International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : NGN-GSI : Meeting 2010-01-18 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T NGN-GSI  C (2010-01-18) 

ITU-T NGN-GSI

NGN Global Standards Initiative

Study Period 2009

Meeting  from 2010-01-18 to 2010-01-29

held in Switzerland [Geneva]

Other Meetings : 2012-12-03  2012-06-04  2012-02-06  2011-10-10  2011-05-09  2011-01-17  2010-09-06  2010-04-19  2009-09-02  2009-05-11  2009-01-12 

Results:280 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 480 ]  
 
Proposed modifications to draft recommendation Y.NGN-vehicle     ETRI   Q12/13   2010-01-08
[ 479 ]  
 
Proposed comments to draft recommendation Y.ngn-hn     ETRI   Q12/13   2010-01-08
[ 478 ]  
 
Revised Draft Recommendation Y.ipv6-object (Framework of Object Mapping using IPv6 in NGN)     ETRI   Q7/13   2010-01-08
[ 477 ]  
 
Proposed clarifications for true VoD and pseudo VoD in Y.iptvintw VoD     ETRI   Q12/13   2010-01-08
[ 476 ]  
 
Proposed comments to draft recommendation Y.iptvintwrm     ETRI   Q12/13   2010-01-08
[ 475 ]  
 
Proposed comments for legacy IP-based networks in Y.ipev     ETRI   Q12/13   2010-01-08
[ 474 ]  
 
Discussion of new work items for ICT and climate change in Q.12/13     ETRI   Q12/13   2010-01-08
[ 473 ]  
 
Proposed comments to living list on IPTV brokering     ETRI   Q12/13   2010-01-08
[ 472 ]  
 
Some proposal for the functional architecture of Y.NGN-SIDE-req     China Telecom   Q3/13   2010-01-08
[ 471 ]  
 
Proposal for modification of generic requirements of Y.NGN-SIDE-req     China Telecom   Q3/13   2010-01-08
[ 470 ]  
 
Proposed text on protocol profiles for Q.centrexSig     China Telecom   Q3/11, Q2/11   2010-01-08
[ 469 ]  
 
Proposed editorial modifications for Q.centrexSig     China Telecom   Q3/11, Q2/11   2010-01-08
[ 468 ]  
 
Proposed text for security considerations of Q.iptvsa     China Telecom   Q1/11   2010-01-08
[ 467 ]  
 
Proposed editorial modifications for Q.iptvsa     China Telecom   Q1/11   2010-01-08
[ 466 ]  
 
Proposed Modifications on section 6.1.15.2 for Y.dsnreq     China Telecom   Q19/13   2010-01-08
[ 465 ]  
 
Propose to add function entities of TOCF     China Telecom   Q19/13   2010-01-08
[ 464 ]  
 
Proposal for modification of TOCF requirement     China Telecom   Q19/13   2010-01-08
[ 463 ]  
 
Proposal for discussion about TOCF and DSN architecture     China Telecom   Q19/13   2010-01-08
[ 462 ]  
 
Proposed revision of Q.3911 draft Recommendation     China Telecom   Q9/11   2010-01-08
[ 461 ]  
 
Proposed text added into sub-clause 6.3.4 of Q.3911 draft Recommendation     China Telecom   Q9/11   2010-01-08
[ 460 ]  
 
Proposed text to be added into clause 6.4 of Q.3911 draft Recommendation     China Telecom   Q9/11   2010-01-08
[ 459 ]  
 
Proposed revision of Q.3910 draft Recommendation     China Telecom   Q9/11   2010-01-08
[ 458 ]  
 
Proposed modifications to clause 6 of Q.3910 draft Recommendation     China Telecom   Q9/11   2010-01-08
[ 457 ]  
 
Proposed modifications to fix open issues and editor's notes in Y.NGN-MCC     China Telecom , ZTE   Q3/13   2010-01-08
[ 456 ]  
 
Proposed editorial modifications to Y.NGN-MCC draft Recommendation     China Telecom , ZTE   Q3/13   2010-01-08
[ 455 ]  
 
Proposed updates of clause 10.4 of draft Y.NGN-vehicle     ETRI   Q12/13   2010-01-08
[ 454 ]  
 
Proposed Accessibility for draft Y.NGN-vehicle     ETRI   Q12/13   2010-01-08
[ 453 ]  
 
Proposed QoS control scenario over the interconnection between NGN and existing IP network     Softbank BB Corp   Q4/13   2010-01-08
[ 452 ]  
 
Proposed modification for clarification of requirement relevant to QoS control over interconnection between NGN and IP based non-NGN     Softbank BB Corp   Q4/13   2010-01-08
[ 451 ]  
 
Possible solutions for the living list for Y.NGN-R2-Reqts     Softbank BB Corp   Q3/13   2010-01-08
[ 450 ]  
 
Possible solutions for general living list of Q3/13     Softbank BB Corp   Q3/13   2010-01-08
[ 449 ]  
 
Clarification of the Mapping Relationship between the Functions Described in Y.2235(Y.cwbs) and Y.NGN-WEB     ETRI   Q12/13   2010-01-08
[ 448 ]  
 
Proposed Text to Clause 8 Reference point in Y.NACF Rev. 1     ETRI   Q5/13   2010-01-08
[ 447 ]  
 
Proposed Text to Sub-clause 8.1.2 Reference point Ne in Y.NACF Rev. 1     ETRI   Q5/13   2010-01-08
[ 446 ]  
 
Revised Draft Recommendation Y.NACF Revision 1     ETRI   Q5/13   2010-01-08
[ 445 ]  
 
Proposed modification of Clause 7 in Y.iptv-ipmcast     ETRI   Q5/13   2010-01-08
[ 444 ]  
 
Proposed modification of scope of Y.iptv-ipmcast     ETRI   Q5/13   2010-01-08
[ 443 ]  
 
Proposed revision on Section 5.4.1 rich media of Q.SupCRBT_CRT     Korea Telecom   Q2/11   2010-01-08
[ 442 ]  
 
Proposed modifications of Y.dsnreq     Nokia Siemens Networks Technology (Beijing)   Q19/13   2010-01-08
[ 441 ]  
 
Input text of draft new Recommendation Y.NGN SecRisk, "Security Risk Assessment in NGN"     ETRI   Q16/13   2010-01-08
[ 440 ]  
 
Proposal of initial draft recommendation related to "Security assurance for mobile VoIP service."     ETRI   Q16/13   2010-01-08
[ 439 ]  
 
Proposed consent of Draft Recommendation Q.3222     ETRI   Q7/11   2010-01-08
[ 438 ]  
 
Proposal for Diagram and Description for the Interface between MMCF and RACF     ETRI   Q4/13   2010-01-08
[ 437 ]  
 
Proposal for Mobile VPN Procedures and Editorial Changes     ETRI   Q8/13   2010-01-08
[ 436 ]  
 
Proposed modification of charging use cases in Y.dsnscen     Huawei Technologies   Q19/13   2010-01-08
[ 435 ]  
 
Proposed modification of Y.dsnscen     Huawei Technologies   Q19/13   2010-01-08
[ 434 ]  
 
Interworking between ANCP and RCIP in the bandwidth delegation procedure     Huawei Technologies , CATR   Q5/11   2010-01-08
[ 433 ]  
 
Proposal for clarity service continuity and load balancing in Y.MC-SCEN     Huawei Technologies   Q9/13   2010-01-08
[ 432 ]  
 
Proposal for elaborate use cases of multi-connection in Y.MC-SCEN     Huawei Technologies   Q9/13   2010-01-08
[ 431 ]  
 
Proposal for reorder Table1 in Y.MC-SCEN     Huawei Technologies   Q9/13   2010-01-08
Results:280 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2025-7-19