Contributions  |
|
Numéro
|
Titre
|
Source
|
Date
|
|
[ 615 ]
|
Proposals on issue "C" in framework of agenda item 1.2 WRC-15
|
Russian Federation
|
2014-07-10 |
|
[ 614 ]
|
Proposal on modification of working document towards preliminary draft CPM text for WRC-15 agenda item 1.2 for Sections 1/1.2/5.2 and 1/1.2/6.2
|
Russian Federation
|
2014-07-10 |
|
[ 613 ]
|
Definition of out-of-band emission limit for mobile service user equipment under the agenda item 1.2
|
Russian Federation
|
2014-07-10 |
|
[ 612 ]
|
Frequency plan for the use of International Mobile Telecommunications (IMT) for broadband public protection and disaster relief (BB-PPDR) and other special applications
|
Russian Federation
|
2014-07-10 |
|
[ 611 ]
|
Proposal on certain bands allocated to fixed-satellite service under WRC-15 agenda item 1.1
|
Arab Satellite Communications Organization
|
2014-07-10 |
|
[ 610 ]
|
Proposed changes to the working document towards preliminary draft CPM text for WRC-15 agenda item 1.1
|
Australia
|
2014-07-10 |
|
[ 609 ]
|
Update of the compatibility study between RLAN 5 GHz and EESS (active) in the band 5 350-5 470 MHz
|
France
|
2014-07-09 |
|
[ 608 ]
|
Annex 3 to Joint Task Group 4-5-6-7 Chairman's Report - Working document towards preliminary draft CPM text for WRC-15 agenda item 1.1 - Chapter 1 - Mobile and Amateur issues
|
France
|
2014-07-09 |
|
[ 607 ]
|
Further considerations on RLAN 5 GHz antenna
|
France
|
2014-07-09 |
|
[ 606 ]
|
Analysis of a change of RLAN channelisation as a mitigation technique to protect ESS (active) systems from interference by RLAN in the band 5 350-5 470 MHz
|
France
|
2014-07-09 |
|
[ 605 ]
|
Analysis of the e.i.r.p. mask proposed in Joint Task Group as a mitigation technique to protect EESS (active) systems from interference by RLAN in the band 5 350-5 470 MHz
|
France
|
2014-07-09 |
|
[ 604 ]
|
Modification of PDNR ITU-R M.[RLAN5GHZ.SHAR]
|
France
|
2014-07-09 |
|
[ 603 ]
|
Proposed modifications to working document towards a preliminary draft new Recommendation ITU-R M.[BSMS700]
|
France
|
2014-07-09 |
|
[ 602 ]
|
Proposed modifications to working document towards preliminary draft CPM text for WRC-15 agenda item 1.2
|
France
|
2014-07-09 |
|
[ 601 ]
|
DFS minimum requirement to ensure an adequate protection to frequency hopping radars in the 5 GHz band
|
France
|
2014-07-09 |
|
[ 600 ]
|
Finalisation of draft new Report ITU-R RS.[EESS RLAN 5 GHZ]
|
France
|
2014-07-09 |
|
[ 599 ]
|
Liaison statement to ITU-R Joint Task Group 4-5-6-7 on World Radiocommunication Conference 2015 (WRC-15), agenda item 1.1 - Additional comments in relation to frequency bands identified by ITU-R for future assessment of the suitability for IMT
|
International Maritime Organization
|
2014-07-09 |
|
[ 598 ]
|
Correspondence Group to develop the Recommendation/Report on the assessment of the protection of DTTB reception considering the cumulative interference from IMT base stations for application in the GE06 area - Report
|
CG on DTTB
|
2014-07-07 |
|
[ 597 ]
|
Use of agreed parameters in studies within Joint Task Group 4-5-6-7
|
Chairman, JTG 4-5-6-7
|
2014-07-07 |
|
[ 596 ]
|
Editorial modifications to working document towards preliminary draft CPM text for WRC-15 agenda item 1.1
|
United Kingdom of Great Britain and Northern Irela
|
2014-07-04 |
|
[ 595 ]
|
Liaison statement - Channelling arrangements for 694-790 MHz for agenda item 1.2
|
WP 5D
|
2014-06-30 |
|
[ 594 ]
|
Proposals on views about certain bands allocated to fixed-satellite service under WARC-15 agenda item 1.1
|
Nicaragua
|
2014-06-27 |
|
[ 593 ]
|
Proposed changes to the draft CPM text on WRC-15 agenda item 1.1 for the band 5 350-5 470 MHz
|
Canada
|
2014-06-17 |
|
[ 592 ]
|
Proposed editorial revisions to CPM text on WRC-15 agenda item 1.1
|
Canada
|
2014-06-17 |
|
[ 591 ]
|
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 5B and 7C for information) - Possible mitigation techniques to address interference to EESS (active) and radiodetermination from the potential use of the frequency band 5 350-5 470 MHz by RLANs
|
WP 5A
|
2014-06-03 |
|
[ 590 ]
|
Reply liaison statement to ITU-R Joint Task Group 4-5-6-7 (copy for information to Working Party 5A) - Possible mitigation techniques to address interference to EESS (active) and radiodetermination from the potential use of the frequency bands 5 350-5 470 and/or 5 725-5 850 MHz bay WAS/RLANS
|
WP 5B
|
2014-05-30 |
|
[ 589 ]
|
Guidance for the preparation of concise draft CPM texts for WRC-15 agenda item 1.1 and 1.2
|
Chairman, JTG 4-5-6-7
|
2014-05-22 |
|
[ 588 ]
|
Arrangements for the final meeting of Joint Task Group 4-5-6-7
|
Chairman, JTG 4-5-6-7
|
2014-05-21 |
|
[ 587 ]
|
Proposed modifications to working document towards preliminary draft CPM text for WRC-15 agenda item 1.2
|
United Kingdom of Great Britain and Northern Ireland
|
2014-05-16 |
|
[ 586 ]
|
Liaison statement to Joint Task Group 4-5-6-7 (copy Working Party 5A) - Reply to the Joint Task Group 4-5-6-7 liaison statement on potential mitigation techniques for RLAN interference to EESS (active) in the band 5 350-5 470 MHz
|
WP 7C
|
2014-05-15 |
|
[ 585 ]
|
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, Joint Task Group 4-5-6-7 and the Special Committee as responsible Groups for WRC-15 agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2., 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D)
|
World Meteorological Organization
|
2014-04-28 |
|
[ 584 ]
+Ann.1-12 |
Report on the meeting of Joint Task Group 4-5-6-7 (Geneva, 20-28 February 2014)
|
Chairman, JTG 4-5-6-7
|
2014-03-07 |
|
[ 583 ]
|
Final list of participants - Joint Task Group 4-5-6-7 (Geneva, 20-28 February 2014)
|
Director, BR
|
2014-02-28 |
|
[ 582 ]
|
List of documents issued (Documents 4-5-6-7/393 - 4-5-6-7/582)
|
BR Study Groups Department
|
2014-02-19 |
|
[ 581 ]
|
Liaison statement to Joint Task Group 4-5-6-7 - Technical and operational parameters of BSS (sound) systems in the 1 452-1 492 MHz frequency band to be taken into account for compatibility studies under WRC-15 agenda item 1.1
|
WP 4A
|
2014-02-17 |
|
[ 580 ]
|
Progress Report to Joint Task Group 4-5-6-7
|
Chairman, RG to develop solutions for SAB/SAP
|
2014-02-17 |
|
[ 579 ]
|
Further calculations related to IMT UE OOB emission limits required to protect DTTB reception
|
European Broadcasting Union
|
2014-02-13 |
|
[ 578 ]
|
Critical assessment of and comments on a study provided in Document 4-5-6-7/416
|
Norddeutscher Rundfunk (NDR)
,
Zweites Deutsches Fernsehen
|
2014-02-13 |
|
[ 577 ]
|
Reduced ACLR of LTE UE - The side effect of high efficiency UE power amplifiers
|
Norddeutscher Rundfunk (NDR)
,
Zweites Deutsches Fernsehen
|
2014-02-13 |
|
[ 576 ]
|
Revision of the working document (agenda item 1.2) - Integration of the postprocessing into IP calculations
|
Norddeutscher Rundfunk (NDR)
,
Zweites Deutsches Fernsehen
|
2014-02-13 |
|
[ 575 ]
|
Proposed revision to Annex 5 to Joint Task Group 4-5-6-7 Chairman's Report
|
European Broadcasting Union
|
2014-02-13 |
|
[ 574 ]
|
Preliminary draft new Report ITU-R M./BT.[IMTDTTBLOWERUHF] "Sharing and compatibility studies between digital terrestrial television broadcasting and IMT in the frequency band 470-694/698 MHz"
|
European Broadcasting Union
|
2014-02-13 |
|
[ 573 ]
|
Review of spectrum requirements for IMT
|
ASTRIUM SAS
,
European Space Agency
,
Eutelsat S.A.
,
HISPASAT, S.A.
,
Inmarsat Plc.
,
Intelsat
,
LS telcom AG
,
SES WORLD SKIES
,
THALES Communications
|
2014-02-13 |
|
[ 572 ]
|
Study on the impact of the aggregate interference originating from IMT stations into FSS space station receivers in the band 5 925-6 425 MHz
|
Inmarsat Plc.
|
2014-02-17 |
|
[ 571 ]
|
Proposed revisions to draft CPM text on WRC-15 agenda item 1.1 - Proposed revisions to the draft CPM text, as contained in Attachment 5 of Annex 7 to Document 4-5-6-7/393 are shown below
|
Inmarsat Plc.
|
2014-02-17 |
|
[ 570 ]
|
Proposed revisions to framework for a working document towards a preliminary draft new Report ITU-R [C-BAND DOWNLINK]
|
Inmarsat Plc.
|
2014-02-13 |
|
[ 569 ]
|
Proposals on working document towards preliminary draft CPM text for WRC-15 agenda item 1.2
|
Egypt (Arab Republic of)
,
United Arab Emirates
|
2014-02-13 |
|
[ 568 ]
|
IARU position on WRC-15 agenda item 1.1
|
International Amateur Radio Union
|
2014-02-12 |
|
[ 567 ]
|
Some aspects and implications of adding further time elements to the Mont Carlo simulation methodology
|
Motorola Solutions Inc.
|
2014-02-13 |
|
[ 566 ]
|
Observations on the results on 5 GHz RLAN characteristics debate with some results of simulations
|
United Kingdom of Great Britain and Northern Ireland
|
2014-02-13 |
Resultats:715 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):