Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : R23-WP3M : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R R23-WP3M  C 

UIT-R R23-WP3M

Prévision de la propagation des ondes radioélectriques pour les trajets point-à-point et les trajets entre la Terre et l'espace

Resultats:234 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 134 ]  
 
Correspondence Group 3J-23 activity Report - General slant path terrain diffraction model     Chair, CG 3J-23     2025-01-28
[ 133 ]  
 
Activity Report of Correspondence Group 3K-3M-18 - Specific issues common to Recommendations ITU-R P.452, ITU-R P.1812, or ITU-R P.2001     CG 3K-3M-18     2025-01-27
[ 132 ]  
 
Report on the activities of Correspondence Group 3J-3K-3M-14 - Issues relating to the HAPS propagation model     Chair, CG 3J-3K-3M-14     2025-01-27
[ 131 ]  
 
Evaluate the impact of antenna radiation pattern and slant path clutter loss model update proposals based on latest working document 3K/77     China     2025-01-24
[ 130 ]  
 
Performance comparison analysis of two slant path clutter loss models in working document 3K/77     China     2025-01-24
[ 129 ]  
 
Ray-tracing-based modified Recommendation ITU-R P.2108 clutter loss model for urban scenarios below 10 GHz     China     2025-01-24
[ 128 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R P.2040-3 - Dielectric properties of building between 100 and 400 GHz     China     2025-01-23
[ 127 ]  
 
Information document about hybrid path loss of clutter loss and building entry loss     China     2025-01-23
[ 126 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.6     WP 6A   AI1.6   2024-11-19
[ 125 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D) - WRC-27 agenda item 1.10     WP 6A   AI1.10   2024-11-19
[ 124 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 3L, 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D) - WRC-27 agenda item 1.17     WP 6A   AI1.17   2024-11-19
[ 123 ]  
 
Reply liaison statement to Working Party 3M - WRC-27 agenda item 1.4     WP 4A   AI1.4   2024-11-08
[ 122 ]  
 
Liaison statement to working party 5B (copy to Working Parties 3M and 7B for information) - Relevant technical information to support studies under WRC-27 agenda item 1.2     WP 4A   AI1.2   2024-11-08
[ 121 ]  
 
Reply liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 5A, 5B, 5C, 5D, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1     WP 4A   AI1.1   2024-11-07
[ 120 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7C and 7D) - WRC-27 agenda item 1.11     WP 4C   AI1.11   2024-10-22
[ 119 ]  
 
Reply liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 6A, 7B, 7C and 7D (copy to Working Party 5D) - WRC-27 agenda item 1.13     WP 4C   AI1.13   2024-10-22
[ 118 ]  
 
Liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7D for information) - Additional information on passive sensors in the EESS for WRC-27 agenda item 1.8     WP 7C   AI1.8   2024-10-01
[ 117 ]  
 
Reply liaison statement to Working Party 4C (copy to the Study Group 7 Chair, the CPM Chair and to Working Parties 3L, 3M, 4B, 5A, 5C, 5D, 7B for information) - WRC-27 agenda item 1.14     WP 7C   AI1.14   2024-09-30
[ 116 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7     WP 7D   AI1.7   2024-09-30
[ 115 ]  
 
Reply liaison statement to Working Party 5D on WRC-27 agenda item 1.7 (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D)     WP 7B   AI1.7   2024-09-30
[ 114 ]  
 
Reply liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7C for information) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8     WP 7D   AI1.8   2024-09-27
[ 113 ]  
 
Reply liaison statement to Working Parties 3J, 3K and 3M - Relevant technical information to support studies in preparation of WRC-27 agenda items     WP 7D   AI1.8, AI1.7, AI1.3, AI1.18, AI1.17, AI1.16, AI1.15, AI1.11, AI1.10, AI1.1   2024-09-27
[ 112 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C for information) - Technical information to support the studies for WRC-27 agenda items 1.12 and 1.13     WP 7D   AI1.13, AI1.12   2024-09-27
[ 111 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5B, 5C, 7B and 7C for information) - Information regarding the standard frequency and time signal-satellite service for WRC-27 agenda item 1.2 on smaller antenna sizes for FSS uplinks at 14 GHz     WP 7A   AI1.2   2024-09-20
[ 110 ]  
 
Information on the preparation of texts for the draft CPM Report to WRC-27     Chair, CPM-27     2024-07-09
[ 109 ]  
 
Liaison statement to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D - WRC-27 agenda item 1.7     WP 5D   AI1.7   2024-07-08
[ 108 ]  
 
Reply liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3J, 3K and 3M) - Considerations on draft Recommendation ITU-T K.DMEI of ITU-T Study Group 5     WP 5D     2024-07-05
[ 107 ]  
 
Liaison statement on draft Recommendation ITU-T K.DMEI - Determination and mitigation of electromagnetic compatibility issues for 5G TDD network under tropospheric duct effect     ITU-T SG5     2024-06-18
[ 106 ]  
+Ann.1-32 
Report on the meeting of Working Party 3M (Denver, Colorado, USA, 29 May - 7 June 2024)     Chair, WP 3M     2024-06-08
[ 105 ]  
 
Final list of participants WP 3M (Denver, Colorado, USA, 29 May - 7 June 2024)     Director, BR     2024-06-08
[ 104 ]  
 
List of documents issued (Documents 3M/1 - 3M/104)     BR, Study Groups Department     2024-05-31
[ 103 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5D, 6A, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.13     WP 5C   AI1.13   2024-05-29
[ 102 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.7     WP 5C   AI1.7   2024-05-29
[ 101 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 3M, 4A, 5A, 5B, 5D and 7B for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.19     WP 5C   AI1.19   2024-05-29
[ 100 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 3J, 3M, 4A, 4C, 5A and 5B for information) - Relevant technical information to support studies under WRC-27 agenda item 1.18 and update on supporting materials     WP 5C   AI1.18   2024-05-29
[ 99 ]  
 
Liaison statement to Working parties 4A, 4C, 5A, 5B, 3J and 3M (copy to Working Parties 1A, 4B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10     WP 5C   AI1.10   2024-05-29
[ 98 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 5A, 5B, 6B, AND 7C for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.4     WP 5C     2024-05-29
[ 97 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.3     WP 5C   AI1.3   2024-05-29
[ 96 ]  
 
Reply liaison statement to Working Party 5D (copy for information to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5C, 7B, 7C, 7D and ICAO) - Relevant technical information for sharing studies under WRC-27 agenda item 1.7     WP 5B   AI1.7   2024-05-28
[ 95 ]  
 
Path loss measurements at 3.5 GHz and 28 GHz for site-specific models for industrial environments     Nokia Corporation (Finland) , Colegio Oficial de Ingenieros de Telecomunicación (COIT)     2024-05-17
[ 94 ]  
 
Path loss measurement dataset for industrial environment at 3.5 GHz     Nokia Corporation (Finland) , Colegio Oficial de Ingenieros de Telecomunicación (COIT)     2024-05-17
[ 93 ]  
 
Working documents towards a preliminary draft revision of Report ITU-R P.2402 - Clutter loss along slant-paths - Discussion document on the general definitions for modelling and applications     European Space Agency     2024-05-17
[ 92 ]  
 
Discussion document on 3.5 GHz and 4.8 GHz clutter measurements in Rio de Janeiro, Brazil     Brazil     2024-05-17
[ 91 ]  
 
Proposal of reply liaison statement to WP 5D and information on radio wave propagation models and provisions of their application for use in conducting sharing and compatibility studies under WRC-27 agenda item 1.7     France   AI1.7   2024-05-17
[ 90 ]  
 
Discussion document on the use of clutter loss model for sharing and compatibility studies with earth-space and aeronautical paths and directional antennas     France     2024-05-21
[ 89 ]  
 
Comments on the new model under development of a new clutter loss model for slant paths     France     2024-05-17
[ 88 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5C, 7A, 7B and 7C) - Relevant technical information to support studies under WRC-27 agenda item 1.2     WP 5B   AI1.2   2024-05-21
[ 87 ]  
 
Contribution to DBSG3 Table IV-1: Rain rate statistics in Cochabamba     Spain , France     2024-05-17
[ 86 ]  
 
Proposed revision to Report ITU-R P.2346-5 - Outdoor-to-indoor propagation loss model on a NLoS path based on building entry loss (BEL) and clutter loss (CL) model     Korea (Rep. of)     2024-05-17
[ 85 ]  
 
Proposed revision to Report ITU-R P.2346-5 - Characteristics of window penetration loss (WinPL) and its impact on BEL     Korea (Rep. of)     2024-05-17
Resultats:234 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2025-07-23