Contribuciones  |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 978 ]
|
Recommendation ITU-R S.1323-2 Procedure D
|
SES
|
|
2026-04-22 |
|
[ 977 ]
|
Working document towards a preliminary draft new Recommendation ITU-R S.[NON-GSO-MODELLING] - Modelling and simulation of non-GSO FSS systems for use in sharing and compatibility studies
|
SES
|
|
2026-04-22 |
|
[ 976 ]
|
GSO coordination and absolute increase in unavailability
|
SES
,
Arab Satellite Communications Organization
,
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
,
Azerbaijan
,
EUTELSAT
,
HISPASAT, S.A.
,
SKY Perfect JSAT Corporation
,
Space Norway AS
,
The Egyptian Satellite Company (Nilesat)
|
|
2026-04-22 |
|
[ 975 ]
|
Proposed revisions to working document towards a preliminary draft new Recommendation ITU-R S.[NON-GSO-MODELLING] - Modelling and simulation of non-GSO FSS systems for use in sharing and compatibility studies
|
China
|
|
2026-04-22 |
|
[ 974 ]
|
To elevate working document towards a preliminary draft revision of Recommendation ITU-R S.1529 - Analytical method for determining the statistics of interference between non geostationary satellite orbit fixed-satellite service systems and other non-geostationary satellite orbit fixed satellite service systems or geostationary satellite orbit fixed satellite service networks
|
China
|
|
2026-04-22 |
|
[ 973 ]
|
Proposed revisions to working document towards a preliminary draft Handbook on best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services
|
China
|
|
2026-04-22 |
|
[ 972 ]
|
Proposal for the elements of the working document towards a preliminary draft new Recommendation ITU-R S.[NGSO DEORBITING][new recommendation providing guidance on safe and efficient deorbit and/or disposal strategies and methodologies for non-GSO space stations]
|
China
|
|
2026-04-22 |
|
[ 971 ]
|
Revisions for Stage 1 and 2 process (Resolution 76 (Rev.WRC-23))
|
China
|
|
2026-04-22 |
|
[ 970 ]
|
Proposed topic to be considered under WRC-27 agenda item 7 - To develop possible regulatory measures to implement Radio Regulations No. 4.4
|
China
|
AI7
|
2026-04-22 |
|
[ 969 ]
|
Assessing the review of the existing coordination arc thresholds for frequency bands above 3.4/17.3 GHz
|
China
|
AI7
|
2026-04-22 |
|
[ 968 ]
|
Assessing the potential advantage to define coordination arc for some frequency bands above 3.4 GHz
|
China
|
AI7
|
2026-04-22 |
|
[ 967 ]
|
Considerations on WRC-27 agenda item 7 related matters
|
China
|
AI7
|
2026-04-22 |
|
[ 966 ]
|
Draft contribution to Working Party 4A on WRC-27 agenda item 1.6
|
China
|
AI1.6
|
2026-04-22 |
|
[ 965 ]
|
Proposals of elements of working document towards draft CPM text for WRC-27 agenda item 1.5
|
China
|
AI1.5
|
2026-04-22 |
|
[ 964 ]
|
Revisions for editorial revision of Annex 8 of Document 4A/830 - Working document towards draft CPM text for WRC-27 agenda item 1.4
|
China
|
AI1.4
|
2026-04-22 |
|
[ 963 ]
|
Compatibility studies between non-GSO FSS gateways in the 51.4-52.4 GHz frequency band and EESS (passive) sensors in the 52.6-54.25 GHz frequency band under WRC-27 agenda item 1.3
|
China
|
AI1.3
|
2026-04-22 |
|
[ 962 ]
|
Proposed draft CPM text for WRC-27 agenda item 1.2
|
China
|
AI1.2
|
2026-04-22 |
|
[ 961 ]
|
Update to sharing study for WRC-27 agenda item 1.1
|
China
|
AI1.1
|
2026-04-22 |
|
[ 960 ]
|
Proposed modification to the working document towards topic under WRC-27 agenda item 7 assessing the potential advantage to define coordination arc for some frequency bands above 3.4 GHz
|
Indonesia
|
AI7
|
2026-04-22 |
|
[ 959 ]
|
Proposed updates of studies for being included in the working document on WRC-27 agenda item 1.2
|
Indonesia
|
AI1.2
|
2026-04-22 |
|
[ 958 ]
|
Assessment of the impact of ka-band uplink epfd limits on GSO satellite networks as proposed technical studies in response to WRC-23 minutes on Article 22 epfd limits [without any regulatory consequences [for information]]
|
Indonesia
|
|
2026-04-22 |
|
[ 957 ]
|
Proposal regarding section 2.4.2 of the ITU-R Handbook on best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services
|
Secure World Foundation
|
|
2026-04-22 |
|
[ 956 ]
|
[Protection of geostationary networks from the aggregate interference produced by non-geostationary FSS systems in the Q/V band ranges]
|
France
|
|
2026-04-21 |
|
[ 955 ]
|
Supporting material for draft CPM text on WRC-27 agenda item 1.1 - Use of frequency bands 47.2-50.2 GHz and 50.4-51.4 GHz (Earth-to-space) by aeronautical and maritime earth stations in motion in the fixed-satellite service
|
France
|
AI1.1
|
2026-04-21 |
|
[ 954 ]
|
Working document towards draft CPM text on WRC-27 agenda item 1.1 - Use of frequency bands 47.2-50.2 GHz and 50.4-51.4 GHz (Earth-to-space) by aeronautical and maritime earth stations in motion in the fixed-satellite service
|
France
|
AI1.1
|
2026-04-21 |
|
[ 953 ]
|
Technical studies on epfd limits in RR Article 22 - Analysis of the links in Recommendation ITU-R S.1328 database
|
France
|
|
2026-04-21 |
|
[ 952 ]
|
Preliminary draft new Recommendation ITU-R S.[RESOLUTION 770] - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks in Q/V band with criteria contained in No. 22.5L of the Radio Regulations
|
France
|
|
2026-04-21 |
|
[ 951 ]
|
Working document towards a preliminary draft new Report ITU-R S.[INTERFERENCE-NGSO-NGSO/GSO] - Examples of methodologies to assess interference levels during coordination when non-geostationary FSS satellite systems for frequency ranges between 10.7 and 52.4 GHz are involved
|
France
|
|
2026-04-21 |
|
[ 950 ]
|
Proposed modifications to the working document towards draft CPM text for WRC-27 agenda item 1.2
|
France
|
AI1.2
|
2026-04-21 |
|
[ 949 ]
|
Technical studies related to the uplink epfd limits
|
Canada
|
|
2026-04-21 |
|
[ 948 ]
|
Proposed changes to working document towards a preliminary draft revision of recommendation ITU R S.2157-1 - Procedures for the evaluation of interference from any non-geostationary-satellite system into a global set of the generic geostationary-satellite reference links in the frequency bands 37.5-39.5 GHz (space-to-Earth)...
|
Canada
|
|
2026-04-21 |
|
[ 947 ]
|
epfd technical studies approach, and establishing a set of validated ka-band GSO reference links
|
Canada
|
|
2026-04-21 |
|
[ 946 ]
|
Elements relating to working document towards a preliminary draft revision of Recommendation ITU-R S.1526-1 - Methodology to assess the interference environment in relation to Nos. 9.12, 9.12A and 9.13 of the Radio Regulations when non-geostationary-satellite orbit fixed-satellite service systems are involved
|
Canada
|
|
2026-04-21 |
|
[ 945 ]
|
Resolution 76 (Rev.WRC-23) - Stage 2 Process (Detailed analysis at consultation meeting based on operational parameters) as required under Resolution 76 (Rev.WRC-23)
|
Canada
|
|
2026-04-21 |
|
[ 944 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R S.1715 - Guidelines developed in response to the studies requested in Resolution 140 (WRC-03)
|
Canada
|
|
2026-04-21 |
|
[ 943 ]
|
Proposed modifications to preliminary draft new Recommendation ITU-R S.[RESOLUTION 770] - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks in Q/V band with criteria contained in No. 22.5L of the Radio Regulations
|
Canada
|
|
2026-04-21 |
|
[ 942 ]
|
Proposed modifications to working document on Recommendation ITU-R S.[ESIM-NCMC] - The functionalities and implementation of a network control and monitoring centre for earth stations in motion
|
Canada
|
|
2026-04-21 |
|
[ 941 ]
|
Views on candidate topic on the responsibilities of notifying administrations under WRC-27 agenda item 7
|
Canada
|
AI7
|
2026-04-21 |
|
[ 940 ]
|
Proposed draft CPM text for topic on RR No. 4.4 under WRC-27 agenda item 7
|
Canada
|
AI7
|
2026-04-21 |
|
[ 939 ]
|
Views on potential topic on RR No. 11.41 under WRC-27 agenda item 7
|
Canada
|
AI7
|
2026-04-21 |
|
[ 938 ]
|
CPM text for topic on Appendix 4 under WRC-27 agenda item 7
|
Canada
|
AI7
|
2026-04-21 |
|
[ 937 ]
|
Modification proposals to the working document towards draft CPM text for WRC-27 agenda item 1.5
|
Canada
|
AI1.5
|
2026-04-21 |
|
[ 936 ]
|
Update to working document towards draft CPM text on WRC-27 agenda item 1.4
|
Canada
|
AI1.4
|
2026-04-21 |
|
[ 935 ]
|
Proposed revisions to working document towards draft CPM text for WRC-27 agenda item 1.3
|
Canada
|
AI1.3
|
2026-04-21 |
|
[ 934 ]
|
Effect of FSS station distance from shore on interference into shipborne radiolocation radars in the 13.75-14 GHz band under WRC-27 agenda item 1.2
|
Canada
|
AI1.2
|
2026-04-21 |
|
[ 933 ]
|
Update to working document towards draft CPM text on WRC-27 agenda item 1.2
|
Canada
|
AI1.2
|
2026-04-21 |
|
[ 932 ]
|
Aggregate interference from GSO and non-GSO FSS networks into shipborne radiolocation radars in the 13.75-14 GHz band under WRC-27 agenda item 1.2
|
Canada
|
AI1.2
|
2026-04-21 |
|
[ 931 ]
|
Update to working document towards draft CPM text on WRC-27 agenda item 1.1
|
Canada
|
AI1.1
|
2026-04-21 |
|
[ 930 ]
|
Revisions for elements towards draft CPM text for WRC-27 agenda item 1.2
|
Singapore
,
Papua New Guinea
|
AI1.2
|
2026-04-21 |
|
[ 929 ]
|
Working document relating to WRC-27 agenda item 1.3 - Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)
|
European Space Agency (ESA)
,
European Organisation for the Exploitation of Meteorological Satellite
|
AI1.3
|
2026-04-21 |
Resultados :1078 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22
- Siguiente

|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):