Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 104 ]
|
Working document towards a preliminary draft new Report ITU-R RA.[UEMR] - Unintended electromagnetic radiation from space systems into RAS frequency bands
|
Square Kilometre Array Observatory (SKAO)
,
Committee on Radio Astronomy Frequencies
|
|
2024-09-04 |
|
[ 103 ]
|
Elements regarding Earth-based RAS protection towards a draft reply liaison statement to 7B on technical information to support the studies for WRC-27 agenda item 1.15
|
Square Kilometre Array Observatory (SKAO)
|
AI1.15
|
2024-09-04 |
|
[ 102 ]
|
Updates to working document towards a preliminary draft new Report ITU-R RA.[RAS 6-7 GHZ] - Compatibility calculations between stations of the terrestrial component of IMT in the band 6 425-7 125 MHz and RAS in the band 6 650-6 675.2 MHz
|
Committee on Radio Astronomy Frequencies
,
Square Kilometre Array Observatory (SKAO)
|
|
2024-09-04 |
|
[ 101 ]
|
Draft reply liaison statement to 4C on technical information to support the studies for WRC-27 agenda items 1.13
|
Committee on Radio Astronomy Frequencies
,
Square Kilometre Array Observatory (SKAO)
|
AI1.13
|
2024-09-04 |
|
[ 100 ]
|
Reply liaison statement to Working Party 4A - Information to support studies under WRC-27 agenda items 1.1 and 1.3
|
Committee on Radio Astronomy Frequencies
,
Square Kilometre Array Observatory (SKAO)
|
AI1.3
|
2024-09-04 |
|
[ 99 ]
|
Updates to working document towards a preliminary draft new Recommendation ITU-R RA.[IMT-6GHZ] - Methods to address the determination of the protection area around existing RAS stations from IMT stations in the frequency band 6 650-6 675.2 MHz
|
Committee on Radio Astronomy Frequencies
,
Square Kilometre Array Observatory (SKAO)
|
|
2024-09-04 |
|
[ 98 ]
|
Proposed frequency bands relating to studies to protect radio astronomy in Radio Quiet Zone of SKAO in South Africa under WRC-27 agenda item 1.16
|
South Africa
|
AI1.16
|
2024-09-03 |
|
[ 97 ]
|
Template of RQZ around Large Millimeter Telescope
|
Mexico
|
|
2024-09-03 |
|
[ 96 ]
|
Proposal on way forward for study towards a preliminary draft new Report ITU-R RA.[IMT-6GHZ]
|
China
|
|
2024-09-02 |
|
[ 95 ]
|
Proposed updates to working document towards a preliminary draft new Report ITU-R RA.[SZM] - Radio astronomy facilities on the Moon
|
Japan
|
|
2024-09-02 |
|
[ 94 ]
|
Draft reply liaison statement to Working Party 7B (copy for information to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 7A and 7C) - Relevant technical information to support studies under WRC-27 agenda item 1.15
|
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science (IUCAF)
,
Committee on Radio Astronomy Frequencies
|
AI1.15
|
2024-08-30 |
|
[ 93 ]
|
Committee on the Peaceful Uses of Outer Space: 2024 - Sixty-seventh session (19-28 June 2024) - Space Sustainability Issues
|
Brazil
|
|
2024-08-26 |
|
[ 92 ]
|
Note to the Director (BR)
|
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science (IUCAF), Square Kilometre Array Observatory (SKAO)
|
|
2024-08-23 |
|
[ 91 ]
|
Draft reply liaison statement to Working Party 5C (copy to Working Parties 1A, 4A, 4B, 4C, 5A, 5B, 6A and 7C for information) - Studies under WRC-27 agenda item 1.10
|
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science (IUCAF)
|
AI1.10
|
2024-08-16 |
|
[ 90 ]
|
Draft reply liaison statement to Working Party 5B (copy to Working Parties [3J, 3K, 3M,] 4A, 4C, 5A, 5C and 7C for information) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8
|
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science (IUCAF)
|
AI1.8
|
2024-08-16 |
|
[ 89 ]
|
Draft reply liaison statement to Working Party 4C (copy to Working Parties [3L, 3M,] 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B and 7C for information) - Technical information to support the studies for WRC-27 agenda items 1.12 and 1.13
|
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science (IUCAF)
|
AI1.13, AI1.12
|
2024-08-16 |
|
[ 88 ]
|
Draft reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 7B and 7C for information) - WRC-27 agenda item 1.11
|
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science (IUCAF)
|
AI1.11
|
2024-08-16 |
|
[ 87 ]
|
Draft liaison statement to Working Party 4A (copy to Working Parties 1B, 3M, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7C for information) - WRC-27 agenda item 1.6
|
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science (IUCAF)
|
AI1.6
|
2024-08-16 |
|
[ 86 ]
|
Draft reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5C and 7C for information) - WRC-27 agenda item 1.3
|
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science (IUCAF)
|
AI1.3
|
2024-08-16 |
|
[ 85 ]
|
Draft reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B and 7C for information) - Information to support the studies under WRC-27 agenda item 1.1
|
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science (IUCAF)
|
AI1.1
|
2024-08-16 |
|
[ 84 ]
|
Draft revision of Recommendation ITU-R V.431-8 - Nomenclature of the frequency and wavelength bands used in telecommunications
|
ATDI
|
|
2024-07-26 |
|
[ 83 ]
|
Reply liaison statement to Working Party 7D - Update to preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ]
|
WP 5D
|
|
2024-07-16 |
|
[ 82 ]
|
Information on the preparation of texts for the draft CPM Report to WRC-27
|
Chair, CPM-27
|
|
2024-07-09 |
|
[ 81 ]
|
Liaison statement to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D - WRC-27 agenda item 1.7
|
WP 5D
|
AI1.7
|
2024-07-08 |
|
[ 80 ]
|
Reply liaison statement to Working Party 7C (copy to Working Parties 4C, 5A, 5D and 7D for information) - Beam Wireless Power Transmission (WPT)
|
WP 1A
|
|
2024-06-21 |
|
[ 79 ]
|
Reply liaison statement to Working Party 4C (copy to Working Parties 5A, 5D, 7C and 7D for information) - Work of Working Party 1A on beam-Wireless Power
|
WP 1A
|
|
2024-06-21 |
|
[ 78 ]
|
Reply liaison statement to Working Party 7D (copy to Working Parties 4C, 5A, 5D and 7C for information) - Beam Wireless Power Transmission (WPT)
|
WP 1A
|
|
2024-06-21 |
|
[ 77 ]
|
Reply liaison statement to Working Party 7D (copied to Working Party 5D for information) - Boundary conditions for the coordination and protection of the radio astronomy service in the 42.5-43.5 GHz band - Preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ]
|
WP 3M
|
|
2024-06-13 |
|
[ 76 ]
|
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.17
|
WPs 3L and 3M
|
AI1.17
|
2024-06-12 |
|
[ 75 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1
|
WP 3M
|
AI1.1
|
2024-06-12 |
|
[ 74 ]
|
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A,7B, 7C and 7D for information) - Studies under WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14
|
WPs 3L and 3M
|
AI1.14, AI1.13, AI1.12, AI1.11
|
2024-06-12 |
|
[ 73 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7C and 7D for information) - WRC-27 agenda item 1.3
|
WP 3M
|
AI1.3
|
2024-06-12 |
|
[ 72 ]
|
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 4C, 5A, 5C, 7C and 7D for information) - Propagation information to support studies in preparation
for WRC-27 agenda item 1.8
|
WPs 3J, 3K and 3M
|
AI1.8
|
2024-06-12 |
|
[ 71 ]
|
Reply liaison statement to Working Parties 7C and 7D (copy to Working Parties 4A, 4C, 5A, 5B and 5C for information) - Propagation aspects related to WRC-27 agenda item 1.18
|
WPs 3J and 3M
|
AI1.18
|
2024-06-12 |
|
[ 70 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Relevant technical information to support studies under WRC-27 agenda item 1.15
|
WP 3J
|
AI1.15
|
2024-06-12 |
|
[ 69 ]
|
Reply liaison statement to Working Party 5C (copy to Working Parties 1A, 4A, 4B, 4C, 5A, 5B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10
|
WPs 3J and 3M
|
AI1.10
|
2024-06-11 |
|
[ 68 ]
|
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7
|
WPs 3K and 3M
|
AI1.7
|
2024-06-10 |
|
[ 67 ]
|
Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 4A, 4C, 5A, 5B and 5D for information) - WRC-27 agenda items 1.16
|
WPs 3J and 3M
|
AI1.16
|
2024-06-10 |
|
[ 66 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 3J, 4A, 4C, 5A, 5B, 5D, 7A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.15
|
WP 5C
|
AI1.15
|
2024-05-29 |
|
[ 65 ]
|
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5D, 6A, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.13
|
WP 5C
|
AI1.13
|
2024-05-29 |
|
[ 64 ]
|
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.7
|
WP 5C
|
AI1.7
|
2024-05-29 |
|
[ 63 ]
|
Liaison statement to Working parties 4A, 4C, 5A, 5B, 3J and 3M (copy to Working Parties 1A, 4B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10
|
WP 5C
|
AI1.10
|
2024-05-29 |
|
[ 62 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.3
|
WP 5C
|
AI1.3
|
2024-05-29 |
|
[ 61 ]
|
Reply liaison statement to Working Party 5D (copy for information to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5C, 7B, 7C, 7D and ICAO) - Relevant technical information for sharing studies under WRC-27 agenda item 1.7
|
WP 5B
|
AI1.7
|
2024-05-28 |
|
[ 60 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5C, and 7D (copy to Working Party 7C for information) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8
|
WP 5B
|
AI1.8
|
2024-05-21 |
|
[ 59 ]
|
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 4C, 5A, 5B, 5C, 3J and 3M) - Relevant technical information to support studies
under WRC-27 agenda item 1.18
|
WP 4A
|
AI1.18
|
2024-05-15 |
|
[ 58 ]
|
Reply liaison statement to Working Party 7D - Relevant technical information to support studies
under WRC-27 agenda item 1.16 documenting FSS characteristics in some frequency bands
|
WP 4A
|
AI1.16
|
2024-05-14 |
|
[ 57 ]
|
Liaison statement to Working Parties 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D (copy to Working Party 7C for information) - Information to support studies under WRC-27 agenda item 1.1
|
WP 4A
|
AI1.1
|
2024-05-13 |
|
[ 56 ]
|
Liaison statement to Working Parties 5A, 5C, 3M and 7D (copy to Working Party 7C) - WRC-27 agenda item 1.3
|
WP 4A
|
AI1.3
|
2024-05-13 |
|
[ 55 ]
|
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Technical information to support the studies for WRC-27 agenda item 1.13
|
WP 4C
|
AI1.13
|
2024-05-01 |
Results:204 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):