International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP7C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP7C  C 

ITU-R R23-WP7C

Remote Sensing Systems

Results:264 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 114 ]  
 
Preliminary draft revision of Recommendation ITU-R RS.577-7 - Frequency bands and required bandwidths used for spaceborne active sensors operating in the Earth exploration-satellite (active) and space research (active) services     Canada     2024-08-30
[ 113 ]  
 
Preliminary draft revision of Recommendation ITU-R RS.2105-2 - Typical technical and operational characteristics of Earth exploration-satellite service (active) systems using allocations between 432 MHz and 238 GHz     Canada     2024-08-30
[ 112 ]  
 
Preliminary draft revision of Recommendation ITU-R RS.1166-5 - Performance and interference criteria for active spaceborne sensors     Canada     2024-08-30
[ 111 ]  
 
Proposed updates to the working document towards a preliminary draft new Recommendation ITU-R RS.[RXSW_PROTECT_CRITERIA] - Protection criteria of receive-only space weather sensors in the meteorological aids service (space weather)     United States   AI1.17   2024-08-26
[ 110 ]  
 
Preliminary draft revision of Report ITU-R RS.2489-0 - Technical and operational characteristics of ground-based passive sensors operating in the 51-58 GHz frequency range     United States     2024-08-26
[ 109 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R RS.1166-5 - Performance and interference criteria for active spaceborne sensors     United States     2024-08-26
[ 108 ]  
 
Revisions to working document toward a preliminary draft new Report ITU-R RS.[AGG_EESS_SAR-RNSS]     United States     2024-08-26
[ 107 ]  
 
Draft reply liaison statement to Working Party 4C on RNSS-related comments on Report ITU-R RS.2537-0, Recommendation ITU-R RS.2165-0, and working document towards a preliminary draft new Report ITU-R RS.[AGG_EESS_SAR-RNSS] (Questions ITU-R 217-2/4 and ITU-R 288/4)     United States     2024-08-26
[ 106 ]  
 
Studies on possible allocations to the Earth exploration-satellite service (passive) in the bands 4 200-4 400 MHz and 8 400-8 500 MHz     United States   AI1.19   2024-08-26
[ 105 ]  
 
Proposed initial framework of the working document on studies under WRC-27 agenda item 1.17 - Initial framework of the working document on studies under WRC-27 agenda item 1.17     United States   AI1.17   2024-08-26
[ 104 ]  
 
Preliminary draft new Report ITU-R RS series - Analysis of interference received by EESS (passive) sensors in the 18.6-18.8 GHz band caused by surface water reflections     United States     2024-08-26
[ 103 ]  
 
Working document towards a preliminary draft revised Recommendation ITU-R RS.577-7     United States     2024-08-26
[ 102 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R RS.[2105-2 + RADAR SOUNDER]     United States     2024-08-26
[ 101 ]  
 
Working document towards preliminary draft new Report ITU-R [EESS(PASSIVE) COMPATIBILITY ABOVE 76 GHZ]     United States   AI1.18   2024-08-26
[ 100 ]  
 
Proposed reply liaison statement to Working Party 4C regarding WRC-27 agenda item 1.14     United States   AI1.14   2024-08-26
[ 99 ]  
 
Proposed reply liaison statement to Working Party 4C regarding WRC-27 agenda item 1.11     United States   AI1.11   2024-08-26
[ 98 ]  
 
Proposed liaison statement to Working Party 4A regarding WRC-27 agenda item 1.6     United States   AI1.6   2024-08-26
[ 97 ]  
 
Proposed reply liaison statement to Working Party 4A regarding WRC-27 agenda item 1.4     United States   AI1.4   2024-08-26
[ 96 ]  
 
Committee on the Peaceful Uses of Outer Space: 2024 - Sixty-seventh session (19-28 June 2024) - Space sustainability issues     Brazil     2024-08-26
[ 95 ]  
 
Liaison statement to ITU-R Working Parties 5B and 7C - WRC-27 agenda item 1.19 - Proposed technical parameters and operating scenarios to consider in studies between Earth exploration-satellite service (passive), and radio altimeters and Wireless Avionics Intra Communications operating in the 4 200-4 400 MHz frequency band     International Civil Aviation Organization   AI1.19   2024-08-22
[ 94 ]  
 
Information on the preparation of texts for the draft CPM Report to WRC-27     Chair, CPM-27     2024-07-09
[ 93 ]  
 
Liaison statement to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D - WRC-27 agenda item 1.7     WP 5D   AI1.7   2024-07-08
[ 92 ]  
 
Initial reply liaison statement to Working Parties 7B and 7C - Relevant technical information to support studies under WRC-27 agenda items 1.15, 1.17 and 1.19     WP 5D   AI1.19, AI1.17, AI1.15   2024-07-08
[ 91 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 4C, 5A, 5D and 7D for information) - Beam Wireless Power Transmission (WPT)     WP 1A     2024-06-21
[ 90 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 5A, 5D, 7C and 7D for information) - Work of Working Party 1A on beam-Wireless Power     WP 1A     2024-06-21
[ 89 ]  
 
Reply liaison statement to Working Party 7D (copy to Working Parties 4C, 5A, 5D and 7C for information) - Beam Wireless Power Transmission (WPT)     WP 1A     2024-06-21
[ 88 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.17     WPs 3L and 3M   AI1.17   2024-06-12
[ 87 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1     WP 3M   AI1.1   2024-06-12
[ 86 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5B, 5C, 7A, 7B and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.2     WP 3M   AI1.2   2024-06-12
[ 85 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 4B, 5A, 5B, 5C, 6B and 7C for information) - WRC-27 agenda item 1.4     WP 3M   AI1.4   2024-06-12
[ 84 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A,7B, 7C and 7D for information) - Studies under WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14     WPs 3L and 3M   AI1.14, AI1.13, AI1.12, AI1.11   2024-06-12
[ 83 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7C and 7D for information) - WRC-27 agenda item 1.3     WP 3M   AI1.3   2024-06-12
[ 82 ]  
 
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 4C, 5A, 5C, 7C and 7D for information) - Propagation information to support studies in preparation for WRC-27 agenda item 1.8     WPs 3J, 3K and 3M   AI1.8   2024-06-12
[ 81 ]  
 
Reply liaison statement to Working Parties 7C and 7D (copy to Working Parties 4A, 4C, 5A, 5B and 5C for information) - Propagation aspects related to WRC-27 agenda item 1.18     WPs 3J and 3M   AI1.18   2024-06-12
[ 80 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 5A, 5B, 5C, 5D and 7B for information) - WRC-27 agenda item 1.19     WPs 3J and 3M   AI1.19   2024-06-12
[ 79 ]  
 
Liaison statement to Study Groups 5 and 7 (copy to Study Group 1 for information) - Activities in response of Resolution 219 (Bucharest, 2022) and Resolution ITU-R 74     SG 4     2024-06-12
[ 78 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Relevant technical information to support studies under WRC-27 agenda item 1.15     WP 3J   AI1.15   2024-06-12
[ 77 ]  
 
Reply liaison statement to Working Party 5C (copy to Working Parties 1A, 4A, 4B, 4C, 5A, 5B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10     WPs 3J and 3M   AI1.10   2024-06-11
[ 76 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7     WPs 3K and 3M   AI1.7   2024-06-10
[ 75 ]  
 
Reply liaison statement to Working Party 7C - Working document towards a preliminary draft new Report ITU-R M.[FOD_EESS_SHARE]     WP 5B     2024-05-30
[ 74 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 3J, 4A, 4C, 5A, 5B, 5D, 7A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.15     WP 5C   AI1.15   2024-05-29
[ 73 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5D, 6A, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.13     WP 5C   AI1.13   2024-05-29
[ 72 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.7     WP 5C   AI1.7   2024-05-29
[ 71 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 3M, 4A, 5A, 5B, 5D and 7B for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.19     WP 5C   AI1.19   2024-05-29
[ 70 ]  
 
Liaison statement to Working parties 4A, 4C, 5A, 5B, 3J and 3M (copy to Working Parties 1A, 4B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10     WP 5C   AI1.10   2024-05-29
[ 69 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 3J, 3M, 4A, 4C, 5A and 5B for information) - Relevant technical information to support studies under WRC-27 agenda item 1.18 and update on supporting materials     WP 5C   AI1.18   2024-05-29
[ 68 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 5A, 5B, 6B, and 7C for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.4     WP 5C   AI1.4   2024-05-29
[ 67 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.3     WP 5C   AI1.3   2024-05-29
[ 66 ]  
 
Reply liaison statement to Working Party 5D (copy for information to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5C, 7B, 7C, 7D and ICAO) - Relevant technical information for sharing studies under WRC-27 agenda item 1.7     WP 5B   AI1.7   2024-05-28
[ 65 ]  
 
Reply liaison statement to Working Party 7C (copy to ICAO for information) - Relevant technical information for sharing studies under WRC-27 agenda item 1.19     WP 5B   AI1.19   2024-05-28
Results:264 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-07-10