International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient orbit/spectrum utilization for FSS and BSS

Results:609 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 484 ]  
 
Proposed modifications to element for a working document towards a preliminary draft new report - Coordination arc applicable to GSO/GSO FSS under RR No.9.7 in the 6/4 GHz and 14/10/11/12 GHz frequency bands     Japan     2011-04-21
[ 483 ]  
 
Proposed upgrade of preliminary draft revision of Recommendation ITU-R SF.675-3 to draft revision of Recommendation "Calculation of the maximum power density (averaged over 4 KHz) of an angle modulated carrier"     Japan     2011-04-21
[ 482 ]  
 
Framework for developing a preliminary draft new Recommendation ITU-R BO.[PROTECT_BSS_FROM_TERR] - Protection criteria for the broadcasting-satellite service in the band 21.4-22 GHz in Regions 1 and 3 from terrestrial services     Japan   283/4   2011-04-21
[ 481 ]  
 
Liaison statement - Techniques designed to increase the potential for sharing between IMT systems and FSS networks in the 3.4-3.6 band     WP 5D     2011-04-21
[ 480 ]  
 
ITU-R Study Group 6 Recommendation ITU-R BT.1833-1 to be brought to the attention of Study Group 4     BR Study Group Department     2011-04-14
[ 479 ]  
 
Working document on a statistical methodology to assess time-varying interference produced by a network of small Earth stations onto geostationary fixed-satellite service networks     United States of America   208/4   2011-04-07
[ 478 ]  
 
Liaison statement to Working Party 5B - Preliminary draft new Report ITU-R M.[UAS-PERF-AND-REQ] - Example of characteristics and potential performance requirements for unmanned aircraft control and non payload communications (CNPC) links     United States of America     2011-04-07
[ 477 ]  
 
Liaison statement to Working Party 5D - Techniques designed to increase the potential for sharing between IMT Systems and FSS networks in the 3.4-3.6 GHz band     United States of America     2011-04-07
[ 476 ]  
 
Preliminary draft new Recommendation ITU-R S.[ISS-NON-GSO] - Protection criteria and interference assessment methods for non-GSO inter-satellite links in the 23.183-23.377 GHz band with respect to the space research service     United States of America     2011-04-07
[ 475 ]  
 
Preliminary draft new Recommendation ITU-R [SF].[STATMETH] - Basic requirements for a methodology to calculate the statistics of interference received by fixed service stations from FSS/BSS space-to Earth emissions for frequency bands above about 17 GHz     United States of America     2011-04-07
[ 474 ]  
 
Preliminary draft revision of Recommendation ITU-R S.732 - Method for statistical processing of earth-station antenna side-lobe peaks     United States of America     2011-04-07
[ 473 ]  
 
Proposed revisions to Recommendation ITU-R SF.675 - Calculation of the maximum power density (averaged over 4 kHz) of an angle modulated carrier     United States of America     2011-04-07
[ 472 ]  
 
Preliminary draft revision of Recommendation ITU-R S.729 - Control and monitoring function of very small aperture terminals (VSATs)     United States of America     2011-04-07
[ 471 ]  
 
Result of the proposed suppression of Recommendations ITU-R SF.1482 and SF.1483     Chairmen, SG 4 and SG 5     2011-04-01
[ 470 ]  
 
Note to Chairmen of Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Consideration of draft revision of Recommendation ITU-R F.758-4     Chairman, WP 5C     2011-04-01
[ 469 ]  
 
Liaison statement to ITU-R Working Parties 4B and 4A     ITU-D SG 2     2011-03-28
[ 468 ]  
 
ITU-R Study Group 6 Report ITU-R BT.2049-4 to be brought to the attention of Study Group 4     BR Study Group Department     2011-03-11
[ 467 ]  
 
ITU-R Study Group 1 Recommendation SM.1541-3 to be brought to the attention of Study Groups 4, 5, 6 and 7     BR Study Group Department     2011-02-07
[ 466 ]  
 
This document has been withdrawn     WP 5C     2011-01-10
[ 465 ]  
 
Liaison statement to Study Group 4 - Results of the Study Group 5 meeting (22-23 November 2010) (copied to Working Parties 4A, 5A and 5C for information)     SG 5     2010-12-16
[ 464 ]  
 
Liaison statement to Working Parties 1A, 1C, 4A, 5A, 5D, 7B and 7D - Spreadsheet implementation of the clear-air portion of Recommendation ITU-R P.452-14     WP 3M     2010-12-08
[ 463 ]  
 
Liaison statement to Working Party 4A (copy to Working Party 5C for information)     WP 3J     2010-12-08
[ 462 ]  
 
Liaison statement to Working Party 4A - Revision of Recommendation ITU-R F.1245     WP 5C     2010-11-29
[ 461 ]  
 
Liaison statement to Working Party 4A - Review of certain SF-series Recommendations     WP 5C     2010-11-29
[ 460 ]  
 
Liaison statement to Working Parties 4A and 4B - Examples of characteristics and potential performance requirements for unmanned aircraft control and non payload communications (CNPC) links     WP 5B     2010-11-26
[ 459 ]  
 
Liaison statement to Working Parties of ITU-R Study Groups 4, 6 and 7, as well as Working Parties 5A, 5B and 5D - Studies in support of WRC-12 Agenda item 1.5     WP 5C     2010-11-22
[ 458 ]  
 
Liaison statement to Working Party 4A - Statistical methodology for assessing the interference of the satellite services on a fixed service deployment     WP 5C     2010-11-19
[ 457 ]  
 
Note from the Chairman of Study Group 4 to the Chairmen of Study Group 5 and Working Party 5A (copy to Working Party 4A) - Comments on draft new Report ITU-R S.[BWA-FSS]     SG 4     2010-11-18
[ 456 ]  
 
Liaison statement to Working Party 4A - Techniques designed to increase the potential for sharing between IMT systems and FSS networks in the 3.4-3.6 GHz band     WP 5D     2010-11-17
[ 455 ]  
 
Liaison statement to Working Party 4A (copy to Working Party 5C) - Propagation basis for the determination of long-term interference     WP 3M     2010-11-16
[ 454 ]  
 
Liaison statement to Working Party 4A - Revision of Recommendation ITU-R SF.675-3     WP 5C     2010-11-23
[ 453 ]  
 
Liaison statement to Working Parties 3M and 3J (copied to Working Party 4A for information) - Annual and monthly propagation statistics     WP 5C     2010-11-15
[ 452 ]  
 
Note from the Chairman of Working Party 5A to the Chairman of Study Group 4 (copy to the Chairman of Working Party 4A and the Chairman of Study Group 5)     WP 5A     2010-11-15
[ 451 ]  
(Rev.1) 
Liaison statement to ITU-R Study Groups - Methodology for calculation of maximum [PERMISSIBLE] power flux-density limits for the protection of digital terrestrial television broadcasting services from interference generated by mobile services including IMT systems where identified in the Radio Regulations     WP 6A   208/4   2010-11-08
[ 450 ]  
 
Liaison statement to Working Party 4C (for information to Working Parties 4A, 4B, 5A, 5D and 6B) - Preliminary draft new Report ITU-R M.[SAT-IMT-ADVANCED], titled "Vision and requirements for the satellite radio interface(S) of IMT-Advanced"     WP 6A     2010-11-05
[ 449 ]  
 
Liaison statement to Working Party 4A - Sharing between SRS and FSS systems in the 37.5-38 GHz band     WP 7B   211/7   2010-10-21
[ 448 ]  
 
Liaison statement to Working Party 4A - Preliminary draft new Recommendation on protection criteria and interference assessment methods for non-GSO inter-satellite links in the 23.183-23.377 GHz band with respect to the space research service     WP 7B     2010-10-20
[ 447 ]  
 
Liaison statement to Working Party 6B (copy to Working Party 4A for information) - Proposed revisions to the working document towards a preliminary draft revision of Recommendation ITU-R BO.789-2     WP 4B     2010-07-27
[ 446 ]  
+Ann.1-23 
Report on the meeting of Working Party 4A (Geneva, 7 - 15 July 2010)     Chairman, WP 4A     2010-07-16
[ 445 ]  
 
Final List of Participants - Working Party 4A (Geneva, 7-15 July 2010)     Director, BR     2010-07-15
[ 444 ]  
 
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7B, 7C and 7D - Information on studies related to WRC-12 Agenda item 1.25     WP 4C     2010-07-13
[ 443 ]  
 
Liaison statement to Working Party 6B and Working Party 4A - Further response to comments on the proposed treatment of Recommendations of former Working Party 6S     WP 4B     2010-07-08
[ 442 ]  
 
Liaison statement to Working Parties 4A, 4B, 6A, 6B, 6C - Activities on satellite radio interface technology of IMT-ADVANCED     WP 4C     2010-07-08
[ 441 ]  
 
List of documents issued     BR Study Group Department     2010-07-06
[ 440 ]  
 
Liaison statement to Working Party 4A - Parameters for compatibility studies between non-GSO-ISS systems and SRS systems under WRC-12 Agenda item 1.11     WP 7B     2010-07-06
[ 439 ]  
 
WRC-12 Agenda item 7 - Addition of a new data item in Appendix 4 of the Radio Regulations for submitting a non-geostationary satellite network     Iran (Islamic Republic of)     2010-06-30
[ 438 ]  
 
WRC-12 Agenda item 1.13     Iran (Islamic Republic of)     2010-06-30
[ 437 ]  
 
Enhancing access to orbit spectrum resources for geostationary satellite networks     Telenor ASA     2010-06-30
[ 436 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R S.725 - Technical characteristics for very small aperture terminals (VSATs)     Brazil (Federative Republic of)     2010-06-30
[ 435 ]  
 
Working document towards the development of draft CPM text on WRC-12 Agenda item 1.13     Brazil (Federative Republic of)     2010-06-30
Results:609 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2011-04-12