Contributions  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 143 ]
|
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 7B and 7C for information) - WRC-27 agenda item 1.11
|
WP 7D
|
AI1.11
|
2024-09-27 |
|
[ 142 ]
+Ann.1-30 |
Report of the meeting of Working Party 7C (Almaty, Kazakhstan, 18-27 September 2024)
|
Acting Chair, WP 7C
|
|
2024-09-27 |
|
[ 141 ]
|
Final list of participants - Working Party 7C (Almaty, Kazakhstan, 18-27 September 2024)
|
Director, BR
|
|
2024-09-27 |
|
[ 140 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7C and 7D for information) - Information on the standard frequency and time signal service with regards to WRC-27 agenda item 1.15 on lunar communications
|
WP 7A
|
AI1.15
|
2024-09-23 |
|
[ 139 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5B, 5C, 7B and 7C for information) - Information regarding the standard frequency and time signal-satellite service for WRC-27 agenda item 1.2 on smaller antenna sizes for FSS uplinks at 14 GHz
|
WP 7A
|
AI1.2
|
2024-09-20 |
|
[ 138 ]
|
Reply liaison statement to Working Party 7C - Information on the standard frequency and time signal service with regards to WRC-27 agenda item 1.19 on possible allocations to the EESS (passive) in the 4 and 8 GHz bands
|
WP 7A
|
AI1.19
|
2024-09-21 |
|
[ 137 ]
|
List of documents issued (Documents 7C/41 - 7C/137)
|
BR, Study Groups Department
|
|
2024-09-17 |
|
[ 136 ]
|
Preliminary draft new ITU-R Report - Analysis of interference received by EESS (passive) sensors in the 18.6-18.8 GHz band caused by surface water reflections
|
Institute of Electrical and Electronics Engineers, Inc. (IEEE)
|
|
2024-09-06 |
|
[ 135 ]
|
Characteristics of EESS (passive) sensors above 86 GHz
|
European Space Agency (ESA)
,
European Organisation for the Exploitation of Meteorological Satellites
|
AI1.8
|
2024-09-06 |
|
[ 134 ]
|
Proposal towards a preliminary draft new Report on WRC-27 agenda item 1.18 (resolves 1)
|
European Space Agency (ESA)
,
European Organisation for the Exploitation of Meteorological Satellites
|
AI1.18
|
2024-09-06 |
|
[ 133 ]
|
Preliminary draft new Report ITU-R RS series analysis of interference received by EESS (passive) sensors in the 18.6-18.8 GHz band caused by surface water reflections
|
European Space Agency (ESA)
|
|
2024-09-06 |
|
[ 132 ]
|
Working document towards preliminary draft revised Recommendation ITU-R RS.577-7
|
European Space Agency (ESA)
|
|
2024-09-06 |
|
[ 131 ]
|
Revision of Recommendation ITU-R RS.515
|
European Space Agency (ESA)
|
|
2024-09-06 |
|
[ 130 ]
|
Working document towards a preliminary draft new Recommendation ITU-R RS.[RXSW_PROTECT_CRITERIA] - Protection criteria of receive-only space weather sensors in the meteorological aids service (space weather)
|
Germany
|
AI1.17
|
2024-09-06 |
|
[ 129 ]
|
Preliminary draft revision of Report ITU-R RS.2489-0 - Technical and operational characteristics of ground-based passive sensors operating in the 51-58 GHz frequency range
|
Germany
|
|
2024-09-06 |
|
[ 128 ]
|
Proposed draft CPM text for WRC-27 agenda item 1.17
|
France
|
AI1.17
|
2024-09-06 |
|
[ 127 ]
|
Proposed reply liaison statement to Working Party 4C regarding WRC-27 agenda item 1.11
|
France
|
AI1.11
|
2024-09-06 |
|
[ 126 ]
|
Preliminary draft new Report on global importance of solar system monitoring
|
Egypt
|
AI1.17
|
2024-09-05 |
|
[ 125 ]
|
Draft work plan proposal for WRC-27 agenda item 1.18 on resolves 1 of Resolution 712 (WRC-23)
|
Korea (Rep. of)
|
AI1.18
|
2024-09-05 |
|
[ 124 ]
|
Status on the updating the "ITU/WMO Handbook on use of radio spectrum for meteorology"
|
CG on updating the "ITU/WMO Handbook on use of radio spectrum for meteorology"
|
|
2024-09-04 |
|
[ 123 ]
|
Proposed reply liaison statement to Working Party 4C regarding WRC-27 agenda item 1.13
|
United States
|
AI1.13
|
2024-09-03 |
|
[ 122 ]
|
Proposed reply liaison statement to Working Party 4C regarding WRC-27 agenda item 1.12
|
United States
|
AI1.12
|
2024-09-03 |
|
[ 121 ]
|
Consideration on matters related to adjacent frequency bands between WRC-27 agenda items 1.7 and 1.19
|
Acting Chairs, WPs 5D and 7C
|
AI1.7, AI1.19
|
2024-09-03 |
|
[ 120 ]
|
Preliminary draft new ITU-R Report - Compatibility study between spaceborne EESS (active) SAR systems and Radiolocation service
|
China
|
|
2024-09-02 |
|
[ 119 ]
|
Proposal for the work of WRC-27 agenda item 1.19
|
China
|
AI1.19
|
2024-09-02 |
|
[ 118 ]
|
Elements for possible compatibility studies related to WRC-27 agenda item 1.18
|
China
|
AI1.18
|
2024-09-02 |
|
[ 117 ]
|
Proposals for working document towards a preliminary draft new Recommendation ITU-R RS.[RXSW_PROTECT_CRITERIA] - Protection criteria of receive-only space weather sensors in the meteorological aids service (space weather)
|
China
|
AI1.17
|
2024-09-02 |
|
[ 116 ]
|
Proposed preliminary draft revision to Recommendation ITU-R RS.2105-2 - Typical technical and operational characteristics of Earth exploration-satellite service (active) systems using allocations between 432 MHz and 238 GHz
|
Japan
|
|
2024-09-02 |
|
[ 115 ]
|
Proposed working document towards preliminary draft new Report ITU-R RS.[SW_STUDIES] - Studies on spectrum needs for receive-only space weather sensors in the frequency ranges 27.5-38.325 MHz, 73-74.6 MHz, and 608-614 MHz
|
Japan
|
AI1.17
|
2024-09-02 |
|
[ 114 ]
|
Preliminary draft revision of Recommendation ITU-R RS.577-7 - Frequency bands and required bandwidths used for spaceborne active sensors operating in the Earth exploration-satellite (active) and space research (active) services
|
Canada
|
|
2024-08-30 |
|
[ 113 ]
|
Preliminary draft revision of Recommendation ITU-R RS.2105-2 - Typical technical and operational characteristics of Earth exploration-satellite service (active) systems using allocations between 432 MHz and 238 GHz
|
Canada
|
|
2024-08-30 |
|
[ 112 ]
|
Preliminary draft revision of Recommendation ITU-R RS.1166-5 - Performance and interference criteria for active spaceborne sensors
|
Canada
|
|
2024-08-30 |
|
[ 111 ]
|
Proposed updates to the working document towards a preliminary draft new Recommendation ITU-R RS.[RXSW_PROTECT_CRITERIA] - Protection criteria of receive-only space weather sensors in the meteorological aids service (space weather)
|
United States
|
AI1.17
|
2024-08-26 |
|
[ 110 ]
|
Preliminary draft revision of Report ITU-R RS.2489-0 - Technical and operational characteristics of ground-based passive sensors operating in the 51-58 GHz frequency range
|
United States
|
|
2024-08-26 |
|
[ 109 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R RS.1166-5 - Performance and interference criteria for active spaceborne sensors
|
United States
|
|
2024-08-26 |
|
[ 108 ]
|
Revisions to working document toward a preliminary draft new Report ITU-R RS.[AGG_EESS_SAR-RNSS]
|
United States
|
|
2024-08-26 |
|
[ 107 ]
|
Draft reply liaison statement to Working Party 4C on RNSS-related comments on Report ITU-R RS.2537-0, Recommendation ITU-R RS.2165-0, and working document towards a preliminary draft new Report ITU-R RS.[AGG_EESS_SAR-RNSS] (Questions ITU-R 217-2/4 and ITU-R 288/4)
|
United States
|
|
2024-08-26 |
|
[ 106 ]
|
Studies on possible allocations to the Earth exploration-satellite service (passive) in the bands 4 200-4 400 MHz and 8 400-8 500 MHz
|
United States
|
AI1.19
|
2024-08-26 |
|
[ 105 ]
|
Proposed initial framework of the working document on studies under WRC-27 agenda item 1.17 - Initial framework of the working document on studies under WRC-27 agenda item 1.17
|
United States
|
AI1.17
|
2024-08-26 |
|
[ 104 ]
|
Preliminary draft new Report ITU-R RS series - Analysis of interference received by EESS (passive) sensors in the 18.6-18.8 GHz band caused by surface water reflections
|
United States
|
|
2024-08-26 |
|
[ 103 ]
|
Working document towards a preliminary draft revised Recommendation ITU-R RS.577-7
|
United States
|
|
2024-08-26 |
|
[ 102 ]
|
Working document towards a preliminary draft new Recommendation ITU-R RS.[2105-2 + RADAR SOUNDER]
|
United States
|
|
2024-08-26 |
|
[ 101 ]
|
Working document towards preliminary draft new Report ITU-R [EESS(PASSIVE) COMPATIBILITY ABOVE 76 GHZ]
|
United States
|
AI1.18
|
2024-08-26 |
|
[ 100 ]
|
Proposed reply liaison statement to Working Party 4C regarding WRC-27 agenda item 1.14
|
United States
|
AI1.14
|
2024-08-26 |
|
[ 99 ]
|
Proposed reply liaison statement to Working Party 4C regarding WRC-27 agenda item 1.11
|
United States
|
AI1.11
|
2024-08-26 |
|
[ 98 ]
|
Proposed liaison statement to Working Party 4A regarding WRC-27 agenda item 1.6
|
United States
|
AI1.6
|
2024-08-26 |
|
[ 97 ]
|
Proposed reply liaison statement to Working Party 4A regarding WRC-27 agenda item 1.4
|
United States
|
AI1.4
|
2024-08-26 |
|
[ 96 ]
|
Committee on the Peaceful Uses of Outer Space: 2024 - Sixty-seventh session (19-28 June 2024) - Space sustainability issues
|
Brazil
|
|
2024-08-26 |
|
[ 95 ]
|
Liaison statement to ITU-R Working Parties 5B and 7C - WRC-27 agenda item 1.19 - Proposed technical parameters and operating scenarios to consider in studies between Earth exploration-satellite service (passive), and radio altimeters and Wireless Avionics Intra Communications operating in the 4 200-4 400 MHz frequency band
|
International Civil Aviation Organization
|
AI1.19
|
2024-08-22 |
|
[ 94 ]
|
Information on the preparation of texts for the draft CPM Report to WRC-27
|
Chair, CPM-27
|
|
2024-07-09 |
Resultats:243 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):