Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 370 ]
|
Summary of comments and discussion issues for ORG
|
Telefon AB - LM Ericsson
|
Q18/5
|
2011-09-09 |
|
[ 369 ]
|
Proposal of new text in chapter 8.5 in ORG
|
France Telecom Orange
|
Q18/5
|
2011-09-09 |
|
[ 368 ]
|
Proposal of revised text in Part II.1 of GNS
|
France Telecom Orange
|
Q18/5
|
2011-09-09 |
|
[ 367 ]
|
Contribution to Draft Recommendation ITU-T L.methodology_ICT goods, networks
|
European Union
|
Q18/5
|
2011-09-09 |
|
[ 366 ]
|
Draft Recommendation ITU-T L.methodology_ICT goods, networks and services
|
European Union
|
Q18/5
|
2011-09-09 |
|
[ 365 ]
|
Proposal for adding third-order effects evaluation to Clause 7 of ITU-T L.ORG
|
ETRI
|
Q18/5
|
2011-09-09 |
|
[ 364 ]
|
Proposal for clarification of terminologies of ITU-T L.metrics
|
ETRI
|
Q17/5
|
2011-09-09 |
|
[ 363 ]
|
Editorial improvements for draft Recommendation ITU-T L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"
|
ETRI
|
Q18/5
|
2011-09-09 |
|
[ 362 ]
|
Suggested additions to Appendix Z of the GNS document
|
GSM Association
|
Q18/5
|
2011-09-09 |
|
[ 361 ]
|
Suggested appendices to ORG document
|
GSM Association
|
Q18/5
|
2011-09-09 |
|
[ 360 ]
|
Proposals on the practical management of exposure to RF electromagnetic fields
|
GSM Association
,
Vodafone
|
Q3/5
|
2011-09-09 |
|
[ 359 ]
|
Texts moved in ORG to increase consistency
|
Alcatel Lucent
|
Q18/5
|
2011-09-09 |
|
[ 358 ]
|
Reporting Requirements for scopes 1 and 2 in ORG
|
Alacatel Lucent
,
France Telecom Orange
|
Q18/5
|
2011-09-09 |
|
[ 357 ]
|
Proposed new work item: Tool to assess environmental & sustainability features of mobile phones
|
Telefónica SA
,
RIM
,
Verizon
|
Q18/5
|
2011-09-09 |
|
[ 356 ]
|
Proposed modification to the text of Q22/5
|
Japan
|
Q22/5
|
2011-09-09 |
|
[ 355 ]
|
Proposal of ground method for HVDC for recommendation of L.spec DC
|
Japan
|
Q6/5, Q4/5, Q19/5, Q11/5
|
2011-09-09 |
|
[ 354 ]
|
Proposal on the detailed explanation about the checklist item for work processes and the editorial policy of the draft Recommendation for GNS
|
Japan
|
Q18/5
|
2011-09-09 |
|
[ 353 ]
|
Proposed metrics for OLT equipment
|
Japan
|
Q17/5
|
2011-09-09 |
|
[ 352 ]
|
Proposed minimum data set for evaluating power efficiency and for controlling data center equipment for power saving in data centers
|
Japan
|
Q17/5
|
2011-09-09 |
|
[ 351 ]
|
Proposal for way of selecting cooling systems which takes into consideration outdoor air condition and power density of data centers
|
Japan
|
Q17/5
|
2011-09-09 |
|
[ 350 ]
|
Proposal for clarification and focus of K Guide
|
Telefon AB - LM Ericsson
|
Q3/5
|
2011-09-09 |
|
[ 349 ]
|
Proposal on Uncertainty calculation for K.guide
|
China Mobile Comms Corp
|
Q3/5
|
2011-09-09 |
|
[ 348 ]
|
Watt guard - Proposal for a new sub clause in Recommendation K.guide
|
Germany
|
Q3/5
|
2011-09-09 |
|
[ 347 ]
|
Proposed Metric for network domain
|
Korea (Rep. of)
|
Q17/5
|
2011-09-09 |
|
[ 346 ]
|
Proposal on considerations for measuring power consumption in L.measure
|
Korea (Rep. of)
|
Q17/5
|
2011-09-09 |
|
[ 345 ]
|
Comparison of terms introduced in IEC 62368-1 standard
|
Korea (Rep. of)
|
Q11/5
|
2011-09-09 |
|
[ 344 ]
|
Proposal of study items for architecture of DC power feeding systems
|
Korea (Rep. of)
|
Q19/5
|
2011-09-09 |
|
[ 343 ]
|
Proposal for Clause 11 of L.methodology_ICT_projects, "ICT project quantifying"
|
Korea (Rep. of)
|
Q18/5
|
2011-09-09 |
|
[ 342 ]
|
A Method to provide recycling information of rare metals in ICT products
|
Korea (Rep. of)
|
Q21/5
|
2011-09-09 |
|
[ 341 ]
|
Necessity of considering a phase difference between induced voltages by several inducing plants for their superposition
|
Korea (Rep. of)
|
Q9/5
|
2011-09-09 |
|
[ 340 ]
|
Proposal for text deletions, modifications and additions to improve ITU-T L.GNS
|
Korea (Rep. of)
|
Q18/5
|
2011-09-09 |
|
[ 339 ]
|
Proposal for development of an ITU-T Handbook on an assessment framework for energy/greenhouse gas and environmental impacts of ICT products, organizations, projects, and utilization activities
|
Korea (Rep. of )
|
Q18/5
|
2011-09-09 |
|
[ 338 ]
|
Energy Efficiency Metrics for Base Stations
|
Korea (Rep. of)
|
Q17/5
|
2011-09-09 |
|
[ 337 ]
|
Requirement of EMC and Safety study for L.adapterPhase2 draft
|
Korea (Rep. of)
|
Q21/5
|
2011-09-09 |
|
[ 336 ]
|
Organizational Activities to Reduce GHG Emissions and Energy Consumption or increase GHG Removals
|
Korea (Rep. of)
|
Q18/5
|
2011-09-09 |
|
[ 335 ]
|
Proposal for preparing a new recommendation: Human exposure measurement method when a base station is put into service
|
Korea (Rep. of)
|
Q3/5
|
2011-09-09 |
|
[ 334 ]
|
Considerations of universal battery solution
|
China
|
Q21/5
|
2011-09-09 |
|
[ 333 ]
|
Survey and Proposal on L.adapter Phase2 draft
|
China
|
Q21/5
|
2011-09-09 |
|
[ 332 ]
|
Contribution for the drafting of K.henv
|
CATR of MIIT
|
Q8/5
|
2011-09-09 |
|
[ 331 ]
|
Radiation Immunity Test Method for Telecommunication Equipment when Radio Frequencies are Emitted from Wireless Communication Terminals
|
NTT
|
Q12/5
|
2011-09-09 |
|
[ 330 ]
|
Transmission Characteristics of Conducted Disturbances from an AC Power Supply Port to Ethernet Ports of IP-based Communication Devices
|
NTT
|
Q8/5
|
2011-09-09 |
|
[ 329 ]
|
Proposed method for processing Ethernet port and USB port in overvoltage test
|
NTT
|
Q4/5
|
2011-09-09 |
|
[ 328 ]
|
Comments on K.guide: microcell installation
|
NICT
,
NTT DoCoMo Inc.
|
Q3/5
|
2011-09-09 |
|
[ 327 ]
|
Additional information for K.guide about the measurement time of the electromagnetic fields from mobile phone base stations
|
NICT
|
Q3/5
|
2011-09-09 |
|
[ 326 ]
|
Comments on K.guide: time averaging
|
NICT
|
Q3/5
|
2011-09-09 |
|
[ 325 ]
|
Characterization of Base Stations RF Exposure - Examples of Measurements
|
ANATEL
|
Q3/5
|
2011-09-09 |
|
[ 324 ]
|
Proposal of DC interface requirements for recommendation of L.spec DC
|
NTT
|
Q19/5
|
2011-09-06 |
|
[ 323 ]
|
Proposal of management functions of DC power feeding systems
|
Korea Telecom
|
Q19/5
|
2011-09-06 |
|
[ 322 ]
|
Proposal of configuration of DC power feeding systems with system redundancy
|
Korea Telecom
|
Q19/5
|
2011-09-06 |
|
[ 321 ]
|
Proposal of battery configuration and operation in DC power feeding systems
|
Korea Telecom
|
Q19/5
|
2011-09-06 |
Results:520 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):