International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 5 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 5  C 

ITU-T SG 5

Environment, climate change and circular economy

Study Period 2017

Results:181 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
Contributions  [ AI/Question: Q2/5 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 298 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 8: Updating K.44 for 400 V d.c. powering     Bourns Limited   Q2/5   2018-07-04
[ 297 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 7: Test circuit figure to replace K.44 Figure A.6.6-2, Figure A.6.6-1a and Figure A.6.6-1b.     Bourns Limited   Q2/5   2018-07-03
[ 296 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 6: Review of 7.8 and 7.9 test entries (K.20 and K.21)     Bourns Limited   Q2/5   2018-07-03
[ 295 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 5: Review of DC power feed surge test figures of Table 1b (K.20, K.21 and K.45)     Bourns Limited   Q2/5   2018-07-02
[ 294 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 4: DC power feed tests of Tables 1a and 1b (K.20, K.21 and K.45)     Bourns Limited   Q2/5   2018-07-01
[ 293 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 3: Powering supply configurations     Bourns Limited   Q2/5   2018-06-30
[ 292 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 2: Grid terms review     Bourns Limited   Q2/5   2018-06-30
[ 291 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part1 Background     Bourns Limited   Q2/5   2018-06-29
[ 272 ]  
(Rev.1) 
IEC 60617 compliance and PoE testing     Bourns Limited   Q2/5   2018-05-08
[ 271 ]  
(Rev.1-2) 
Insulation co-ordination and IEEE 802.3 insulation tests     Bourns Limited   Q2/5   2018-05-08
[ 270 ]  
(Rev.1) 
IP PoE camera systems - Bridging Functional Insulation - implications and system consequences     Bourns Limited   Q2/5, Q1/5   2018-05-08
[ 269 ]  
 
Clarification needed on PoE testing - topics for discussion     Bourns Limited   Q2/5   2018-05-08
[ 267 ]  
 
Referencing Figure 6.7-3 given in the ITU-T K.44     Bourns Limited   Q2/5   2018-05-08
[ 264 ]  
(Rev.1-3) 
Some reworked material for K.rcd document     Bourns Limited , China Telecommunications Corporation   Q2/5   2018-05-08
[ 261 ]  
(Rev.1) 
Proposal for the revision of ITU-T Rec. K.21 (07/2017) Resistibility of telecommunication equipment installed in customer premises to overvoltages and overcurrents     Nokia Corporation   Q2/5   2018-05-07
[ 260 ]  
(Rev.1) 
Proposal for the revision of ITU-T Rec. K.45 (07/2017) Resistibility of telecommunication equipment installed in the access and trunk networks to overvoltages and overcurrents     Nokia Corporation   Q2/5   2018-05-07
[ 250 ]  
(Rev.1) 
Comments and proposed changes to K 44     Cisco Systems, Inc.   Q2/5   2018-05-07
[ 248 ]  
 
Proposal about resistibility level of internal Ethernet port     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2018-05-07
[ 247 ]  
 
Proposed revision of K.44 for definition of "Intra-system port"     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2018-05-07
[ 244 ]  
(Rev.1) 
Proposal for the revision of ITU-T Rec. K.20 (07/2017) Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents     Nokia Corporation   Q2/5   2018-05-03
[ 243 ]  
(Rev.1) 
Proposals to revise K.44 (2017) Resistibility tests for telecommunication equipment exposed to overvoltagesand overcurrents - Basic Recommendation     Nokia Corporation   Q2/5   2018-05-03
[ 241 ]  
(Rev.1-2) 
The proposal of Mains power contact test for outdoor UTP/STP Ethernet in ITU-T K.20/K.21/K.45     Huawei Technologies Co., Ltd.   Q2/5   2018-05-03
[ 235 ]  
 
Proposed second draft of new Recommendation K.spdsafe "Guidance on safety relating to the use of surge protective devices and surge protective components in customer building and access network"     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2018-04-27
[ 234 ]  
 
Comments on use of terms of insulation and isolation     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2018-04-27
[ 233 ]  
 
Study of the desirability of easing the overvoltage resistibility requirement for STP Ethernet ports in K.20 and K.21     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2018-04-26
[ 232 ]  
(Rev.1) 
A Study on necessity of overvoltage test of USB port in K.20 and K.21 (in the case of connecting USB device which is supplied power by an AC adapter)     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2018-04-26
[ 231 ]  
 
K.45 cable length of 6 meters or less are exempt from testing     ADTRAN   Q2/5   2018-04-23
[ 229 ]  
 
K.20 internal cable length of 10 meters or less are exempt from testing.     ADTRAN   Q2/5   2018-04-19
[ 228 ]  
(Rev.1) 
Bridging Ethernet functional insulation     Bourns Limited   Q2/5   2018-04-19
[ 227 ]  
(Rev.1-2) 
MOV rating requirements for K. appl2 document     Littelfuse UK Ltd.   Q2/5   2018-04-19
[ 226 ]  
(Rev.1-2) 
MOV application guidance for K.appl2 document     Littelfuse UK Ltd.   Q2/5   2018-04-18
[ 225 ]  
(Rev.1-3) 
Small form factor connector potential hazards     Littelfuse UK Ltd.   Q2/5   2018-04-17
[ 220 ]  
(Rev.1) 
High current-carrying components in Recommendations K.20, K.21, K.44 and K.45     Bourns Limited   Q2/5   2018-03-30
[ 219 ]  
(Rev.1-2) 
K.44 1.2/50 generator enhancements     Bourns Limited   Q2/5   2018-03-30
[ 218 ]  
 
Corrections and changes in test rows 5.2.2a and 5.2.2b in K.20, K.21 and K.45     Bourns Limited   Q2/5   2018-03-29
[ 217 ]  
 
K.44, Correction of Figure A.3-6, Figure A.6.1-3 and Note 1 of Table A.5-1     Bourns Limited   Q2/5   2018-03-28
[ 151 ]  
 
Isolation transformers and rated insulation withstand     Bourns Limited   Q8/5, Q2/5   2017-10-31
[ 146 ]  
(Rev.1) 
Comments and proposed changes to K .44     Cisco Systems, Inc.   Q2/5   2017-10-31
[ 142 ]  
 
Characteristics of Metal Oxide Varistors (MOVs) for the protection of telecommunications installations     Huawei Technologies Co., Ltd.   Q2/5   2017-10-30
[ 135 ]  
(Rev.1) 
Partially edited COM 595 "The draft of Recommendation ITU-T K.appl2"     Bourns Limited   Q2/5   2017-10-30
[ 129 ]  
 
The first draft of K.sod "Surge and over-current protection parameters of external disconnector for surge protective devices used in telecommunication equipment"     China Unicom   Q2/5   2017-10-30
[ 128 ]  
 
proposal about Ethernet transverse lightning test level     China Unicom   Q2/5   2017-10-30
[ 127 ]  
 
Problems on application of surge immunity test method in IEC 61000-4-5 Ed.3.to telecommunication equipment     Nippon Telegraph and Telephone Corporation (NTT)   Q4/5, Q2/5   2017-10-30
[ 124 ]  
 
Proposed first draft of new Recommendation K.spdsafe "Guidance on safety relating to the use of surge protective devices and surge protective components in customer building and access network"     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2017-10-30
[ 120 ]  
 
The necessity of a detailed study on deletion of overvoltage resistibility requirement for USB port in K.20 and K.21     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2017-10-30
[ 105 ]  
 
Replies to Suggestions for K.99 Surge protective component application guide - Gas discharge tubes     Bourns Limited   Q2/5   2017-10-27
[ 95 ]  
 
Screened, shielded and coaxial cable definitions for K.44     Bourns Limited   Q2/5   2017-10-17
[ 94 ]  
 
TD 123 K.44 8/20 generator artwork check     Bourns Limited   Q2/5   2017-10-17
[ 92 ]  
 
Ethernet port differential surge test with reduced i²t     Bourns Limited   Q2/5   2017-10-15
[ 91 ]  
 
Ethernet port current surge parameters     Bourns Limited   Q2/5   2017-10-14
Results:181 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-24