Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 613 ]
|
Considerations on the necessities of fgMTN DNI Protection
|
China Academy of Information and Communications Technology
,
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q11/15
|
2025-09-29 |
|
[ 612 ]
|
Proposal to include additional texts in draft of ITU-T G Supplement LLSoT(W)DM "Low Layer Split Mobile Fronthaul over T(W)DM PON"
|
Ministry of Communications, Department of Telecommunications (India)
|
Q2/15
|
2025-09-29 |
|
[ 611 ]
|
Considerations on the container for VC-12 over fgMTNP
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q11/15
|
2025-09-29 |
|
[ 610 ]
|
Proposal for initiation of a new work item for draft new ITU-T recommendation L.arch_WDT "Architecture of wavelength detector and tuning device for optical networks"
|
Ministry of Communications, Department of Telecommunications (India)
|
Q7/15
|
2025-09-29 |
|
[ 609 ]
|
Proposal to initiate discussion on "Multi-Technology Integration Framework for Metro Transport Networks".
|
Ministry of Communications, Department of Telecommunications (India)
|
Q12/15
|
2025-09-29 |
|
[ 608 ]
|
Proposals to modify the texts to the draft revision G.665
|
Indian Institute of Technology Hyderabad
,
Indian Institute of Technology Madras
,
Ministry of Communications, Department of Telecommunications (India)
|
Q6/15
|
2025-09-29 |
|
[ 607 ]
|
Proposal for discussion on multicore fibre splicing
|
Indian Institute of Technology Madras
,
Ministry of Communications, Department of Telecommunications (India)
|
Q7/15, Q5/15
|
2025-09-29 |
|
[ 606 ]
|
Crosstalk measurement test results in response to revision of G.650.2
|
Indian Institute of Technology Madras
,
Ministry of Communications, Department of Telecommunications (India)
|
Q5/15
|
2025-09-29 |
|
[ 605 ]
|
Indian experience on terrestrial installation of MCF (multi-core fibre) cables (Underground & Aerial) in the AOC testbed at IIT Madras, India
|
Indian Institute of Technology Madras
,
Ministry of Communications, Department of Telecommunications (India)
,
Sterlite Technologies Limited (India)
|
Q5/15
|
2025-09-29 |
|
[ 604 ]
|
Propose to initiate a supplement for next generation of fibre in-premises network
|
China Unicom
,
Fraunhofer HHI & IIS (Germany)
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q3/15
|
2025-09-29 |
|
[ 603 ]
|
Proposal for additions and revisions to L.Suppl.39 "Optical fibre cable Recommendations and standardization guideline"
|
Ministry of Communications, Department of Telecommunications (India)
,
Sterlite Technologies Limited (India)
|
Q5/15
|
2025-09-29 |
|
[ 602 ]
|
Proposal for ION-2030 technical standard framework planning
|
China Academy of Information and Communications Technology
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q6/15, Q2/15, Q12/15
|
2025-09-29 |
|
[ 601 ]
|
Proposal for technical study on 400G Inter-Satellite OTN Interface
|
China Academy of Information and Communications Technology
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2025-09-29 |
|
[ 600 ]
|
Proposed update for G.874 for alignment again with prepublished G.798 (2023) Amd. 3 (07/2025)
To be verified by TSB
|
Nokia Shanghai Bell Co. Ltd. (China)
|
Q14/15
|
2025-09-29 |
|
[ 599 ]
|
Performance data streaming in G.7710
To be verified by TSB
|
Nokia Shanghai Bell Co. Ltd. (China)
|
Q14/15
|
2025-09-29 |
|
[ 598 ]
|
G.798.flexo: Review comments
|
Huawei Technologies Dusseldorf GmbH (Germany)
|
Q11/15
|
2025-09-29 |
|
[ 597 ]
|
GSTR.ION-2030 - Ericsson comments
|
Telefon AB - LM Ericsson (Sweden)
|
Q12/15
|
2025-09-29 |
|
[ 596 ]
|
Proposal to revise G.650.1 on accurate test method of optical fiber strain of single-mode fiber
|
China Academy of Information and Communications Technology
,
China Information Communication Technologies Group
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q5/15
|
2025-09-29 |
|
[ 595 ]
|
Direct Client-to-ODUCn Mapping
To be verified by TSB
|
Algérie Télécom SPA (Algeria)
,
China Information Communication Technologies Group
|
Q11/15
|
2025-09-29 |
|
[ 594 ]
|
Direct Client-to-ODUCn Mapping
Not yet uploaded
|
Algérie Télécom SPA (Algeria)
,
China Information Communication Technologies Group
|
Q11/15
|
2025-09-29 |
|
[ 593 ]
|
G.798.odu: Editorial comments
|
Huawei Technologies Dusseldorf GmbH (Germany)
|
Q11/15
|
2025-09-29 |
|
[ 592 ]
|
G.798.media: OCh_TT_Sk access point
|
Huawei Technologies Dusseldorf GmbH (Germany)
|
Q11/15
|
2025-09-29 |
|
[ 591 ]
|
G.sup.VHSP: The analysis of DCF-based dispersion compensation beyond 1400nm band considering the GPON coexistence
|
Algerie Telecom SPA (Algeria)
,
China Information Communication Technologies Group
|
Q2/15
|
2025-09-29 |
|
[ 590 ]
|
Proposals on a new technical report to study the signal structures and high-speed optical interface requirements for satellite free space optical transport networks
|
China Academy of Information and Communications Technology
,
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Unicom
,
ZTE Corporation (China)
|
Q6/15, Q11/15
|
2025-09-29 |
|
[ 589 ]
|
B1T Error Marking Proposal
To be verified by TSB
|
China Information Communication Technologies Group
,
Cisco Systems, Inc. (United States)
|
Q11/15
|
2025-09-29 |
|
[ 588 ]
|
B1T Error Marking Considerations
To be verified by TSB
|
ADTRAN Holdings Inc. (United States)
,
China Information Communication Technologies Group
,
Cisco Systems, Inc. (United States)
|
Q11/15
|
2025-09-29 |
|
[ 587 ]
|
Client types and mapping to LO B1T FlexOy path layer [non-FlexO Path clients]
To be verified by TSB
|
ADTRAN Holdings Inc. (United States)
,
Algérie Télécom SPA (Algeria)
,
China Academy of Information and Communications Technology
,
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
China Unicom
,
Cisco Systems, Inc. (United States)
|
Q11/15
|
2025-09-29 |
|
[ 586 ]
|
B1T FlexOy Path Frame format, overhead and bit rates
To be verified by TSB
|
ADTRAN Holdings Inc. (United States)
,
China Information Communication Technologies Group
,
Cisco Systems, Inc. (United States)
|
Q11/15
|
2025-09-29 |
|
[ 585 ]
|
B1T OTN Bit Rates Generation
To be verified by TSB
|
ADTRAN Holdings Inc. (United States)
,
Algérie Télécom SPA (Algeria)
,
China Information Communication Technologies Group
,
Cisco Systems, Inc. (United States)
|
Q11/15
|
2025-09-29 |
|
[ 584 ]
|
Proposal of keeping the original content of Appendix I~VI for L.111
|
China Information Communication Technologies Group
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q5/15
|
2025-09-29 |
|
[ 583 ]
|
Proposal of some modifications to mechanical characteristics of Annex A and new appendix of Test method for L.111
|
China Information Communication Technologies Group
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q5/15
|
2025-09-29 |
|
[ 582 ]
|
Proposing some modifications to Environmental characteristics and a new appendix of Test method for Change of color for in-home cable for L.111
Not yet uploaded
|
China Information Communication Technologies Group
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q5/15
|
2025-09-29 |
|
[ 581 ]
|
Text proposal for 200G/lane FOIC8o.4-MFI in G.709.mfi
To be verified by TSB
|
ADTRAN Holdings Inc. (United States)
,
China Information Communication Technologies Group
|
Q11/15
|
2025-09-29 |
|
[ 580 ]
|
Proposal of use case for SUP.ISAC4FIP
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q3/15
|
2025-09-29 |
|
[ 579 ]
|
Text proposal for 200G/lane FOIC4(o,e).2-MFI in G.709.mfi
To be verified by TSB
|
ADTRAN Holdings Inc. (United States)
,
China Information Communication Technologies Group
|
Q11/15
|
2025-09-29 |
|
[ 578 ]
|
Proposal of development consideration of Recommendation G.9943
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q3/15
|
2025-09-29 |
|
[ 577 ]
|
Text proposal for 100G per lane MFI interfaces in G.709.mfi
|
ADTRAN Holdings Inc. (United States)
,
China Information Communication Technologies Group
|
Q11/15
|
2025-09-29 |
|
[ 576 ]
|
Suggestion for modifying Energy-Saving Content in ION-2030
|
China Information Communication Technologies Group
|
Q12/15
|
2025-09-29 |
|
[ 575 ]
|
G.709.mfi initial draft
|
ADTRAN Holdings Inc. (United States)
,
China Academy of Information and Communications Technology
,
China Information Communication Technologies Group
|
Q12/15, Q11/15
|
2025-09-29 |
|
[ 574 ]
|
Proposal of content of clause 8 for SUP.ISAC4FIP
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q3/15
|
2025-09-29 |
|
[ 573 ]
|
Client mapping to FlexO Path and multiplexing of FlexO Path layers
To be verified by TSB
|
ADTRAN Holdings Inc. (United States)
,
Algérie Télécom SPA (Algeria)
,
China Academy of Information and Communications Technology
,
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
Cisco Systems, Inc. (United States)
|
Q11/15
|
2025-09-29 |
|
[ 572 ]
|
Update of PT and MSI for B1T FlexO Path
To be verified by TSB
|
Algérie Télécom SPA (Algeria)
,
China Information Communication Technologies Group
,
China Telecommunications Corporation
|
Q11/15
|
2025-09-29 |
|
[ 571 ]
|
Support for role based B1T Path layer structures
To be verified by TSB
|
ADTRAN Holdings Inc. (United States)
,
Algérie Télécom SPA (Algeria)
,
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
China Unicom
,
Cisco Systems, Inc. (United States)
|
Q11/15
|
2025-09-29 |
|
[ 570 ]
|
Proposed new Recommendation "Installation of All-Dielectric Self-Supported (ADSS) cable"
|
China Academy of Information and Communications Technology
,
China Information Communication Technologies Group
,
State Grid Corporation of China
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q5/15
|
2025-09-29 |
|
[ 569 ]
|
Proposed modifications of the main body on the revision of Recommendation L.111
|
China Information Communication Technologies Group
,
China Unicom
|
Q5/15
|
2025-09-29 |
|
[ 568 ]
|
Proposal to start the work on the passive resource management
|
Algerie Telecom SPA (Algeria)
,
China Information Communication Technologies Group
|
Q14/15
|
2025-09-29 |
|
[ 567 ]
|
Analysis for fgMTN DNI protection OAM bandwidth and possible solutions
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2025-09-29 |
|
[ 566 ]
|
fgMTN DNI Protection - Open issue segmented path
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2025-09-29 |
|
[ 565 ]
|
25G MTN Section layer interface
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2025-09-29 |
|
[ 564 ]
|
Proposal for VC-4 GMP mapping into fgMTNP for inclusion in Rec G.8312
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2025-09-29 |
Results:372 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):