Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 439 ]
|
Studies on the performance of MF AM sound broadcasting receivers in the presence of interference from WPT
|
British Broadcasting Corporation (BBC)
|
|
2018-10-05 |
|
[ 438 ]
|
Proposal of preliminary draft new Report ITU-R BT.[AI4BS] - Applications of Artificial Intelligence (AI) for Broadcasting (to Working Party 6C for action and to Working Parties 6A and 6B for information)
|
Japan
|
|
2018-10-05 |
|
[ 437 ]
|
Proposed revision of working document towards a preliminary draft new Report ITU-R BT.[ADVBROADCAST] - Advanced network planning and transmission methods for enhancements of digital terrestrial television broadcasting
|
Japan
|
Q133/6
|
2018-10-05 |
|
[ 436 ]
|
Report on new terms, definitions and acronyms in recently approved Recommendations of Study Group 6
|
SG 6 Rapp. on Terminology
|
|
2018-10-05 |
|
[ 435 ]
|
UHD video quality at various bitrates and transmission Resolutions
|
Korea (Republic of)
|
|
2018-10-04 |
|
[ 434 ]
|
Proposed revision of Report ITU-R BS.2384 - Implementation considerations for the introduction and transition to digital terrestrial sound and multimedia broadcasting
|
United States of America
|
|
2018-10-03 |
|
[ 433 ]
|
Proposed revision of Report ITU-R BS.2384 - Implementation considerations for the introduction and transition to digital terrestrial sound and multimedia broadcasting
|
United States of America
|
|
2018-10-03 |
|
[ 432 ]
|
Studies in response to Resolution ITU-R 59-1 on frequency bands and tuning ranges for ENG use
|
United States of America
|
|
2018-10-03 |
|
[ 431 ]
|
Continuation of digital terrestrial sound and multimedia broadcasting system RAVIS trials in test zones
|
Russian Federation
|
|
2018-10-03 |
|
[ 430 ]
|
Development of the teleinformation services using data transmission capabilities of digital terrestrial broadcasting networks
|
Russian Federation
|
Q133/6
|
2018-10-03 |
|
[ 429 ]
|
Information on medium frequency broadcast operation and listening in portions of Region 2 for WPT Impact Assessment
|
North American Broadcasters Association (NABA)
|
|
2018-10-02 |
|
[ 428 ]
|
Liaison statement to Working Parties 5A, 5C, 5D and 6A - Report ITU-R SA.[460 MHZ METSAT-EESS]
|
WP 7B
|
|
2018-10-02 |
|
[ 427 ]
|
Liaison statement to Working Parties 4C, 5A, 5B, 5C and 6A - Characteristics and protection criteria for aeronautical mobile (route) systems operating in the frequency band 117.975-137 MHz
|
WP 7B
|
AI1.7
|
2018-10-02 |
|
[ 426 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D concerning WRC-19 agenda item 1.7 - WRC-19 agenda item 1.7
|
WP 7B
|
AI1.7
|
2018-10-01 |
|
[ 425 ]
|
Preliminary draft revision to Report ITU-R BT.2386-1 - Digital terrestrial broadcasting: Design and implementation of single frequency networks (SFN)
|
China (People's Republic of)
|
Q102/6
|
2018-09-30 |
|
[ 424 ]
|
Performance evaluation for DTMB receivers under VHF and UHF band
|
China (People's Republic of)
|
Q136/6
|
2018-09-30 |
|
[ 423 ]
|
Liaison statement on work being carried out under study in ITU-T Question 3/5
|
ITU-T SG 5
|
|
2018-10-01 |
|
[ 422 ]
|
Laboratory test results for CDR receiver
|
China (People's Republic of)
|
Q136/6
|
2018-09-30 |
|
[ 421 ]
|
Liaison statement to Working Party 1A (copy to Working Parties 1B, 5B, 5C, 6A and 7D for information) - Preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems
|
WP 7A
|
|
2018-09-28 |
|
[ 420 ]
|
Liaison statement to ITU-R Working Parties 6A, 6B, 6C and 7D - Update of Report ITU-R BO.2071-1 "BSS system parameters between 17.3 GHz and 42.5 GHz and associated feeder links"
|
WP 4B
|
|
2018-09-04 |
|
[ 419 ]
|
Liaison statement on work which is under study in ITU-T Q3/5
|
ITU-T SG 5
|
|
2018-08-27 |
|
[ 418 ]
|
Terrestrial broadcasting service
|
Guinea (Republic of)
|
|
2018-08-20 |
|
[ 417 ]
|
Reply liaison statement to Working Party 5D (copy for information to Working Party 6A) - Working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY]
|
WP 4A
|
AI9.1
|
2018-07-24 |
|
[ 416 ]
|
Reply liaison statement to Working Party 5D (copy for information to Working Party 6A) - Draft CPM text for WRC-19 agenda item 9.1, Issue 9.1.2
|
WP 4A
|
AI9.1
|
2018-07-24 |
|
[ 415 ]
(Rev.1) |
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) «Definition of time scale and dissemination of time signals via radiocommunication systems» regarding FSS/MSS/BSS
|
WP 4B
|
|
2018-07-06 |
|
[ 414 ]
|
Liaison statement to Working Parties 5A and 6A - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5 kHz]
|
WP 3L
|
|
2018-07-02 |
|
[ 413 ]
|
Liaison statement to Working Parties 1A, 5A, 5B and 6A (copy to Working Party 1B for information) - Preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz]
|
WP 3L
|
|
2018-07-02 |
|
[ 412 ]
|
Reply liaison statement to Working Party 6A - Location variability in land area-coverage prediction
|
WP 3K
|
|
2018-07-02 |
|
[ 411 ]
|
Reply liaison statement to Working Party 6A - Use of modulation error ration (MER) to assess ducting
|
WP 3K
|
|
2018-07-02 |
|
[ 410 ]
|
Reply liaison statement to Working Parties 5A, 5B and 6A (copy to Working Party 1B) - Preliminary draft new Report ITU-R SM.[WPT_100-148.5KHZ]
|
WP 1A
|
Q210/1
|
2018-07-02 |
|
[ 409 ]
|
Liaison statement to Working Parties 5A, 5B, 6A and 7A (copy to Working Party 1B for information) on preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems
|
WP 1A
|
Q210/1
|
2018-06-29 |
|
[ 408 ]
|
Liaison statement to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid utility management systems
|
WP 1A
|
|
2018-06-29 |
|
[ 407 ]
|
Reply liaisons statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7D) - Liaison activities on the G.mgfast PSD specification
|
WP 1A
|
|
2018-06-29 |
|
[ 406 ]
|
Reply liaison statement to Working Party 6A (copy to Working Parties 1A, 5B and 7A) - Draft CPM text on WRC-19 agenda item 9.1, issue 9.1.6
|
WP 1B
|
AI9.1
|
2018-06-28 |
|
[ 405 ]
|
Reply liaison statement to Working Parties 6A, 6B and 6C on revision of Report ITU-R M.2373 - Audio-visual capabilities and applications supported by terrestrial IMT systems
|
WP 5D
|
|
2018-06-27 |
|
[ 404 ]
|
Liaison statement to CISPR and ITU-T Study Group 5 on EMC standards and limits (copy to ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C & 7D) - Further Reports of Disturbances to Radiocommunication systems
|
WP 1A
|
|
2018-06-21 |
|
[ 403 ]
|
Reply liaison statement to Working Party 7A (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 6B, 6C, 7B, 7C, and 7D) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" and UTC application in IMT systems
|
WP 5D
|
|
2018-06-21 |
|
[ 402 ]
|
Liaison statement to Working Party 4A (copy for information to Working Party 6A) - Draft CPM text for agenda item 9.1, issue 9.1.2
|
WP 5D
|
|
2018-06-21 |
|
[ 401 ]
|
Liaison statement to Working Party 6A (copied for information to Working Parties 3K, 3M, 5B and 5C) - Updated on work towards WRC-19 agenda item 1.1
|
WP 5A
|
|
2018-06-06 |
|
[ 400 ]
|
Reply liaison statement to Working Party 6A - WRC-19 agenda item 1.11
|
WP 5A
|
|
2018-06-01 |
|
[ 399 ]
|
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 3L, 5B and 6A) - Applicability of Recommendation ITU-R M.1732 for use in studies undertaken in working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz]
|
WP 5A
|
|
2018-05-31 |
|
[ 398 ]
|
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 3L and 6A) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5 kHz]
|
WP 5A
|
|
2018-05-31 |
|
[ 397 ]
|
Reply liaison statement to Working Party 1A (copy to Working Parties 1B, 3L, 5A, and 6A) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5 kHz]
|
WP 5B
|
|
2018-05-30 |
|
[ 396 ]
|
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Study Group 6 and Working Party 6A on collaboration
|
ITU-D SG 1
|
|
2018-05-22 |
|
[ 395 ]
|
Reply liaison statement to Working Party 6A - Technical and operational characteristics for systems operating within the 40-50 MHz frequency range (WRC-23 preliminary agenda item 2.2)
|
WP 7C
|
|
2018-05-22 |
|
[ 394 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D concerning WRC-19 agenda item 1.7 - Status of WRC-19 agenda item 1.7
|
WP 7B
|
AI1.7
|
2018-05-21 |
|
[ 393 ]
(Rev.1) |
Reply liaison statement to Working Party 4A (copy to Working Parties 5B, 5C, 5D, 6A, 7B, 7C for information) - Working document towards a preliminary draft new Report ITU-R S.[50/40 GHz adjacent band studies] - Protection of EESS (passive) and RAS systems for non-GSO fixed satellite systems operating in the 37.5-42.5 GHz, 47.2-50.2 GHz and 50.4-51.4 GHz frequency bands
|
WP 7D
|
AI1.6
|
2018-05-21 |
|
[ 392 ]
|
Liaison statement from ITU-D Study Group 2 on disaster relief use cases
|
ITU-D SG 2
|
|
2018-05-21 |
|
[ 391 ]
|
Liaison statement on invitation to update the information in the IMT-2020 roadmap
|
Chairman, ITU-T JCA-IMT2020
|
|
2018-05-14 |
|
[ 390 ]
|
Liaison statement to Working Party 6A and Working Party 6C - Preliminary draft new Question ITU-R [AI4BC]/6 on the use of Artificial Intelligence in Broadcasting
|
WP 6B
|
|
2018-05-08 |
Results:589 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):