Contribuciones
Número
Título
Origen
AI/Cuestión
Filtro...
AI1.10
AI1.11
AI1.12
AI1.13
AI1.14
AI1.4
AI1.6
Q218/4
Borrar filtro
Fecha
[ 87 ]
Liaison statement to Coordination Committee for Terminology (Copy to RAG, TSAG, TDAG, ITU-T Study Groups 17 and 13 and ITU-R Working Party 4B) - Terms and definitions related to IMT-2020 (5G) technology
WP 5D
2024-10-17
[ 86 ]
List of documents issued (Documents 4B/31 - 4B/86)
BR, Study Groups Department
2024-10-15
[ 85 ]
Working document towards a preliminary draft new report on development and technology trends for the satellite component of IMT towards 2030 and beyond
United States
2024-10-04
[ 84 ]
[Elements towards a working document towards a preliminary draft new Report ITU-R M.[MSS_OBP]] - [EXAMPLE] network architectures and their impacts on performance objectives for mobile-satellite service systems with on-board processing
United States
2024-10-04
[ 83 ]
Working document towards a preliminary draft new Report ITU-R M.[SAT IOT] - Technical and operational aspects of satellite Internet of Things (IoT) applications
United States
2024-10-04
[ 82 ]
Working Party 4B's activity related to the satellite component of IMT
United States
2024-10-04
[ 81 ]
Proposed additions to working document towards a preliminary draft new report on development and technology trends for the satellite component of IMT towards 2030 and beyond
Thales SA
2024-10-04
[ 80 ]
Proposed revision to Recommendations ITU-R BO.789-2 and ITU-R BO.1130-4
European Broadcasting Union
,
Broadcast Networks Europe
2024-10-04
[ 79 ]
Proposed timeline and updates to the workplan for the future development of the IMT-2030 satellite component
Telefon AB - LM Ericsson
2024-10-04
[ 78 ]
Final evaluation report on the proposed candidate IMT-2020 satellite radio interface technology in document IMT-2020-SAT/4
ETSI
2024-10-04
[ 77 ]
Final evaluation report by 5GIF towards the 3GPP candidate technology for satellite component of IMT-2020
Director, BR
2024-10-04
[ 76 ]
Proposal to include IMT terrestrial and satellite radio interfaces in WRC-27 agenda item 1.13
Qualcomm, Inc.
AI1.13
2024-10-04
[ 75 ]
Evaluation report on the proposed candidate IMT-2020 satellite radio interface technology in document IMT-2020-SAT/4
Director, BR
2024-10-03
[ 74 ]
Proposed reply liaison statement to Working Party 4C on WRC-27 agenda item 1.12 - Information for studies on WRC-27 agenda item 1.12
Canada
,
Norway
AI1.12
2024-10-01
[ 73 ]
Considerations on the possible future development of low data rate MSS systems related to WRC-27 agenda item 1.12
Canada
,
Norway
AI1.12
2024-10-01
[ 72 ]
Proposed preliminary draft new Recommendation ITU-R M.[IMT-2020-SAT.SPECS]
France
2024-10-01
[ 71 ]
Proposed modifications to the preliminary draft new Report ITU-R M.[SAT-IMT-2020-EVAL]
France
2024-10-01
[ 70 ]
Proposed liaison statement to independent evaluation groups (IEGs)
France
2024-10-01
[ 69 ]
Proposed actions and exchange of information with external organisations for the finalization of the IMT-2020 satellite radio interface process
France
2024-10-01
[ 68 ]
Reply liaison statement to Working Party 4C (copy to the SG 7 Chair, the CPM Chair and to Working Parties 3L, 3M, 4B, 5A, 5C, 5D, 7B for information) - WRC-27 agenda item 1.14
WP 7C
AI1.14
2024-09-30
[ 67 ]
Reply liaison statement to Working Party 5C (copy to Working Parties 4A, 4B, 4C, 5A, 5B, 6A and 7C for information) - Studies under WRC-27 agenda item 1.10
WP 7D
AI1.10
2024-09-30
[ 66 ]
Proposal on the work plan for the future development of satellite IMT-2030
China
2024-09-27
[ 65 ]
Contribution to working document towards a preliminary draft new report on development and technology trends for the satellite component of IMT towards 2030 and beyond
China
2024-09-27
[ 64 ]
Proposal for a new study on detailed specifications of the satellite radio interfaces of international mobile telecommunications-2020 (IMT-2020)
China
2024-09-27
[ 63 ]
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C for information) - Technical information to support the studies for WRC-27 agenda items 1.12 and 1.13
WP 7D
AI1.13 , AI1.12
2024-09-27
[ 62 ]
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 7B and 7C for information) - WRC-27 agenda item 1.11
WP 7D
AI1.11
2024-09-27
[ 61 ]
Working document towards a preliminary draft new report on framework, requirements and evaluation guidelines for satellite radio interface(s) of IMT-2030
Korea (Rep. of)
2024-09-26
[ 60 ]
Proposed updates on work plan for the future development of satellite IMT-2030
Korea (Rep. of)
2024-09-26
[ 59 ]
Proposed updates on [Elements towards a working document towards a preliminary draft new Recommendation/Report ITU-R M.[MSS_OBP]]
Korea (Rep. of)
2024-09-26
[ 58 ]
Liaison statement on SG17 new work item ITU-T X.5GSEC-FMSC: Security requirements and guidelines for fixed, mobile and satellite convergence of IMT-2020 networks and beyond
ITU-T SG17
2024-09-12
[ 57 ]
Final evaluation analysis from ATIS WTSC IMT-2020 Independent Evaluation Group on the 3GPP submission(s) toward IMT-2020 satellite component technologies
Alliance for Telecommunications Industry Solutions (ATIS)
2024-09-11
[ 56 ]
ITU-R Handbook on satellite communications
Editor of Satellite Communications Handbook
2024-09-05
[ 55 ]
Liaison statement on consent of draft new Recommendation ITU-T Y.3215 (Ex.Y.FMSC-NS-REQ) - Fixed, mobile and satellite convergence - Requirements of network sharing for IMT-2020 networks and beyond
ITU-T SG13
2024-08-26
[ 54 ]
Liaison statement on consent of draft new Recommendation ITU-T Y.3214 (Ex.Y.FMSC-SFC) - Fixed, mobile and satellite convergence - Service function chain (SFC) for IMT-2020 networks and beyond
ITU-T SG13
2024-08-26
[ 53 ]
Liaison statement on consent of draft new Recommendation ITU-T Y.3213 (Ex.Y.FMSC-PC) - Fixed, mobile and satellite convergence - Policy control for IMT-2020 networks and beyond - For consent
ITU-T SG13
2024-08-26
[ 52 ]
Liaison statement on consent of draft new Recommendation ITU-T Y.3212 (Ex.Y.FMSC-HAP-REQ) - Fixed, mobile and satellite convergence - Requirements of supporting high altitude platform for IMT-2020 networks and beyond
ITU-T SG13
2024-08-26
[ 51 ]
Liaison statement on determination of draft new Recommendation ITU-T Y.3211 (Ex. Y.FMSC-ABC-REQ) - Fixed, mobile and satellite convergence - Requirements of supporting airborne broadband communication for IMT-2020 networks and beyond
ITU-T SG13
2024-08-26
[ 50 ]
Liaison statement on consent of draft new Recommendation ITU-T Y.3210 (Ex.Y.FMSC-DLT) - Fixed, mobile and satellite convergence - Distributed ledger technology for IMT-2020 networks and beyond
ITU-T SG13
2024-08-26
[ 49 ]
Liaison statement on consent of draft new Recommendation ITU-T Y.3209 (Ex.Y.FMSC-TS) - Fixed, mobile and satellite convergence - Traffic scheduling for IMT-2020 networks and beyond
ITU-T SG13
2024-08-26
[ 48 ]
Liaison statement on consent of draft new Recommendation ITU-T Y.3208 (Ex.Y.FMSC-SMSB) - Fixed, mobile and satellite convergence - Session management with satellite backhaul for IMT-2020 networks and beyond
ITU-T SG13
2024-08-26
[ 47 ]
Liaison statement on progress of distributed ledger technology (DLT) standardization in Q2/13
ITU-T SG13
2024-08-23
[ 46 ]
Liaison statement on consent of draft new Recommendation ITU-T Y.3216 (Ex.Y.FMSC-DCN) - Fixed, mobile and satellite convergence - Distributed core network for IMT-2020 networks and beyond
ITU-T SG13
2024-08-23
[ 45 ]
Information on the preparation of texts for the draft CPM Report to WRC-27
Chair, CPM-27
2024-07-09
[ 44 ]
Liaison statement to ITU-T Study Group 17 and ITU-R Working Parties 4B and 5D - Terms and definitions related to IMT-2020 (5G) technology
CCT
2024-06-27
[ 43 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 4B, 5A, 5B, 5C, 6B and 7C for information) - WRC-27 agenda item 1.4
WP 3M
AI1.4
2024-06-12
[ 42 ]
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A,7B, 7C and 7D for information) - Studies under WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14
WPs 3L and 3M
AI1.14 , AI1.13 , AI1.12 , AI1.11
2024-06-12
[ 41 ]
Reply liaison statement to Working Party 5C (copy to Working Parties 1A, 4A, 4B, 4C, 5A, 5B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10
WPs 3J and 3M
AI1.10
2024-06-11
[ 40 ]
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5D, 6A, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.13
WP 5C
AI1.13
2024-05-29
[ 39 ]
Liaison statement to Working parties 4A, 4C, 5A, 5B, 3J and 3M (copy to Working Parties 1A, 4B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10
WP 5C
AI1.10
2024-05-29
[ 38 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 5A, 5B, 6B, AND 7C for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.4
WP 5C
AI1.4
2024-05-29
Resultados :187 documentos Resultados :
Anterior -
1 -
2 -
3 -
4
- Siguiente
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):