Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 35 ]
|
Proposed modification on "Reconfigurable Processor" in the working document towards a preliminary draft new Report Technology Trends
|
FUJITSU Ltd.
|
|
2003-09-25 |
|
[ 34 ]
|
Policies for in-band migration to IMT-2000 for the ITU-D Question 18/2 mid-term guidelines
|
United States of America
|
|
2003-09-25 |
|
[ 33 ]
|
Modifications to ITU-R WP 8F Workplan to reflect results of WRC-03 and CPM06-1
|
United States of America
|
229/8
|
2003-09-25 |
|
[ 32 ]
|
New naming for systems beyond IMT-2000
|
United States of America
|
|
2003-09-25 |
|
[ 31 ]
|
Recommendations for changes to working document towards a preliminary draft new Recommendation (PDNR) - Software defined radio and related technologies [IMT.SDR]
|
United States of America
|
|
2003-09-25 |
|
[ 30 ]
+Add.1 |
Proposed modifications to working document towards a preliminary draft new Report on Mitigating techniques to address coexistence between IMT-2000 TDD and FDD radio interface technologies within the frequency range 2 500-2 690 MHz operating in adjacent bands and in the same geographical area
|
United States of America
|
|
2003-09-25 |
|
[ 29 ]
|
Suggested edits to the mid-term guidelines
|
United States of America
|
|
2003-09-25 |
|
[ 28 ]
|
Proposal for the preliminary draft new Report on Services and Market aspects of future evolution of IMT-2000
|
France Telecom
|
229-1/8
|
2003-09-25 |
|
[ 27 ]
(Rev.1) |
Report on activities in Africa on Market and Services
|
Regional Coordinator for Africa on Services and...
|
|
2003-09-25 |
|
[ 26 ]
|
Considerations regarding SDR from operator perspective for the development of PDNR IMT.SDR
|
Telefonica de Espana
|
|
2003-09-25 |
|
[ 25 ]
|
Proposed actions within WP 8F relating to the impact of UWB on IMT-2000
|
United Kingdom of Great Britain and Northern Ireland
|
|
2003-09-25 |
|
[ 24 ]
|
Proposed liaison statement from WP 8F to WP 8D - Studies in preparation for WRC-07
|
United Kingdom of Great Britain and Northern Ireland
|
|
2003-09-25 |
|
[ 23 ]
(Rev.1) |
Future work in WP 8F regarding satellite issues
|
United Kingdom of Great Britain and Northern Ireland
|
|
2003-09-25 |
|
[ 22 ]
|
Streamlining the work in WP 8F
|
Finland
,
Germany (Federal Republic of)
,
Sweden
|
|
2003-09-24 |
|
[ 21 ]
|
Information relevant to working document towards PDNR software defined radio and related technologies
|
Software Defined Radio Forum
|
|
2003-09-24 |
|
[ 20 ]
(Rev.1) |
WP 8F workshop on services and market aspects
|
WP 8F Management team
|
|
2003-09-24 |
|
[ 19 ]
|
Proposals for completion of "Working document towards a preliminary draft new Report on mitigating techniques to address coexistence between IMT-2000 TDD and FDD radio interface technologies within the frequency range 2 500-2 690 MHz operating in adjacent bands and in the same geographical area"
|
United Kingdom of Great Britain and Northern Ireland
|
|
2003-09-24 |
|
[ 18 ]
|
Update material for CDMA MC for Recommendation ITU-R M.1457-4 Section 5.2
|
Director, BR
|
229/8
|
2003-09-23 |
|
[ 17 ]
|
UWB compatibility studies with IMT-2000 systems
|
Intel Corporation
|
|
2003-09-23 |
|
[ 16 ]
|
Development of a frequency arrangement for the band 2 500-2 690 MHz
|
France
|
|
2003-09-22 |
|
[ 15 ]
|
Proposed text for Service view document
|
Japan
|
229/8
|
2003-09-22 |
|
[ 14 ]
|
Proposed modifications to workplan and structure of preliminary draft new Report IMT.MARKET/SERV
|
Japan
|
229/8
|
2003-09-22 |
|
[ 13 ]
|
Proposed guidelines for developing the working document on spectrum calculation methodology of future development of IMT-2000 and systems beyond IMT-2000
|
Japan
|
229/8
|
2003-09-22 |
|
[ 12 ]
|
Proposed modifications to the working document on spectrum calculation methodology of future development of IMT-2000 and systems beyond IMT-2000
|
Japan
|
229/8
|
2003-09-22 |
|
[ 11 ]
|
Proposed modifications to micro workplan for working document on methodology for calculation of spectrum requirements
|
Japan
|
229/8
|
2003-09-22 |
|
[ 10 ]
|
Consideration on the phrase "The future development of IMT-2000 and systems beyond IMT-2000"
|
Japan
|
229/8
|
2003-09-22 |
|
[ 9 ]
|
Working method for working document towards a preliminary draft new Report on Technology Trends
|
Japan
|
229/8
|
2003-09-22 |
|
[ 8 ]
|
DECT-information regarding the update of Recommendation ITU-R M.1457
|
ETSI
|
229/8
|
2003-09-15 |
|
[ 7 ]
|
Working document towards a preliminary draft new Report on Technology Trends
|
Technology Trends Report Rapporteur
|
|
2003-08-27 |
|
[ 6 ]
|
Liaison statement on the NGN 2004 ITU-T project
|
ITU-T SG 13
|
|
2003-08-25 |
|
[ 5 ]
|
Liaison statement on the ITU-T IP project
|
ITU-T SG 13
|
|
2003-08-25 |
|
[ 4 ]
|
Liaison statement - Comments on QoS work based on draft ITU-T Recommendation Y.qsar
|
ITU-T SG 13
|
|
2003-08-25 |
|
[ 3 ]
|
Liaison statement on status of ITU-T draft Recommendation Q.SNFB
|
ITU-T SSG
|
|
2003-07-25 |
|
[ 2 ]
|
Process for development and approval of Amendments and Edition 2 of the Handbook on deployment of IMT-2000
|
ITU-T SSG
|
|
2003-07-25 |
|
[ 1 ]
|
Documents to be carried over from the 2000-2003 study period
|
WP 8F
|
|
2003-07-21 |
Results:1385 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28
|