International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP-7B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP-7B  C 

ITU-R WP-7B

Space Radiocommunication Applications

Results:278 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 128 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - WRC-23 agenda items 1.1 and 1.2     WPs 3K and 3M   AI1.2, AI1.1   2021-07-05
[ 127 ]  
 
Reply liaison statement to Working Party 4C (copied to Working Parties 4A, 4B, 5A, 5C, 5D, and 7B for information) - WRC-23 agenda item 1.18     WPs 3K and 3M   AI1.18   2021-07-05
[ 126 ]  
 
Reply liaison statement to Working Parties 5B, 5C, 7B, 7C and 7D - WRC-23 agenda item 1.2     WP 5D   AI1.2   2021-06-25
[ 125 ]  
 
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D - WRC-23 agenda item 1.4     WP 5D   AI1.4   2021-06-18
[ 124 ]  
 
Liaison statement to Working Party 3L (copy to Working Parties 3M, 4C, and 7B for information) - Additional elements regarding studies under WRC-23 agenda item 1.7     WP 5B   AI1.7   2021-06-09
[ 123 ]  
 
Liaison statement to Working Party 3M, 4A, 4C, 7B and 7D - WRC-23 agenda item 1.6     WP 5B   AI1.6   2021-06-09
[ 122 ]  
 
Reply liaison statement to Working Party 7B - Elements for studies on WRC-23 agenda item 1.7     WP 5B   AI1.7   2021-06-08
[ 121 ]  
 
Liaison statement to Working Parties 5A, 5D, 7B, 7C and 7D - Beam Wireless Power Transmission (WPT)     WP 1A     2021-06-04
[ 120 ]  
 
Reply liaison statement to Working Party 5D (copy for information to Working Parties 1B, 5C and 7B) - WRC-23 agenda item 1.1 - Characteristics of aeronautical systems and maritime systems operating in the frequency band 4 800-4 990 MHz     WP 5B   AI1.1   2021-05-24
[ 119 ]  
 
Liaison statement on work being carried out under study in ITU-T Q3/5     ITU-T SG 5     2021-05-24
[ 118 ]  
 
Reply liaison statement to Working Party 7B (copy for information to Working Parties 3M, 5A, 7C and 7D) - WRC-23 agenda item 1.13 - Characteristics and protection criteria for fixed service systems operating in the frequency band 14.8-15.35 GHz     WP 5C   AI1.13   2021-05-17
[ 117 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B, 4C, 5A, 5B, 7B and 7C for information) - WRC-23 agenda item 1.2     WP 5C   AI1.2   2021-05-13
[ 116 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5B and 7B for information) - WRC-23 agenda item 1.19 - Characteristics and protection criteria for fixed service systems operating in the frequency band 17.7-19.7 GHz     WP 5C   AI1.19   2021-05-13
[ 115 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B and 7B for information) - WRC-23 agenda items 1.16 and 1.17 - Characteristics and protection criteria for fixed service systems operating in the frequency bands 17.7-19.7 GHz and 27.5-29.5 GHz     WP 5C   AI1.17, AI1.16   2021-05-13
[ 114 ]  
 
Liaison statement to Working Party 7B - Updated information on EESS (passive) for consideration under WRC-23 agenda item 1.13     WP 7C   AI1.13   2021-04-26
[ 113 ]  
 
Liaison statement to CISPR (Subcommittees B and H) (copy for information to Study Group 1 and Working Parties 1A, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Update to Standard frequency and time signal services protection requirements in the CISPR radio services database     WP 7A     2021-04-26
[ 112 ]  
 
Liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C and 7B for information) - WRC-23 agenda item 1.2 - Additional information on EESS (passive) in 10.6-10.7 GHz     WP 7C   AI1.2   2021-04-23
[ 111 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4C, 5A, 5B, 5C and 7B for information) - WRC-23 agenda item 1.16     WP 7C   AI1.16   2021-04-23
[ 110 ]  
 
Liaison statement to Working Party 4A (copy for information to Working Parties 3M, 4B, 4C, 5A, 5B, 5C and 7B) - WRC-23 agenda item 1.17     WP 7C   AI1.17   2021-04-23
[ 109 ]  
+Ann.1-13 
Report of the meeting of Working Party 7B (6-14 April 2021, e-Meeting)     Chairman, WP 7B     2021-04-14
[ 108 ]  
 
Final list of participants Working Party 7B (6-14 April 2021)     Director, BR     2021-04-14
[ 107 ]  
 
Liaison statement from ITU-D Study Group 2 Question 5/2 to ITU-T Study Groups, ITU-R Study Groups, UN and External Organization on the output Report on Q5/2 - ITU-D Study Group 2 Question 5/2: Utilizing telecommunications/ICTs for disaster risk reduction and management     ITU-D SG 2     2021-04-14
[ 106 ]  
 
List of documents issued (Documents 7B/66 - 7B/106)     BR Study Groups Department     2021-04-06
[ 105 ]  
 
Preliminary draft new Report ITU-R SA.[EESS-METSAT CHAR]     European Space Agency (ESA) , European Organisation for the Exploitation of Meteorological Satellites     2021-03-30
[ 104 ]  
 
Draft new Recommendation ITU-R SA.[IMT-EESS/SRS COORDINATION] - Methodologies for calculating coordination zones around Earth exploration satellite and space research earth stations to avoid harmful interference from IMT-2020 systems in the frequency bands 25.5-27 GHz and 37-38 GHz     European Space Agency (ESA) , European Organisation for the Exploitation of Meteorological Satellites     2021-03-30
[ 103 ]  
 
Working document towards a revision of Report ITU-R SA.2307-0 - Protection of SRS and FSS systems sharing the 37.5-38 GHz band     European Space Agency (ESA)     2021-03-30
[ 102 ]  
 
WRC-23 agenda item 1.18     WMO     2021-03-30
[ 101 ]  
 
Proposed revisions to the working document towards a preliminary draft new Report ITU-R SA.[15 GHZ SRS SHARING]     China (People's Republic of)     2021-03-30
[ 100 ]  
 
Report of the Correspondence Group on preliminary draft new Report ITU-R SA.[EESS-METSAT CHAR]     Chairman, Correspondence Group (CG)     2021-03-30
[ 99 ]  
 
Working document towards preliminary draft new Recommendations ITU-R SA.[S-BAND DL USE OPT] and ITU-R SA.[S-BAND UL USE OPT] - Guidelines on the use of the 2 025-2 110 MHz and 2 200-2 290 MHz frequency bands by SRS/EESS/SOS satellites     France     2021-03-29
[ 98 ]  
 
Proposals on the S-band optimization issue     Russian Federation     2021-03-26
[ 97 ]  
 
Proposal in working document towards a preliminary draft new Recommendation ITU-R SA.[15 GHz SRS CHARACTERISTICS]     Russian Federation     2021-03-26
[ 96 ]  
 
Proposal for reply liaison statement to Working Party 5D on WRC-23 agenda item 1.2     Russian Federation   AI1.2   2021-03-26
[ 95 ]  
 
Working document towards a preliminary draft new Report ITU-R SA.[15 GHZ SRS SHARING] - Sharing and Compatibility Studies for the SRS in the band 14.8-15.35 GHz     United States of America     2021-03-26
[ 94 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R SA.[2GHz SOS CHAR] - Technical and operational characteristics of the space operation service (SOS) systems that use the 2 025-2 110 MHz (Earth-to-space) (space-to-space) and 2 200-2 290 MHz (space-to-Earth) (space-to-space) frequency bands     United States of America     2021-03-26
[ 93 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, and 7C for information) - Reply liaison statement to Working Party 5D concerning WRC-23 agenda item 1.2     United States of America   AI1.2   2021-03-26
[ 92 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 5C, and 7C for information) - WRC-23 agenda item 1.17     United States of America   AI1.17   2021-03-26
[ 91 ]  
 
Preliminary draft new Recommendation ITU-R SA.[S.BAND DL USE OPT] and ITU-R SA. [S-BAND UL USE OPT] - Guidelines on the use of the 2 025-2 110 MHz and 2 200-2 290 MHz frequency bands by SRS/EESS/SOS satellites     United States of America     2021-03-26
[ 90 ]  
 
Preliminary draft new Report ITU-R SA.[EESS-METSAT-CHAR] - Characteristics to be used for conducting sharing studies and assessing interference to systems operating in the Earth Exploration-Satellite Service (EESS) and Meteorological-Satellite (MetSat) service     United States of America     2021-03-26
[ 89 ]  
 
Preliminary draft new Recommendation ITU-R SA.[15 GHz SRS CHARACTERISTICS] - Characteristics of SRS Systems in the frequency range 14.8-15.35 GHz     United States of America     2021-03-26
[ 88 ]  
 
Draft liaison statement to Working Parties 4A, 4B and 4C - Technical and operational characteristics of the space operation service (SOS) systems that use the 2 025-2 110 MHz (Earth-to-space) (space-to-space) and 2 200-2 290 MHz (space-to-Earth) (space-to-space) frequency bands     United States of America     2021-03-26
[ 87 ]  
 
Liaison statement to Working Party 7B - Determination of coordination zones around EESS and SRS earth stations     WP 5D     2021-03-19
[ 86 ]  
 
Liaison statement to Working Party 5B (copy for information to Working Parties 1B, 5C, and 7B) - WRC-23 agenda item 1.1     WP 5D   AI1.1   2021-03-19
[ 85 ]  
 
Preliminary position on WRC-23 agenda     World Meteorological Organization     2021-03-17
[ 84 ]  
 
Liaison statement to Working Party 7B - WRC-23 agenda item 1.17     WP 4A   AI1.17   2021-03-16
[ 83 ]  
 
Reply liaison statement to Working Party 7B - Protection of SRS and FSS systems sharing the 37.5-38 GHz band     WP 4A     2021-03-16
[ 82 ]  
 
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D - WRC-23 agenda item 1.4     WP 5D   AI1.4   2021-03-15
[ 81 ]  
 
Reply liaison statement to Working Party 3L (copied to Working Parties 3M, 4C and 7B for information) - Propagation considerations of a new aeronautical mobile-satellite (R) service allocation in the frequency band 117.975-137 MHz     WP 5B   AI1.7   2020-11-20
[ 80 ]  
 
Reply liaison statement to Working Party 5C (copy to Working Parties 3M, 4C, 5A, 5B, 7B, and 7C for information) - WRC-23 agenda item 1.16     WP 4A   AI1.16   2020-11-06
[ 79 ]  
 
Reply liaison statement to Working Party 5C (copy for information to Working Parties 3M, 5A, 5B and 7B) - WRC-23 agenda item 1.19     WP 4A   AI1.19   2020-11-06
Results:278 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2023-11-10