (copy to Working Parties 1A, 4B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10     WP 5C   AI1.10   2024-05-29
[ 62 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.3     WP 5C   AI1.3   2024-05-29
[ 61 ]  
 
Reply liaison statement to Working Party 5D (copy for information to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5C, 7B, 7C, 7D and ICAO) - Relevant technical information for sharing studies under WRC-27 agenda item 1.7     WP 5B   AI1.7   2024-05-28
[ 60 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5C, and 7D (copy to Working Party 7C for information) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8     WP 5B   AI1.8   2024-05-21
[ 59 ]  
 
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 4C, 5A, 5B, 5C, 3J and 3M) - Relevant technical information to support studies under WRC-27 agenda item 1.18     WP 4A   AI1.18   2024-05-15
[ 58 ]  
 
Reply liaison statement to Working Party 7D - Relevant technical information to support studies under WRC-27 agenda item 1.16 documenting FSS characteristics in some frequency bands     WP 4A   AI1.16   2024-05-14
[ 57 ]  
 
Liaison statement to Working Parties 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D (copy to Working Party 7C for information) - Information to support studies under WRC-27 agenda item 1.1     WP 4A   AI1.1   2024-05-13
[ 56 ]  
 
Liaison statement to Working Parties 5A, 5C, 3M and 7D (copy to Working Party 7C) - WRC-27 agenda item 1.3     WP 4A   AI1.3   2024-05-13
[ 55 ]  
 
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Technical information to support the studies for WRC-27 agenda item 1.13     WP 4C   AI1.13   2024-05-01
[ 54 ]  
 
Liaison statement to Working Parties 3L, 3M, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D (copy to Working Party 4A for information, and action if any) - Relevant technical information to support studies under WRC-27 agenda item 1.12     WP 4C   AI1.12   2024-05-01
[ 53 ]  
 
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D - WRC-27 agenda item 1.11     WP 4C   AI1.11   2024-05-01
[ 52 ]  
 
Reply liaison statement to Working Parties 7C and 7D WRC-27 agenda item 1.18 - Technical information to support studies under WRC-27 agenda item 1.18     WP 4C   AI1.18   2024-05-01
[ 51 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)     Chair, CCV     2024-04-22
[ 50 ]  
 
Liaison statement for action to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D, and for information to Working Party 1B - Relevant technical information to support studies under WRC-27 agenda item 1.15     WP 7B   AI1.15   2024-03-27
[ 49 ]  
 
Liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D) - WRC-27 agenda item 1.7     WP 7B   AI1.7   2024-03-27
[ 48 ]  
 
Liaison statement out to key SDOs on the publication of GR THz 001 and GR THz 002     ETSI     2024-03-27
[ 47 ]  
 
Liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7D for information) - Information on active and passive sensors in the EESS for WRC-27 agenda item 1.8     WP 7C   AI1.8   2024-03-26
[ 46 ]  
 
Liaison statement to Working Parties 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D - Relevant technical information to support studies under WRC-27 agenda item 1.17     WP 7C   AI1.17   2024-03-25
[ 45 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7D for information) - WRC-27 agenda item 1.7     WP 7C   AI1.7   2024-03-25
[ 44 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5C and 7D for information) - WRC-27 agenda item 1.3     WP 7C   AI1.3   2024-03-25
[ 43 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D for information) - WRC-27 agenda item 1.1     WP 7C   AI1.1   2024-03-25
[ 42 ]  
 
Reply liaison statement to Working Party 1A (copy to Working Parties 4C, 5A, 5D and 7D for information) - Beam Wireless Power Transmission (WPT)     WP 7C     2024-03-25
[ 41 ]  
+Ann.1-18 
Report of the meeting of Working Party 7D (Geneva, 19-22 March 2024)     Acting Chair, WP 7D     2024-03-22
[ 40 ]  
 
Final list of participants - Working Party 7D (Geneva, 19-22 March 2024)     Director, BR     2024-03-22
[ 39 ]  
 
List of documents issued (Documents 7D/1 - 7D/39)     BR, Study Groups Department     2024-03-19
[ 38 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 1B, 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - WRC-27 agenda item 1.6     WP 6A   AI1.6   2024-03-18
[ 37 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 1A, 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D for information) - WRC-27 agenda item 1.10     WP 6A   AI1.10   2024-03-18
Resultados :236 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2025-10-06