Temporary Documents
(GEN)
 |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 903-GEN ]
|
Incoming LS: Liaison reply to ITU-T SG5, Request for a liaison on Ethernet port isolation between SG5 HNSG and IEEE 802.3 Group
|
IEEE 802.3
|
Q8/5, Q6/5, Q5/5, Q4/5, Q13/5, Q11/5, Q10/5
|
2011-09-20 |
|
[ 902-GEN ]
|
Incoming LS: Current draft deliverables from ITU-T FG on Smart Grids
|
FG Smart Grids
|
QALL/5
|
2011-09-20 |
|
[ 901-GEN ]
(Rev.1) |
Progress report and agenda for Q8/5
|
Rapporteur Q8/5
|
Q8/5
|
2011-09-20 |
|
[ 900-GEN ]
|
Draft of L.measure
|
Rapporteur Q17/5
|
Q17/5
|
2011-09-20 |
|
[ 899-GEN ]
|
Progress report and agenda for Question 21/5
|
Rapporteur Q21/5
|
Q21/5
|
2011-09-20 |
|
[ 898-GEN ]
(Rev.1-2) |
Third draft of new Recommendation L.DC
|
Rapporteur Q17/5
|
Q17/5
|
2011-09-20 |
|
[ 897-GEN ]
|
Last available draft of L.metrics
|
Rapporteur Q17/5
|
Q17/5
|
2011-09-20 |
|
[ 896-GEN ]
|
Status of SG5 WP1 Q13/5
|
Rapporteur Q13/5
|
Q13/5
|
2011-09-20 |
|
[ 895-GEN ]
|
Draft document allocation of Qeustion 18/5 session
|
Rapporteur Q18/5
|
Q18/5
|
2011-09-20 |
|
[ 894-GEN ]
|
IEC SC77C and IEEE EMC TC5 activities
|
Rapporteur Q15/5
|
Q15/5
|
2011-09-20 |
|
[ 893-GEN ]
|
Draft agenda of Question 15/5
|
Rapporteur Q15/5
|
Q15/5
|
2011-09-20 |
|
[ 892-GEN ]
(Rev.1) |
The third draft of draft new Recommendation K.LCL - Method for measuring Longitudinal Conversion Loss (9kHz - 30MHz)
|
Rapporteur Q1/5
|
Q1/5
|
2011-09-20 |
|
[ 891-GEN ]
|
Agenda and Status of Question 1/5
|
Rapporteur Q1/5
|
Q1/5
|
2011-09-20 |
|
[ 890-GEN ]
|
Agenda: Question 17/5
|
Rapporteur Q17/5
|
Q17/5
|
2011-09-20 |
|
[ 889-GEN ]
|
Progress report on Question 17/5
|
Rapporteur Q17/5
|
Q17/5
|
2011-09-20 |
|
[ 888-GEN ]
|
Question 16/5 agenda
|
Rapporteur Q16/5
|
Q16/5
|
2011-09-20 |
|
[ 887-GEN ]
|
Progress report of Question 5/5
|
Rapporteur Q5/5
|
Q5/5
|
2011-09-20 |
|
[ 886-GEN ]
|
Draft meeting agenda for Q19/5
|
Rapporteur Q19/5
|
Q19/5
|
2011-09-19 |
|
[ 885-GEN ]
|
Incoming LS: LS to ITU-T SG5 on EEPS activity
|
ETSI TC EE
|
Q23/5, Q22/5, Q21/5, Q20/5, Q19/5, Q18/5, Q17/5
|
2011-09-19 |
|
[ 884-GEN ]
|
Incoming LS: LS to ITU-T SG5 on 400V dc standard
|
ETSI TC EE
|
Q19/5
|
2011-09-19 |
|
[ 883-GEN ]
|
Incoming LS: LS to ITU-T SG5 on data center best practices
|
ETSI TC EE
|
Q17/5
|
2011-09-19 |
|
[ 882-GEN ]
|
First draft text of Recommendation K.secmiti "Mitigation methods against EM security threats"
|
Rapporteur Q15/5
|
Q15/5
|
2011-09-19 |
|
[ 881-GEN ]
(Rev.1-2) |
Working draft text of Recommendation K.sec "Guide for the application of electromagnetic security requirements - Basic Recommendation"
|
Rapporteur Q15/5
|
Q15/5
|
2011-09-19 |
|
[ 880-GEN ]
|
The issue about special overvoltage and overcurrent resisitibility requirement
|
Rapporteur Q6/5
|
Q6/5, Q4/5
|
2011-09-19 |
|
[ 879-GEN ]
|
Status of Question 16/5
|
Rapporteur Q16/5
|
Q16/5
|
2011-09-19 |
|
[ 878-GEN ]
|
Fourth draft Recommendation of "Mutual-disturbance Test Method for Performance Degradation Evaluation of Converged Terminal Devices"
|
Rapporteur Q16/5
|
Q16/5
|
2011-09-19 |
|
[ 877-GEN ]
|
Waveshape of surge current through DBS SPDs
|
Rapporteur Q5/5
|
Q5/5
|
2011-09-19 |
|
[ 876-GEN ]
|
Comments on C375
|
Rapporteur Q4/5
|
Q4/5
|
2011-09-19 |
|
[ 875-GEN ]
|
Agenda and status on Q10/5
|
Rapporteur Q10/5
|
Q10/5
|
2011-09-16 |
|
[ 874-GEN ]
(Rev.1) |
First draft of the new Recommendation K.dbs "Lightning protection of Distributed Base Station"
|
Rapporteur Q6/5
|
Q6/5, Q5/5
|
2011-09-16 |
|
[ 873-GEN ]
|
IEC TC standardization acitivity and maintenance of the standard IEC 62232
|
Rapporteur Q3/5
|
Q3/5
|
2011-09-16 |
|
[ 872-GEN ]
|
Draft agenda for ORG session
|
Editor
|
Q18/5
|
2011-09-16 |
|
[ 871-GEN ]
(Rev.1) |
Agenda: Question 3/5
|
Rapporteur Q3/5
|
Q3/5
|
2011-09-15 |
|
[ 870-GEN ]
|
Status of Question 12/5
|
Rapporteur Q12/5
|
Q12/5
|
2011-09-15 |
|
[ 869-GEN ]
(Rev.1) |
Agenda: Question 12/5
|
Rapporteur Q12/5
|
Q12/5
|
2011-09-15 |
|
[ 868-GEN ]
(Rev.1) |
Resistibility Guide, 3rd draft with editorial corrections
|
Rapporteur Q4/5
|
Q4/5
|
2011-09-15 |
|
[ 867-GEN ]
|
Insulation monitor of DC power supply system
|
Editor (Q17/5)
|
Q19/5
|
2011-09-15 |
|
[ 866-GEN ]
|
ICT equipments compatibility and IEC standards verification according to 240V DC power supply system
|
Editor Q17/5
|
Q19/5
|
2011-09-15 |
|
[ 865-GEN ]
|
Incoming LS: Collaboration with ATIS STEP regarding energy efficiency metrics and measurements
|
ATIS STEP
|
Q18/5, Q17/5
|
2011-09-15 |
|
[ 864-GEN ]
|
Incoming LS: Liaison statement from IEC SMG/Strategic Group 4 (SG 4) to ITU-T Study Group 5 (Question 19/5)
|
IEC SMB SG 4
|
Q19/5
|
2011-09-15 |
|
[ 863-GEN ]
|
Incoming LS: ITU-R Activities on climate change and the environment
|
BR
|
QALL/5
|
2011-09-13 |
|
[ 862-GEN ]
(Rev.1-6) |
Draft work plan and room allocation
|
TSB
|
QALL/5
|
2011-09-13 |
|
[ 861-GEN ]
(Rev.1-3) |
Recommendation K.NGN on the EMC requirement for the Next Generation Network equipment
|
Rapporteur Q12/5
|
Q12/5
|
2011-09-13 |
|
[ 860-GEN ]
(Rev.1-3) |
Proposal to divide K.48 into three individual recommendations
|
Rapporteur Q12/5
|
Q12/5
|
2011-09-13 |
|
[ 859-GEN ]
(Rev.1) |
Proposal for special requirements
|
Rapporteur Q4/5
|
Q4/5
|
2011-09-13 |
|
[ 858-GEN ]
|
Summary of the HNSG
|
Chairman WP1/5
|
Q9/5, Q8/5, Q6/5, Q5/5, Q4/5, Q13/5, Q11/5, Q10/5
|
2011-09-13 |
|
[ 857-GEN ]
|
Criterion A and B
|
Rapporteur Q4/5
|
Q4/5
|
2011-09-13 |
|
[ 856-GEN ]
|
Multiple port testing
|
Rapporteur Q4/5
|
Q4/5
|
2011-09-13 |
|
[ 855-GEN ]
(Rev.1) |
Requirements for Home Networks - Draft new Recommendation K.hnwr
|
Chairman WP1/5
|
Q8/5, Q6/5, Q5/5, Q4/5, Q13/5, Q10/5
|
2011-09-13 |
|
[ 854-GEN ]
|
Summary and Agenda for Q4
|
Rapporteur Q4/5
|
Q4/5
|
2011-09-13 |
Results:182 total items. Result page:
Previous -
1 -
2 -
3 -
4
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):