International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 5 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 5  C 

ITU-T SG 5

Environment, climate change and circular economy

Study Period 2017

Results:181 total items.
Result page:  Previous -  1 - 2 - 3 - 4
Contributions  [ AI/Question: Q2/5 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 90 ]  
(Rev.1) 
Confusion with what tests need to be done for PoE interfaces.     ADTRAN   Q2/5   2017-10-09
[ 89 ]  
(Rev.1) 
External enhanced transverse test of 6 kV is too extreme for normal Ethernet port topologies.     ADTRAN   Q2/5   2017-10-09
[ 88 ]  
(Rev.1) 
Align Ethernet & PoE K.20 internal transverse surge tests     ADTRAN   Q2/5   2017-10-09
[ 87 ]  
(Rev.1) 
Simultaneous port to earth test are extreme for internal building applications.     ADTRAN   Q2/5   2017-10-09
[ 86 ]  
(Rev.1) 
Test description in the test tables is incorrect for the type of test (A.6.7-3a).     ADTRAN   Q2/5   2017-10-09
[ 85 ]  
(Rev.1) 
Shield bond test levels are extreme for internal building applications     ADTRAN   Q2/5   2017-10-09
[ 84 ]  
(Rev.1) 
Test description in the test tables is incorrect for the type of test (A.6.7-6).     ADTRAN   Q2/5   2017-10-09
[ 82 ]  
(Rev.1) 
Suggestions for K.99 Surge protective component application guide - Gas discharge tubes     Littelfuse UK Ltd.   Q2/5   2017-09-26
[ 80 ]  
(Rev.1) 
Addressing all shielded data ports including USB     ADTRAN   Q2/5   2017-09-19
[ 78 ]  
(Rev.1) 
K.20 & K.21 internal cable length of 10 meter or less are exempt     ADTRAN   Q2/5   2017-09-13
[ 75 ]  
 
Characteristics of Metal Oxide Varistors (MOVs) for the protection of telecommunications installations     Huawei Technologies Co., Ltd.   Q2/5   2017-05-03
[ 74 ]  
 
The lightning test proposal of the Ethernet port and errata in K.20, K.21 and K.45     Huawei Technologies Co., Ltd.   Q2/5   2017-05-03
[ 73 ]  
 
The lightning test proposal of the USB in K.20 and K.21     Huawei Technologies Co., Ltd.   Q2/5   2017-05-03
[ 71 ]  
 
3-Electrode GDT operation in Ethernet circuits     Bourns Limited   Q2/5   2017-05-02
[ 64 ]  
 
Appendix proposal for K.99 on GDT Component Form Factors     Bourns Limited   Q2/5   2017-05-02
[ 55 ]  
 
Review of K.20, K.21, K.44 and K.45 - Part 3 K.44 generators and test circuits     Bourns Limited   Q2/5   2017-05-02
[ 54 ]  
 
Review of K.20, K.21, K.44 and K.45 - Part 2 K.20, K.21 and K.45 Test tables columns 4 and 5     Bourns Limited   Q2/5   2017-05-02
[ 40 ]  
(Rev.1) 
Review of K.20, K.21, K.44 and K.45 - Part 1 K.20, K.21 and K.45 Test tables columns 1 through 3     Bourns Limited   Q2/5   2017-04-29
[ 32 ]  
(Rev.1) 
Proposed change on flowchart for K.44 to select resistibility level of equipment in customer premises being discussed     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2017-04-28
[ 27 ]  
(Rev.1) 
Draft of K.rcd "Technical requirements for residual current operated protective devices with automatic-reclosing devices for telecom uses".     China Telecommunications Corporation   Q2/5   2017-04-28
[ 22 ]  
 
Proposed study on safety of bridging by SPD between primary and external circuit     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2017-04-27
[ 19 ]  
 
The 3rd draft of Recommendation K.appl4: Surge Protective Component Application Guide - Lightning Isolation Transformers     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2017-04-27
[ 13 ]  
 
Definitions for AC supply configurations     Bourns Limited   Q2/5   2017-04-15
[ 12 ]  
 
Updating K.20/K.21/K.45 2.1.5 and 2.1.6 test comments for C.002 six output 8/20 generator     Bourns Limited   Q2/5   2017-04-14
[ 10 ]  
 
Draft K.appl4 - High frequency signal isolation transformers version     Bourns Limited   Q2/5   2017-03-31
[ 8 ]  
(Rev.1) 
ITU K.20 Ethernet test level     Littelfuse UK Ltd.   Q4/5, Q2/5   2017-03-28
[ 7 ]  
(Rev.1) 
ITU K.44 Figure A.6.7-5 figure edit     Littelfuse UK Ltd.   Q4/5, Q2/5   2017-03-28
[ 6 ]  
(Rev.1) 
ITU K.51 Edits     Littelfuse UK Ltd.   Q4/5, Q2/5   2017-03-22
[ 5 ]  
(Rev.1) 
Revision proposals for K.99     EPCOS AG   Q2/5   2017-03-20
[ 4 ]  
(Rev.1) 
K.50 editorial changes and correct definitions use     Littelfuse UK Ltd.   Q4/5, Q2/5   2017-03-10
[ 2 ]  
(Rev.1-2) 
Replacement K.44 Figure A.3-4 - 8/20 current generator     Bourns Limited   Q2/5   2017-02-27
Results:181 total items.
Result page:  Previous -  1 - 2 - 3 - 4  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-24