Contribuciones  |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 663 ]
|
G.Sup.VHSP : DCPC in high CD regime
|
Huawei Technologies Dusseldorf GmbH (Germany)
|
Q2/15
|
2025-09-30 |
|
[ 662 ]
|
Proposed text changes on GSTR.ION-2030
To be verified by TSB
|
Huawei Technologies Co., Ltd. (China)
|
Q12/15
|
2025-09-30 |
|
[ 661 ]
|
Proposals on data collection and processing for GSTR.ENO
|
Algerie Telecom SPA (Algeria)
,
China Information Communication Technologies Group
|
Q14/15, Q12/15
|
2025-09-30 |
|
[ 660 ]
|
G.supp.VHSP proposed text for Clause 9.3 Feed-forward type sensing
|
China Information Communication Technologies Group
|
Q2/15
|
2025-09-30 |
|
[ 659 ]
|
Considerations on the Need for Cross-Domain Protection in fgMTNs from an Application Perspective
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q11/15
|
2025-09-30 |
|
[ 658 ]
|
Proposal of single-sideband(SSB)modulation and direct-detection(DD) scheme for 50G-TWDM-PON
To be verified by TSB
|
NTT, Inc. (Japan)
|
Q2/15
|
2025-09-30 |
|
[ 657 ]
|
Proposals on NMA for GSTR.ENO
|
Algerie Telecom SPA (Algeria)
,
China Information Communication Technologies Group
|
Q14/15, Q12/15
|
2025-09-30 |
|
[ 656 ]
|
New work item for G.7702 revision - mapping between the CPI and specific implementation interfaces
|
China Academy of Information and Communications Technology
,
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
ZTE Corporation (China)
|
Q12/15
|
2025-09-30 |
|
[ 655 ]
|
G.9804.3: Inclusion of E1 and E2 into G.9804.3
|
AT&T, Inc. (United States)
|
Q14/15
|
2025-09-30 |
|
[ 654 ]
|
The workflow of NMA in the architecture for intelligent transport networks
|
China Academy of Information and Communications Technology
,
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
China Unicom
,
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2025-09-30 |
|
[ 653 ]
|
Visual management of passive resources
|
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
ZTE Corporation (China)
|
Q14/15
|
2025-09-30 |
|
[ 652 ]
|
G.9804.2: The PLOAM-IK and OMCI-IK switching upon cipher update
|
China Information Communication Technologies Group
|
Q2/15
|
2025-09-30 |
|
[ 651 ]
(Rev.1) |
LTR-PTP time error reports from multiple end connections [G. Suppl 68]
|
China Information Communication Technologies Group
|
Q13/15
|
2025-09-30 |
|
[ 650 ]
|
Updates for Annex F Performance Monitoring of G.8275
|
China Information Communication Technologies Group
|
Q13/15
|
2025-09-30 |
|
[ 649 ]
|
Proposed new work item on Metro Transport Network 800G/1.6T interfaces
|
China Academy of Information and Communications Technology
,
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q11/15
|
2025-09-30 |
|
[ 648 ]
|
Proposal of initiating the amendment 1 of Recommendation G.9949
|
China Academy of Information and Communications Technology
,
China Mobile Communications Co. Ltd.
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q3/15
|
2025-09-30 |
|
[ 647 ]
|
Further applications proposal of multi-core fibres
|
China Unicom
,
Peng Cheng Laboratory (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q5/15
|
2025-09-30 |
|
[ 646 ]
|
Proposed modifications of revised G.959.1
|
China Unicom
|
Q6/15
|
2025-09-30 |
|
[ 645 ]
|
Symmetric 50G PON upstream class C plus optical interface parameter convergence
|
China Mobile Communications Co. Ltd.
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2025-09-30 |
|
[ 644 ]
|
Proposed Updates to the VHSP Draft
|
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2025-09-30 |
|
[ 643 ]
|
Proposal to start technical report on requirements of multi-agent collaboration for optical network management and control
|
China Academy of Information and Communications Technology
,
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q14/15, Q12/15
|
2025-09-30 |
|
[ 642 ]
|
Overhead considerations for B1T OTN path layer
|
China Telecommunications Corporation
,
ZTE Corporation (China)
|
Q11/15
|
2025-09-30 |
|
[ 641 ]
|
B1T OTN mapping and multiplexing scheme
|
China Telecommunications Corporation
,
ZTE Corporation (China)
|
Q11/15
|
2025-09-30 |
|
[ 640 ]
|
Error marking mechanisms for B1T OTN
|
China Telecommunications Corporation
,
ZTE Corporation (China)
|
Q11/15
|
2025-09-30 |
|
[ 639 ]
|
Proposed text enhancement on draft technical report on ION-2030
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q12/15
|
2025-09-30 |
|
[ 638 ]
|
Consideration of large-scale optical switch in G.671
|
China Unicom
,
ZTE Corporation (China)
|
Q6/15
|
2025-09-30 |
|
[ 637 ]
|
Inter-core Crosstalk Measurement Considerations
|
Corning Incorporated (United States)
|
Q5/15
|
2025-09-30 |
|
[ 636 ]
|
Considerations on fgMTN DNI protection
To be verified by TSB
|
China Mobile Communications Co. Ltd.
,
State Grid Corporation of China
,
ZTE Corporation (China)
|
Q11/15
|
2025-09-30 |
|
[ 635 ]
|
fgMTNP over 10GBASE-R PHY
|
China Mobile Communications Co. Ltd.
,
State Grid Corporation of China
,
ZTE Corporation (China)
|
Q11/15
|
2025-09-30 |
|
[ 634 ]
|
Proposal for clause 9.2.5 in G Suppl.68
|
ZTE Corporation (China)
|
Q13/15
|
2025-09-30 |
|
[ 633 ]
|
Coordinated Roaming Working Text Updates of G.WMCI
|
Huawei Technologies Co., Ltd. (China)
|
Q3/15
|
2025-09-30 |
|
[ 632 ]
|
Frames of Coordinated Roaming
|
Huawei Technologies Co., Ltd. (China)
|
Q3/15
|
2025-09-30 |
|
[ 631 ]
|
Proposed A.1 form and draft of new Recommendation G.9730
|
China Academy of Information and Communications Technology
,
China Mobile Communications Co. Ltd.
,
China Unicom
,
HMN Technologies Co. Ltd. (China)
,
Jiangsu Zhongtian Technology Co.,Ltd. (China)
|
Q8/15
|
2025-09-30 |
|
[ 630 ]
(Rev.1) |
Further considerations on digital subcarrier
|
China Information Communication Technologies Group
,
China Unicom
|
Q6/15
|
2025-09-30 |
|
[ 629 ]
|
Encrypting the OMCI flow in the PON systems
|
Calix Networks, Inc. (United States)
,
Verizon Communication Corporation (United States)
|
Q2/15
|
2025-09-30 |
|
[ 628 ]
|
SOP rotation tracking-based sensing-communication integration scheme
|
China Unicom
|
Q6/15
|
2025-09-30 |
|
[ 627 ]
|
Verizon's proposal on the path forward for the 50G-TWDM specification
|
Verizon Communication Corporation (United States)
|
Q2/15
|
2025-09-30 |
|
[ 626 ]
|
Considerations of maximum fiber length formula in G.fso
|
China Unicom
|
Q6/15
|
2025-09-30 |
|
[ 625 ]
|
Consideration of B1T coherent point-to-multipoint (P2MP) applications based on digital subcarrier multiplexing (DSCM)
|
China Information Communication Technologies Group
,
China Unicom
|
Q6/15
|
2025-09-30 |
|
[ 624 ]
|
The threat model description for G.Sup.PONsec
|
Verizon Communication Corporation (United States)
|
Q2/15
|
2025-09-30 |
|
[ 623 ]
|
Proposed content about passive component sharing for L.nis
|
China Academy of Information and Communications Technology
,
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
|
Q7/15
|
2025-09-30 |
|
[ 622 ]
|
Proposed content for revised L.361
|
China Academy of Information and Communications Technology
,
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
|
Q7/15
|
2025-09-30 |
|
[ 621 ]
|
Proposed content for L.ocwp.2
|
China Academy of Information and Communications Technology
,
China Information Communication Technologies Group
|
Q5/15
|
2025-09-30 |
|
[ 620 ]
|
Discussions on test methods for HCF
|
China Academy of Information and Communications Technology
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q5/15
|
2025-09-30 |
|
[ 619 ]
|
On PON timing
|
Futurewei Technologies Inc. (United States)
|
Q2/15
|
2025-09-30 |
|
[ 618 ]
|
Proposal to revise G.697 to include new OSNR calculation method
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q6/15
|
2025-09-30 |
|
[ 617 ]
|
Comparison of single-carrier and sub-carrier modulation options for B1T-OTN long reach interfaces
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q6/15
|
2025-09-30 |
|
[ 616 ]
|
Consideration of Reference Post-Equalizers for ETCC Measurement
|
Huawei Technologies Co., Ltd. (China)
|
Q6/15
|
2025-09-29 |
|
[ 615 ]
|
Proposal for a new work item for a draft new ITU-T recommendation L.fifomcf on "Optical Fan-In Fan-Out device (FIFO) for multi-core optical fibre (MCF) and cable"
|
Indian Institute of Technology Madras
,
Ministry of Communications, Department of Telecommunications (India)
,
Sterlite Technologies Limited (India)
|
Q7/15, Q5/15
|
2025-09-29 |
|
[ 614 ]
|
Considerations on the segmented protection for fgMTN DNI protection
|
China Academy of Information and Communications Technology
,
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q11/15
|
2025-09-29 |
Resultados :761 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16
- Siguiente

|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):