International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1B  C 

ITU-R WP1B

Spectrum management methodologies

Results:321 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 196 ]  
 
Proposed changes to the working document towards draft CPM text on WRC-12 Agenda item 1.2     Germany (Federal Republic of) , Netherlands (Kingdom of the) , Sweden , United Kingdom of Great Britain and Northern Ireland     2010-01-25
[ 195 ]  
 
Proposed liaison statement to ITU-T Study Group 17 - WRC-12 Agenda item 1.19     Italy     2010-01-25
[ 194 ]  
 
Revision of Report ITU-R SM.2012-2 - Economic aspects of spectrum management - Report on the activities within the Correspondence Group     United Arab Emirates     2010-01-25
[ 193 ]  
 
Annex to the Report of the Chairman of the Correspondence Group on revision of Report ITU-R SM.2012-2 - Economic aspects of spectrum management - Working document towards a preliminary draft revision of Report ITU-R SM.2012-2     United Arab Emirates     2010-01-25
[ 192 ]  
 
Proposed modification to the working document towards draft CPM text on WRC-12 Agenda item 1.19     United Arab Emirates     2010-01-25
[ 191 ]  
 
WRC-12 Agenda item 1.19 - Proposed revisions to the working document towards draft CPM text     Asia Satellite Telecommunications Co. Ltd.     2010-01-25
[ 190 ]  
 
Working document towards the harmonization of frequency bands for SRD - Frequency bands regionally or globally available for short-range devices (SRDs)     Netherlands (Kingdom of the)   213/1   2010-01-25
[ 189 ]  
 
Proposed revisions to the working document towards a preliminary draft new Report ITU-R SM.[RFID] - Technical characteristics, standards and frequency bands of operation for RFID and potential harmonization opportunities     Australia     2010-01-25
[ 188 ]  
 
Proposed revisions to the working document towards the harmonization of frequency bands for SRD - Frequency bands regionally or globally available for short-range devices (SRDs)     Australia   213/1   2010-01-25
[ 187 ]  
 
Proposed revisions to the working document towards draft CPM text on WRC-12 Agenda item 1.2     Canada     2010-01-25
[ 186 ]  
 
Proposed revision to working document towards a preliminary draft new Report on enhancing the International Regulatory Framework in relation to WRC-12 Agenda item 1.2     Canada     2010-01-25
[ 185 ]  
 
Proposed revisions to working document towards the harmonization of frequency bands for SRD - Frequency bands regionally or globally available for short-range devices (SRDs)     Canada     2010-01-25
[ 184 ]  
 
Proposed modifications to the working document towards draft CPM text on WRC-12 Agenda item 1.19     Canada     2010-01-25
[ 183 ]  
 
Proposed revisions to working document to advance work of WRC-12 Agenda item 1.22     Canada     2010-01-25
[ 182 ]  
 
Proposed revisions to the working document towards draft CPM text on WRC-12 Agenda item 1.19     Korea (Republic of)     2010-01-24
[ 181 ]  
 
Working document towards draft CPM text on WRC-12 Agenda item 1.2     Korea (Republic of)     2010-01-24
[ 180 ]  
 
Proposed modification of Report ITU-R SM.2093     Korea (Republic of)     2010-01-24
[ 179 ]  
 
Working document towards a preliminary draft revision of Report ITU-R SM.2012-2     Korea (Republic of)     2010-01-24
[ 178 ]  
 
Working document towards a preliminary draft new Report ITU-R SM.[RFID]     Korea (Republic of)     2010-01-24
[ 177 ]  
 
Text for preliminary draft new Recommendation ITU-R [SRD-HRM]     Korea (Republic of)   213/1   2010-01-24
[ 176 ]  
 
Comments to the ITU-R Recommendations and Reports assigned to ITU-R Working Party 1B     Korea (Republic of)     2010-01-24
[ 175 ]  
 
Working document towards draft CPM text on WRC-12 Agenda item 1.19     United States of America     2010-01-22
[ 174 ]  
 
Working document towards draft CPM text on WRC-12 Agenda item 1.2     United States of America     2010-01-22
[ 173 ]  
 
Analysis of the impact to the fixed-satellite service of proposed changes to the definitions of fixed and mobile services     United States of America     2010-01-22
[ 172 ]  
 
Brazil's experience with spectrum FEES - Review of time 5.2.10 of Report ITU-R SM.2012-2     Brazil (Federative Republic of)     2010-01-22
[ 171 ]  
 
Preliminary draft revision of ITU-R SM.1413-2 - Radiocommunication Data Dictionary (RDD)     United Kingdom of Great Britain and Northern Ireland     2010-01-22
[ 170 ]  
 
Comments on the working document towards draft CPM text on WRC-12 Agenda item 1.19     CBS, Inc.     2010-01-21
[ 169 ]  
+Corr.1 
Additional information for the preparation of the draft CPM Report to WRC-12     Chairman, CPM-11     2010-01-22
[ 168 ]  
 
Comments on the working document towards draft CPM text on WRC-12 Agenda item 1.19     North American Broadcasters Association (NABA)     2010-01-20
[ 167 ]  
 
Comments on the working document towards draft CPM text on WRC-12 Agenda item 1.19     World Broadcasting Unions - Technical Committee     2010-01-20
[ 166 ]  
 
Proposed modification to the working document towards draft CPM text on WEC-12 Agenda item 1.19     Russian Federation     2010-01-20
[ 165 ]  
 
Preliminary draft revisions to Report ITU-R SM.2153 "Technical and operating parameters and spectrum use for short-range radiocommunication devices"     Russian Federation     2010-01-20
[ 164 ]  
 
Development of CPM text for WRC-12 Agenda item 1.2     Iran (Islamic Republic of)     2010-01-11
[ 163 ]  
 
WRC-12 Agenda item 1.2     Iran (Islamic Republic of)     2010-01-11
[ 162 ]  
 
Liaison statement to Working Party 1B - WRC-12 Agenda item 1.19     WP 6A     2009-12-08
[ 161 ]  
 
Reply liaison statement to ITU-D Study Group 2 - Resolution 9 (Rev. DOHA, 2006), draft guidelines for the establishment of a system of fees (copy for information to Working Parties 1B and 1C)     ITU-R SG 1     2009-10-09
[ 160 ]  
 
Liaison statement to Working Parties 1B, 3K, 4A, 5A, 5D, 6A and 7C - WRC-12 Agenda item 1.22     WP 1A     2009-10-09
[ 159 ]  
 
Liaison statement to Working Party 1B on the study of software-defined radio and cognitive radio systems     WP 7B     2009-09-29
[ 158 ]  
+Ann.1-9 
Report of the meeting of Working Party 1B (Geneva, 17 to 23 September 2009)     Chairman, WP 1B     2009-09-23
[ 157 ]  
 
Final List of Participants - Geneva, 17-23 September 2009     Director, BR     2009-09-23
[ 156 ]  
 
Preliminary review of ITU-R Questions assigned to Study Group 1     Rapporteur Group on ITU-R Questions     2009-09-21
[ 155 ]  
 
Liaison statement - Impact of short-range devices using ultra-wideband technology on FSS earth station receivers (WRC-12 Agenda item 1.22)     WP 4A     2009-09-17
[ 154 ]  
 
List of documents issued     BR Study Group Department     2009-09-16
[ 153 ]  
(Rev.1) 
To the working document towards preliminary draft new Report on enhancing the international spectrum regulatory framework - In relation to WRC-12 Agenda item 1.2     Egypt (Arab Republic of) , Lebanon , Syrian Arab Republic , United Arab Emirates     2009-09-11
[ 152 ]  
 
Proposed liaison statement to Working Party 5A     Nokia Corporation , Nokia Siemens Networks & Co. KG.     2009-09-10
[ 151 ]  
 
WRC-12 Agenda item 1.19 - Cognitive radio systems operating in the FSS/BSS bands     Asia Satellite Telecommunications Co. Ltd.     2009-09-10
[ 150 ]  
 
Proposed Liaison statement to Working Party 5C (copy to Working Party 5A for information)     Finland     2009-09-10
[ 149 ]  
 
Proposed Liaison statement to Working Party 7D (copy to Working Party 5A for information)     Finland     2009-09-10
[ 148 ]  
 
Development of CPM text for WRC-12 Agenda item 1.19     Finland , Netherlands (Kingdom of the)     2009-09-10
[ 147 ]  
 
Considerations for software defined radio (SDR) and cognitive radio systems (CRS) for WRC-12 Agenda item 1.19     Luxembourg     2009-09-10
Results:321 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2013-07-01