International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Transport, access and home

Study Period 2017

Results:2858 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1460 ]  
 
Proposal for the short-term phase transient response     ZTE Corporation (China)   Q13/15   2019-06-18
[ 1459 ]  
 
G.mtn Option 1 Path Overhead     Nokia USA (United States)   Q11/15   2019-06-18
[ 1458 ]  
 
G.mtn scope of applicability and need for bonding     Nokia USA (United States)   Q11/15   2019-06-18
[ 1457 ]  
 
Proposal for time synchronization OAM     ZTE Corporation (China)   Q13/15   2019-06-18
[ 1456 ]  
 
Proposal for frequency synchronization OAM     ZTE Corporation (China)   Q13/15   2019-06-18
[ 1455 ]  
 
G.mgfast: Management of QoS     ADTRAN (United States)   Q4/15   2019-06-18
[ 1454 ]  
 
G.mtn-related Recommendations and Possible Schedule     Nokia USA (United States)   Q11/15   2019-06-18
[ 1453 ]  
 
G.mgfast: Control of proactive retransmissions     ADTRAN (United States)   Q4/15   2019-06-18
[ 1452 ]  
 
Use of 66B block coding and IEEE state machines and processes in Ethernet, FlexE, and G.mtn     Nokia USA (United States)   Q11/15   2019-06-18
[ 1451 ]  
 
Considerations on Sub-1G services and flexible mapping over OTN     China Information Communication Technologies Group , China Telecommunications Corporation , Ministry of Industry and Information Technology (MIIT) (China)   Q11/15   2019-06-18
[ 1450 ]  
 
Considerations on sub-1G switching and smooth transport network transition     China Information Communication Technologies Group , China Telecommunications Corporation , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q11/15   2019-06-18
[ 1449 ]  
(Rev.1) 
Proposal to update G.sup49 - "Rogue optical network unit (ONU) considerations"     ADTRAN (United States) , Calix Networks, Inc. (United States) , Verizon Communication Corporation (United States)   Q2/15   2019-06-18
[ 1448 ]  
 
Updated simulation results for oFEC and a discussion about CFEC+     Acacia Communications, Inc (United States)   Q11/15   2019-06-18
[ 1447 ]  
 
25G and 50G OTN interfaces     Nokia USA (United States)   Q11/15   2019-06-18
[ 1446 ]  
 
PRTC-B Multi-band GNSS Chipset evaluation results     Deutsche Telekom AG (Germany)   Q13/15   2019-06-18
[ 1445 ]  
 
G.fastback Use Cases Appendix     British Telecommunications Public Ltd. Co. (BT Plc) (United Kingdom)   Q4/15   2019-06-18
[ 1444 ]  
 
Proposal of MPLS-TP OAM model for clause 7 in G.8152.1     China Information Communication Technologies Group , China Mobile Communications Corporation   Q14/15   2019-06-18
[ 1443 ]  
 
Proposal on G.8052.2 for attributes and operations of ELP     China Information Communication Technologies Group , China Mobile Communications Corporation   Q14/15   2019-06-18
[ 1442 ]  
 
Attributes and Operations of ERP object classes in G.8052.2     China Information Communication Technologies Group , China Mobile Communications Corporation   Q14/15   2019-06-18
[ 1441 ]  
 
Proposal on Linear Protection group for G.8152.2     China Information Communication Technologies Group , China Mobile Communications Corporation   Q14/15   2019-06-18
[ 1440 ]  
(Rev.1) 
25G & 50G OTN interface frame signal and multiplex structure     China Information Communication Technologies Group , Intel Corporation (United States)   Q11/15   2019-06-18
[ 1439 ]  
 
Consideration on OTN encryption     Huawei Technologies Co., Ltd. (China)   Q11/15   2019-06-18
[ 1438 ]  
 
Consideration on OTN network security     Huawei Technologies Co., Ltd. (China)   Q14/15, Q12/15, Q11/15   2019-06-18
[ 1437 ]  
 
Typical examples of Fiber Distribution Box for Appendix II of draft new L.fdb     Sterlite Optical Technologies Ltd (India)   Q16/15   2019-06-18
[ 1436 ]  
 
G.hsp 25G and 50G upstream wavelength plan     Futurewei Technologies US R&D Center (United States) , Nokia Corporation (Finland)   Q2/15   2019-06-18
[ 1435 ]  
 
G.8271.1 Network Limit     Calnex Solutions Limited (United Kingdom)   Q13/15   2019-06-18
[ 1434 ]  
 
G.8271.1 Measurement Bandwidth for Relative Time Error Network Limit     Calnex Solutions Limited (United Kingdom)   Q13/15   2019-06-18
[ 1433 ]  
 
Distributed ePRTC     ADVA Optical Networking (United Kingdom)   Q13/15   2019-06-18
[ 1432 ]  
 
G.hn BPL - Resignation protocol     Integration Silicon Solution Israel ISSI   Q18/15   2019-06-18
[ 1431 ]  
 
G.8271.1 Relative Time Error Network Limit for Categories 6A and 6B     Calnex Solutions Limited (United Kingdom)   Q13/15   2019-06-18
[ 1430 ]  
 
G.hs: Considerations on P2MP handshake     Broadcom Corporation (United States)   Q4/15   2019-06-18
[ 1429 ]  
 
EVM_RMS measurements using DP-16QAM format     Huawei Technologies Co., Ltd. (China)   Q6/15   2019-06-18
[ 1428 ]  
 
G.mgfast: Updated LDPC code     Broadcom Corporation (United States)   Q4/15   2019-06-18
[ 1427 ]  
 
G. fast: On the use of VCE sections in probe sequence for G.fastback.     Broadcom Corporation (United States)   Q4/15   2019-06-18
[ 1426 ]  
 
G.fast: Proposal to exchange Tret information for DTA     Broadcom Corporation (United States)   Q4/15   2019-06-18
[ 1425 ]  
 
Comments on G.8052.2 FC and LTP object classes     Huawei Technologies Co., Ltd. (China)   Q14/15   2019-06-18
[ 1424 ]  
 
G.mgfast: Proposal for DOI using time and frequency intervals allocated to single line     Broadcom Corporation (United States)   Q4/15   2019-06-18
[ 1423 ]  
 
Comments on G.8052.1 Termination Points     Huawei Technologies Co., Ltd. (China)   Q14/15   2019-06-18
[ 1422 ]  
 
Proposed updates to BNM insert process description in G.8021     Huawei Technologies Co., Ltd. (China)   Q10/15   2019-06-18
[ 1421 ]  
 
Proposed updates to BNM transmission description in G.8013     Huawei Technologies Co., Ltd. (China)   Q10/15   2019-06-18
[ 1420 ]  
 
G.8272 Clarifications     Calnex Solutions Limited (United Kingdom)   Q13/15   2019-06-18
[ 1419 ]  
 
G.8273.2 Appendix VI Typos     Calnex Solutions Limited (United Kingdom) , Huawei Technologies Co., Ltd. (China)   Q13/15   2019-06-18
[ 1418 ]  
(Rev.1) 
Proposed characteristics for 25G and 50G OTN interfaces     China Information Communication Technologies Group , China Telecommunications Corporation , Intel Corporation (United States) , Microsemi Corporation (United States) , Viavi Solutions Deutschland GmbH (Germany) , ZTE Corporation (China)   Q11/15   2019-06-18
[ 1417 ]  
 
Comments and proposed updates to draft revised G.808.2     Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))   Q11/15   2019-06-18
[ 1416 ]  
 
Proposal to new appendix for in-home cable applications     China Information Communication Technologies Group   Q16/15   2019-06-18
[ 1415 ]  
 
Power Penalty for Chirp Parameters in Negative Dispersion Region     Nokia USA (United States)   Q2/15   2019-06-18
[ 1414 ]  
 
MTN path OAM requirements     ZTE Corporation (China)   Q11/15   2019-06-18
[ 1413 ]  
 
Analysis of the potential deviation of the POH through multiple hops     ZTE Corporation (China)   Q11/15   2019-06-18
[ 1412 ]  
 
TDEC considerations for 50G-PON     China Information Communication Technologies Group   Q2/15   2019-06-18
[ 1411 ]  
 
Proposals about the 200G DWDM     ZTE Corporation (China)   Q6/15   2019-06-18
Results:2858 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2022-01-20