Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2113 ]
|
Incremental Query in SDN
|
ZTE Corporation
|
Q14/15, Q12/15
|
2016-09-06 |
|
[ 2112 ]
|
Alarm Processing in Virtual Network
|
ZTE Corporation
|
Q14/15, Q12/15
|
2016-09-06 |
|
[ 2111 ]
|
Transport network batch query and processing solution in SDN environment
|
ZTE Corporation
|
Q14/15, Q12/15
|
2016-09-06 |
|
[ 2110 ]
(Rev.1) |
Transport synchronization message in FlexO interface
|
ZTE Corporation
|
Q13/15, Q11/15
|
2016-09-06 |
|
[ 2109 ]
|
Overhead processing of FlexE and FlexO atomic function
|
ZTE Corporation
|
Q11/15
|
2016-09-06 |
|
[ 2108 ]
|
Comments on draft G.8131 Amd.2 (TD575/PLEN)
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2016-09-06 |
|
[ 2107 ]
|
Proposed modification to Clause 9.1.3.1 (EDNI message) of G.Sup-ELPDNI
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2016-09-06 |
|
[ 2106 ]
|
Sterlite's proposal on revision of G.652 and G.657
|
Sterlite Optical Technologies Ltd
|
Q5/15
|
2016-09-06 |
|
[ 2105 ]
|
Proposed revision for Appendixes on draft Recommendation L.380 (ex L.nrr-frm) "Framework of disaster management for network resilience and recovery"
|
National Institute of Information and Communications Technology
|
Q17/15
|
2016-09-06 |
|
[ 2104 ]
|
Consideration on holdover state for T-BC
|
NEC Corporation
|
Q13/15
|
2016-09-06 |
|
[ 2103 ]
|
G.8272.1 edits
|
Microsemi Corporation
|
Q13/15
|
2016-09-06 |
|
[ 2102 ]
|
G.8272.1 Appendix D
|
Microsemi Corporation
|
Q13/15
|
2016-09-06 |
|
[ 2101 ]
|
G.8272.1 autonomous primary reference clock performance requirements
|
Microsemi Corporation
|
Q13/15
|
2016-09-06 |
|
[ 2100 ]
|
Modelling of ETY layer
|
Coriant GmbH & Co. KG
|
Q14/15, Q11/15, Q10/15
|
2016-09-06 |
|
[ 2099 ]
(Rev.1) |
Analysis of the synchronization requirements of 5G and suggestion on new network reference model
|
China Mobile Communications Corporation
|
Q13/15
|
2016-09-06 |
|
[ 2098 ]
|
Proposed text for MPLS-TP Shared Ring Protection (G.8132)
|
China Mobile Communications Corporation
,
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co., Ltd.
|
Q9/15
|
2016-09-06 |
|
[ 2097 ]
(Rev.1) |
Basic requirements for channel bonding of NG-PON2
|
ZTE Corporation
|
Q2/15
|
2016-09-06 |
|
[ 2096 ]
(Rev.1) |
Proposal for interface requirements in Recommendation L.pneid clause 10
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q16/15
|
2016-09-06 |
|
[ 2095 ]
(Rev.1) |
Channel bonding establishment for NGPON2
|
ZTE Corporation
|
Q2/15
|
2016-09-06 |
|
[ 2094 ]
|
The suggestion on the service information model based on MPLS-TP
|
China Mobile Communications Corporation
,
FiberHome Technologies Group
|
Q14/15, Q12/15
|
2016-09-06 |
|
[ 2093 ]
(Rev.1) |
Big channel scheme for channel bonding of NG-PON2
|
ZTE Corporation
|
Q2/15
|
2016-09-06 |
|
[ 2092 ]
(Rev.1) |
proposal for 25G PON
|
ZTE Corporation
|
Q2/15
|
2016-09-06 |
|
[ 2091 ]
|
The suggestion about adding some new characteristics of optical transport network equipment
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-09-06 |
|
[ 2090 ]
|
Attributes for SyncE extended SSM
|
ZTE Corporation
|
Q14/15, Q13/15
|
2016-09-06 |
|
[ 2089 ]
|
G.fast: Excluding persistent near-end los defect from fast retrain triggers
|
Huawei Technologies Co., Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2088 ]
(Rev.1) |
Synchronization OAM
|
ZTE Corporation
|
Q14/15, Q13/15
|
2016-09-06 |
|
[ 2087 ]
|
G.fast: INM procedure and control parameters
|
Intel Corporation
|
Q4/15
|
2016-09-06 |
|
[ 2086 ]
|
G.fast: The next generation of DSL beyond current G.fast
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
Swisscom SA
|
Q4/15
|
2016-09-06 |
|
[ 2085 ]
|
Requirements for a common service information model
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q14/15
|
2016-09-06 |
|
[ 2084 ]
|
G.fast: Revising ETR_min and ETR_min_eoc
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-09-06 |
|
[ 2083 ]
|
G.fast: Simulation results on linear precoding and non-linear precoding
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-09-06 |
|
[ 2082 ]
|
Adding a note to clarify PRMPSDds
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-09-06 |
|
[ 2081 ]
|
APTS network limit of G.8271.2 and noise generation of G.8273.4
|
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2016-09-06 |
|
[ 2080 ]
|
G.vector: Extending pilot sequence length to 1024
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-09-06 |
|
[ 2079 ]
|
Proposals for G.8266 clock with GNSS receiver and G.8272.1 scope
|
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2016-09-06 |
|
[ 2078 ]
|
G.vector: Supporting zero bits and measuring QLN based on zero bits
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-09-06 |
|
[ 2077 ]
|
SyncE clock ID of G.8264
|
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2016-09-06 |
|
[ 2076 ]
|
G.vlc: Multi-pulse Pulse Position Modulation with dimming support
|
Futurewei Technologies US R&D Center
|
Q18/15
|
2016-09-06 |
|
[ 2075 ]
|
Sub-Nyquist Artefacts and Sampling Moiré Effects when Measuring PTP to PTP and PTP to 1 PPS Noise Transfer (G.8272.3, G.supp)
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2074 ]
|
Proposed notes for 7.3.1/G.8273.2 (PTP to PTP noise transfer) and C.2.3.1/G.8273.2 (PTP to 1PPS noise transfer)
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2073 ]
|
Miscellaneous Proposals for Revised Recommendation G.781
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2072 ]
|
Initial Simulation Results for Wander Accumulation in a Chain of eEECs (G.8262.1, G.supp)
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2071 ]
|
G.8275.2 - Deny service
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2070 ]
(Rev.1) |
Same path of SyncE frequency and PTP time
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2069 ]
|
OMCI management support for XGS-PON
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
|
Q2/15
|
2016-09-06 |
|
[ 2068 ]
|
Short-term phase transient and phase discontinuity of G.8266
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2067 ]
|
Wide-Band Jitter Accumulation Simulation Results for Transport of Higher-Rate Ethernet Clients over B100G OTN based on Multiple Replications
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2066 ]
|
Proposals on Chinese experience in revision of Rec. L.79
|
FiberHome Technologies Group
|
Q16/15
|
2016-09-06 |
|
[ 2065 ]
|
Proposed future ONU management reference model in G.988
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2016-09-06 |
|
[ 2064 ]
|
Proposed G.FAST updates in G.988
|
Huawei Technologies Co., Ltd.
|
Q2/15
|
2016-09-06 |
Results:344 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):