Contributions  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 439 ]
|
Proposed new work item on draft Recommendation ITU-T L.Scheduling_Computing&Electric "Requirements for computing power and electric power coordination scheduling strategies for climate change mitigation"
|
China Academy of Information and Communications Technology (CAICT)
,
China Unicom
,
State Grid Corporation of China
|
Q11/5
|
2026-05-26 |
|
[ 438 ]
(Rev.1) |
Draft Supplement ITU-T L.Sup.CE_Shared_BS to ITU-T L.1420 "Carbon Emission Accounting and Allocation Methods for infrastructure Shared Base Station Sites"-proposed for agreement
|
China Academy of Information and Communications Technology (CAICT)
,
China Tower Corporation Limited
|
Q9/5
|
2026-05-26 |
|
[ 437 ]
|
Proposed new work item on draft Recommendation ITU-T L.FR_CEC "Framework and Requirements for computing power and electric power coordination for climate change mitigation"
|
China Academy of Information and Communications Technology (CAICT)
,
China Telecommunications Corporation
,
State Grid Corporation of China
|
Q11/5
|
2026-05-26 |
|
[ 436 ]
(Rev.1) |
Proposal for updated baseline text of Supplement K.Suppl.MethDataEMF
|
GSM Association (United Kingdom)
,
Tanzania Communications Regulatory Authority (TCRA)
,
Uganda Communications Commission (UCC)
|
Q3/5
|
2026-05-26 |
|
[ 435 ]
(Rev.1) |
The 2nd draft on ITU-T L. PCF_SEM "Methodology for the assessment of the carbon footprint of a smart electricity meter"
|
China Information Communication Technologies Group
,
State Grid Corporation of China
|
Q9/5
|
2026-05-26 |
|
[ 434 ]
(Rev.1) |
Draft Technical Report ITU-T LSTR.GHG-DR "Mechanism and framework of power grid demand response based on GHG emission factor" - Finalized editing and submitted for agreement
|
China Telecommunications Corporation
,
State Grid Corporation of China
,
Tsinghua University (China)
|
Q11/5
|
2026-05-26 |
|
[ 433 ]
|
Second modification of L.CP "Standardized Terminology for Computing power resources and Grid Power resources Coordination"
|
China Unicom
,
State Grid Corporation of China
|
Q8/5
|
2026-05-26 |
|
[ 432 ]
|
Draft Technical Report ITU-T L.TR_ECEM-SN "Energy consumption and efficiency metrics for operators of 5G networks in shared network scenario" - Changes to sections 8 and 9
|
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
China Unicom
|
Q6/5
|
2026-05-26 |
|
[ 431 ]
|
Proposed new work item on draft Recommendation ITU-T L.PCF Management "Guidelines for managing the carbon footprint of critical equipment in the supply chain of telecommunication operators"
|
China Telecommunications Corporation
|
Q9/5
|
2026-05-26 |
|
[ 430 ]
(Rev.1) |
Consent for ITU-T L.IEDL "Energy saving strategy for deep learning computing"- modifications to appendix
|
China Academy of Information and Communications Technology (CAICT)
,
China Telecommunications Corporation
,
China Unicom
|
Q6/5
|
2026-05-26 |
|
[ 429 ]
|
Second Draft Recommendation on ITU-T L.VPP_DC "Functional requirements and implementation guidelines of virtual power plants at data centres"
|
China Telecommunications Corporation
|
Q6/5
|
2026-05-26 |
|
[ 428 ]
|
Proposed new work item on draft Recommendation ITU-T L.NEE_DCI "Energy efficiency assessment of wide area networks interconnecting data centres"
|
China Telecommunications Corporation
|
Q6/5
|
2026-05-26 |
|
[ 427 ]
|
Proposed new work item on draft Recommendation ITU-T L.CCEP_CRA "Methodology for assessing carbon reduction benefits of coordinated computing and electrical power operation"
|
China Information Communication Technologies Group
,
State Grid Corporation of China
,
Tsinghua University (China)
|
Q9/5
|
2026-05-26 |
|
[ 426 ]
|
Second Draft Recommendation on ITU-T L.NTLB "Non-Full-Time Immersion Liquid Temperature-controlled Lithium Iron Phosphate Battery Systems for Information and Telecommunication Applications"
|
China Telecommunications Corporation
|
Q6/5
|
2026-05-26 |
|
[ 425 ]
|
Environmental efficiency of telecommunications and ICTs
|
Ministry of Posts and Telecommunications (Democratic Republic of the Congo)
|
Q6/5
|
2026-05-28 |
|
[ 424 ]
|
Draft Recommendation ITU-T L.Env DC "Guidelines on Multi-Dimensional Environmental Metrics and Management for Data Centres" for consent
|
China Telecommunications Corporation
|
Q9/5
|
2026-05-26 |
|
[ 423 ]
(Rev.1) |
Draft Recommendation ITU-T L. MMOC "Multi microgrid scheduling architecture and scenario requirements aiming for reduction of GHG emissions"- Changes to Clause 7
|
China Unicom
,
State Grid Corporation of China
|
Q11/5
|
2026-05-26 |
|
[ 422 ]
|
Proposed new work item on draft Recommendation L.CTS_CP "Computing Task Scheduling Framework considering Computing power and Electric Power Coordination"
|
China Telecommunications Corporation
|
Q6/5
|
2026-05-26 |
|
[ 421 ]
(Rev.1) |
Draft Recommendation ITU-T L.Carbon_DA "Guideline for Data Annotation for Carbon emissions verification Knowledge Graph" for consent.
|
China Information Communication Technologies Group
,
State Grid Corporation of China
|
Q9/5
|
2026-05-26 |
|
[ 420 ]
(Rev.1-2) |
Proposed new work item on draft Recommendation L.EE_Token "Token-Based Evaluation Framework for Energy and Carbon Efficiency of AI Inference"
|
China Telecommunications Corporation
|
Q6/5
|
2026-05-26 |
|
[ 419 ]
(Rev.1) |
Draft Recommendation ITU-T L.Carbon_SLP "Guidelines for the Construction of Smart Low-Carbon Power Supply Facilities Adapted to Island Biodiversity" Changes to chapter 3,5, 6, and 7
|
China Academy of Information and Communications Technology (CAICT)
,
State Grid Corporation of China
|
Q12/5
|
2026-05-26 |
|
[ 418 ]
(Rev.1-2) |
Draft Recommendation ITU-T L.EC&MM-IoTD "Energy consumption metrics and measurement methodology of constrained IoT sensor devices in smart grid" - Changes to section 6, 7, 10 and Appendix
|
China Information Communication Technologies Group
,
State Grid Corporation of China
|
Q6/5
|
2026-05-26 |
|
[ 417 ]
(Rev.1) |
Proposal to start a new work item - L.SESS "Management system framework of shared energy storage system"
|
China Information Communication Technologies Group
,
State Grid Corporation of China
|
Q11/5
|
2026-05-26 |
|
[ 416 ]
(Rev.1) |
Baseline text for revision of K.11, "Principles of protection against overvoltages and overcurrents" to renew references etc.
|
NTT, Inc. (Japan)
|
Q2/5
|
2026-05-26 |
|
[ 415 ]
(Rev.1) |
Proposed draft revision of ITU-T K.21 - Resistibility of telecommunication equipment installed in customerpremises to overvoltages and overcurrents
|
NTT, Inc. (Japan)
|
Q2/5
|
2026-05-26 |
|
[ 414 ]
(Rev.1) |
1st draft revision of K.87
|
NTT, Inc. (Japan)
|
Q1/5
|
2026-05-26 |
|
[ 413 ]
|
Proposal for the updated baseline text on ITU-T L.ups_framework "Management system framework of UPS with Li-ion batteries for infrastructure" in Jeju meeting at 14-16 April 2026
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q11/5
|
2026-05-26 |
|
[ 412 ]
(Rev.1-2) |
Draft Recommendation ITU-T K.calibr "Calibration for equipment for the EMF assessment" - revise and expand the initial baseline text
|
China Information Communication Technologies Group
,
China Academy of Information and Communications Technology (CAICT)
|
Q3/5
|
2026-05-26 |
|
[ 411 ]
|
Proposal to update the ITU-T K Supplement 32 - "Case studies of radio frequency-electromagnetic field (RF-EMF) assessment"
|
Korea (Rep. of)
|
Q3/5
|
2026-05-26 |
|
[ 410 ]
|
Proposal for future study on enhancement of ITU-T K.70 for 5G beamforming systems
|
Korea (Rep. of)
|
Q3/5
|
2026-05-26 |
|
[ 409 ]
|
Proposal of new work item on ITU-T L.ADRS "Reference Model for Automated Demand Response Systems"
|
Korea (Rep. of)
|
Q11/5
|
2026-05-26 |
|
[ 408 ]
(Rev.1) |
Proposal to revise ITU-T L.1300 "Best practices for green data centres"
|
Uganda Communication Commission (UCC), Egypt, Tanzania Communications Regulatory Authority (TCRA), Communications Authority of Kenya
|
Q6/5
|
2026-05-25 |
|
[ 407 ]
(Rev.1) |
ICT E-Waste Collection Pilot Project in Uganda (Information Document)
|
Uganda Communications Commission (UCC)
|
Q7/5
|
2026-05-25 |
|
[ 406 ]
(Rev.1) |
Revision of K.92 "Conducted and radiated electromagnetic environment in home networking"
|
Nokia Corporation (Finland)
|
Q4/5
|
2026-05-25 |
|
[ 405 ]
(Rev.1) |
Revision of K.74 "Electromagnetic compatibility, resistibility and safety requirements for home network devices"
|
Nokia Corporation (Finland)
|
Q4/5
|
2026-05-25 |
|
[ 404 ]
(Rev.1) |
Draft Recommendation ITU-T L.GDSR "Guidelines for Data Sanitization and Resource Recovery of End-of-Life Storage Devices" - Updated throughout the document.
|
China Information Communication Technologies Group
,
State Grid Corporation of China
|
Q7/5
|
2026-05-25 |
|
[ 403 ]
(Rev.1) |
Analysis on the radiated impact of electrostatic gun during ESD test
|
China Information Communication Technologies Group
,
ZTE Corporation (China)
|
Q4/5
|
2026-05-25 |
|
[ 402 ]
(Rev.1) |
Editing on K.21 Table 7
|
China Information Communication Technologies Group
,
ZTE Corporation (China)
|
Q2/5
|
2026-05-25 |
|
[ 401 ]
|
Fourth draft K.Suppl.tov "Protection of ICT equipment with DC power supply against temporary overvoltage (TOV) "
|
China Unicom
,
ZTE Corporation (China)
|
Q2/5
|
2026-05-25 |
|
[ 400 ]
|
1st draft technical report of ITU-T L.TR_GLC_manufacturing "General principles for the evaluation of low-carbon ICT manufacturing enterprises"
|
China Academy of Information and Communications Technology (CAICT), China Mobile Communications Group Co., Ltd, ZTE Corporation
|
Q9/5
|
2026-05-25 |
|
[ 399 ]
(Rev.1) |
Second draft recommendation on K.RIS_EMC "Electromagnetic compatibility requirements and measurement methods for Reconfigurable Intelligent Surface"
|
China Academy of Information and Communications Technology (CAICT)
,
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
ZTE Corporation (China)
|
Q4/5
|
2026-05-25 |
|
[ 398 ]
|
Proposal for additions to draft new Recommendation ITU-T L.TLCsafe_bat - "Safety Technical Specifications for Lithium Batteries in Telecom Sites"
|
Ministry of Communications, Department of Telecommunications (India)
|
Q6/5
|
2026-05-25 |
|
[ 397 ]
|
6th Draft Recommendation ITU-T L.PCF_Smartphone "Guidelines for the assessment of the carbon footprint of a smartphone" for consent
|
China Academy of Information and Communications Technology (CAICT)
|
Q9/5
|
2026-05-25 |
|
[ 396 ]
|
Proposal for revision of ITU-T Rec.K.11(01/2009)) on "Principles of protection against overvoltages and overcurrents"
|
Ministry of Communications, Department of Telecommunications (India)
|
Q2/5
|
2026-05-25 |
|
[ 395 ]
(Rev.1) |
Proposal of new work item - Draft Recommendation L.Digital_EPR "Framework for Digital and Interoperable Implementation of Extended Producer Responsibility (EPR) Systems "
|
Ministry of Communications, Department of Telecommunications (India)
|
Q7/5
|
2026-05-22 |
|
[ 394 ]
|
4th draft Recommendation ITU-T K.AI-EMF on "New EMF evaluation method using AI(artificial intelligence) in the vicinity of 5G NR BS" for consent
|
Korea (Rep. of)
|
QALL/5, Q3/5
|
2026-05-22 |
|
[ 393 ]
|
Update of the draft Recommendation K.actual_max including case studies
|
GSM Association (United Kingdom)
,
Nokia Corporation (Finland)
,
Telefon AB - LM Ericsson (Sweden)
|
Q3/5
|
2026-05-21 |
|
[ 392 ]
(Rev.1) |
Presentation "Green AI: From data to training and adaptation" as input for discussion to include in L.1801 Guidelines for assessing the environmental impact of artificial intelligence systems
|
Telefon AB - LM Ericsson (Sweden)
|
Q9/5
|
2026-05-20 |
|
[ 391 ]
(Rev.1-2) |
ITU-T L. TR_MAP_GHG: "Assessing the Projections of Urban Greenhouse Gas Emission", modification in the framework (clause 6, with new system boundaries and U4SSC alignment), the treatment of ICT systems in emission projection (clause 9), and the case studies (Appendix I)
|
China Information Communication Technologies Group
,
State Grid Corporation of China
|
Q9/5
|
2026-05-18 |
|
[ 390 ]
|
Main outcomes relevant for ITU-T L.1420rev from the BEREC Report on "Infrastructure sharing as a lever for ECN/ECS Environmental Sustainability"
|
Autorite de Regulation des Communications electroniques et des Postes (ARCEP) (France)
|
Q9/5
|
2026-05-18 |
Resultats:539 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):