Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C 

UIT-T SG15

Transport network structures

Période d'études 2009

Resultats:200 documents
Résultats :  Précédent -  1 - 2 - 3 - 4  - Suivant Next
Contributions  [ AI/Question: Q11/15 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 946 ]  
 
Requirements for EVPL, EVPT, EVPLAN, EPT and EVPLAN service support in the OTN     Huawei   Q9/15, Q11/15, Q10/15   2010-05-19
[ 942 ]  
 
Proposal of modification of IPG specification in GFP-T rate adaptation of full duplex Gigabit Ethernet in G.7041     NTT   Q11/15   2010-05-19
[ 930 ]  
 
Proposed modification of UPI code in G.7041 MPLS frame mapping     Fujitsu   Q11/15   2010-05-18
[ 923 ]  
 
Proposal for a new Supplement regarding optical interface specifications for overclocked signals     Deutsche Telekom , NTT   Q6/15, Q11/15   2010-05-18
[ 762 ]  
 
Q11 Living List SP1 Clarification     Alcatel-Lucent   Q11/15   2010-04-29
[ 761 ]  
 
OTUk-AIS used for OTN alarm suppression     Ericsson   Q9/15, Q12/15, Q11/15   2010-04-29
[ 751 ]  
 
Proposed modification of the GMP description text and the GbE into ODU0 mapping description text for inclusion in G.709v3 Amendment 1     PMC-Sierra   Q11/15   2010-04-28
[ 750 ]  
 
Considerations for carrying SyncE over Gigabit/s Ethernet over ODU0     PMC-Sierra   Q9/15, Q13/15, Q11/15   2010-04-28
[ 749 ]  
 
Proposed Frequency and Time-of-Day method for OTN     PMC-Sierra   Q13/15, Q11/15   2010-04-28
[ 748 ]  
 
Proposed Amendment to G.7041 to correct the terminology referring to T-MPLS     PMC-Sierra   Q11/15   2010-04-28
[ 625 ]  
 
OTU4 FEC for metro distance     Deutsche Telekom   Q6/15, Q11/15   2009-09-20
[ 624 ]  
 
Naming of OTN interfaces in G.709     Deutsche Telekom   Q6/15, Q11/15   2009-09-20
[ 623 ]  
 
Network requirement of G.709 interfaces used for Black Link applications.     Deutsche Telekom   Q6/15, Q11/15   2009-09-20
[ 622 ]  
 
Experimental demonstration of black-link applications     Deutsche Telekom   Q6/15, Q11/15   2009-09-20
[ 621 ]  
 
Consideration on ODUflex resizing     Deutsche Telekom   Q11/15   2009-09-20
[ 618 ]  
 
Proposal for mapping of client signals over LO OPU4     ETRI   Q11/15   2009-09-20
[ 617 ]  
 
Comments on OTM-0.mvn in draft revised G.709 v3.4     ETRI   Q11/15   2009-09-20
[ 589 ]  
 
Proposal of Additional PT     ZTE Corporation   Q11/15   2009-09-18
[ 586 ]  
 
Consideration on ODUflex resizing     ZTE Corporation   Q14/15, Q12/15, Q11/15   2009-09-18
[ 585 ]  
 
Consideration on fast OPUk Client Signal Fail (CSF)     ZTE Corporation , CMCC , NSN   Q11/15   2009-09-18
[ 577 ]  
 
OTUk (k=3, 4) multi-channel parallel transport considering FEC     NTT   Q11/15   2009-09-18
[ 572 ]  
 
ODUflex hitless resizing method     Huawei Technologies , China Mobile Communications Corp   Q9/15, Q11/15   2009-09-18
[ 517 ]  
 
Applications requiring 2 stages of ODU multiplexing     Tellabs Oy   Q11/15   2009-09-18
[ 515 ]  
 
Clarification of external ODU in clause 7/G.709     Tellabs Oy   Q11/15   2009-09-18
[ 513 ]  
 
Proposed clarification regarding GFP-F mappings for 10G Ethernet     Tellabs Oy   Q11/15   2009-09-18
[ 505 ]  
 
Initial Analysis of STM-1 Client Jitter and Wander Accumulation over OTN Islands     Huawei Technologies   Q13/15, Q11/15   2009-09-17
[ 504 ]  
 
Initial Analysis of CPRI Client Jitter and Wander Accumulation over OTN islands     Huawei Technologies   Q13/15, Q11/15   2009-09-17
[ 502 ]  
 
1 Gbit/s Ethernet Client Wander Accumulation in the Presence of Input Noise and Wide-band Jitter Accumulation, over OTN Islands     Huawei Technologies   Q13/15, Q11/15   2009-09-17
[ 501 ]  
 
Initial Development of Ethernet and SDH Input Noise Models for OTN Transport Jitter and Wander Accumulation Analyses     Huawei Technologies   Q13/15, Q11/15   2009-09-17
[ 472 ]  
 
Requirement of Embedded Latency Measurement in OTN Networks     China Telecom , CATR , China Unicom , CMCC   Q11/15   2009-09-16
[ 471 ]  
 
CPRI over OTN requirement     China Telecom , Huawei   Q11/15   2009-09-16
[ 465 ]  
 
Comments on Draft revised G.709 (TD95/Plen)     Fujitsu   Q11/15   2009-09-16
[ 464 ]  
 
Proposed further clarification on Draft revised G.709 (TD95/Plen)     Fujitsu   Q11/15   2009-09-16
[ 452 ]  
 
Transfer delay for FC over OTN     Huawei Technologies   Q11/15   2009-09-16
[ 441 ]  
 
GPON over OTN mapping     Huawei Technologies , China Mobile Communications Corporation , PMC-Sierra   Q2/15, Q11/15   2009-09-16
[ 438 ]  
 
Proposal to specify OCh/OTUkV_A with OTUk_CP     Huawei Technologies   Q9/15, Q11/15   2009-09-16
[ 437 ]  
 
Multi-vendor demarcation in the OTN     Huawei Technologies   Q9/15, Q11/15   2009-09-16
[ 436 ]  
 
LO and HO ODU view points and NNIs     Huawei Technologies   Q9/15, Q11/15   2009-09-16
[ 433 ]  
 
Multi-lane STM-256     AT&T   Q11/15   2009-09-16
[ 431 ]  
 
G.709 "Black Link" OTM-1r.m Interface as IrDI     AT&T   Q6/15, Q12/15, Q11/15   2009-09-16
[ 430 ]  
 
G.709 OTN domains     AT&T   Q11/15   2009-09-16
[ 412 ]  
(Rev.1) 
Latency Measurements in the Optical Transport Network Using G.709 Overhead     Verizon , AT&T , BT , Nokia Siemens Networks   Q9/15, Q11/15   2009-09-15
[ 407 ]  
 
Mapping of 100GBASE-R into OPU4     Alcatel-Lucent   Q11/15   2009-09-15
[ 406 ]  
 
BIP-8 handling in adaptation of 40GBASE-R into OPU3 and 100GBASE-R into OPU4     Alcatel-Lucent   Q9/15, Q11/15   2009-09-15
[ 405 ]  
 
Adaptation of STM-256 over multichannel parallel interfaces     Alcatel-Lucent , Cisco , Finisar , Juniper   Q9/15, Q11/15   2009-09-15
[ 395 ]  
 
Further thoughts on the GMP CnD encoding     PMC-Sierra   Q11/15   2009-09-14
[ 361 ]  
 
Considerations and Proposal for Using OTN for GPON Reach Extension     PMC-Sierra   Q2/15, Q11/15   2009-09-08
[ 360 ]  
 
Proposal Amendment to G.8011.1 for the recent OTN Ethernet mappings     PMC-Sierra   Q11/15, Q10/15   2009-09-08
[ 317 ]  
 
Proposal to extend G.8012     Huawei Technologies Co., Ltd.   Q11/15   2008-11-26
[ 272 ]  
 
Naming Considerations regarding T-MPLS and MPLS-TP within ITU-T     Alcatel-Lucent Italia, Alcatel Shanghai Bell, Ital   Q9/15, Q3/15, Q11/15   2008-11-23
Resultats:200 documents
Résultats :  Précédent -  1 - 2 - 3 - 4  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-6-4