International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5D-AR : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5D-AR  C 

ITU-R WP5D-AR

IMT Systems

Results:119 total items.
Result page:  Previous -  1 - 2 - 3
Contributions  [ Source: China (People ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 111 ]  
 
Proposal on Document IMT-2020/2 and working document of preliminary draft new Report M.[IMT-2020.SUBMISSION]     China (People's Republic of)     2016-06-07
[ 110 ]  
 
Proposal on test evironments and channel models for IMT-2020 evaluation     China (People's Republic of)     2016-06-07
[ 109 ]  
 
Proposal on the evaluation methodology of IMT-2020     China (People's Republic of)     2016-06-07
[ 108 ]  
 
Consideration on test environments for IMT-2020     China (People's Republic of)     2016-06-07
[ 107 ]  
 
Candidate technical performance requirements for ITU-R M.[IMT-2020. TECH PERF REQ]     China (People's Republic of)     2016-06-07
[ 53 ]  
 
Proposal for skeleton of draft new Report M.[IMT-2020.SUBMISSION]     Japan , China (People's Republic of) , Korea (Republic of)     2016-02-16
[ 43 ]  
 
Proposals for the skeleton of draft new Report ITU-R M.[IMT-2020.TECH PERF REQ]     Korea (Republic of) , China (People's Republic of) , Japan     2016-02-16
[ 19 ]  
 
Considerations on channel model for IMT-2020     China (People's Republic of)     2016-02-05
[ 18 ]  
 
Proposal on working document of preliminary draft new Report M.[IMT-2020.EVAL]     China (People's Republic of)     2016-02-05
[ 17 ]  
 
Consierations on working method and time plan for PDNR M.[IMT-2020.EVAL]     China (People's Republic of)     2016-02-05
[ 16 ]  
 
Proposal on skeleton of new Report M.[IMT-2020.EVAL]     China (People's Republic of) , Korea (Republic of)     2016-02-05
[ 15 ]  
 
Considerations on technical performance requirements of IMT-2020     China (People's Republic of)     2016-02-05
[ 14 ]  
 
Working methodology and time plan for new Report ITU-R M.[IMT-2020.TECH PERF REQ]     China (People's Republic of)     2016-02-05
[ 13 ]  
 
Working document - Work method and time plan for agenda item 9.1.1     China (People's Republic of)     2016-02-05
[ 12 ]  
 
Proposal on initiating the study on frequency arrangements for IMT in the frequency band 3 300-3 400 MHz and 4 800-4 990 MHz     China (People's Republic of)     2016-02-05
[ 11 ]  
 
Consideration on above 6GHz IMT networks parameters for sharing and compatibility studies     China (People's Republic of)     2016-02-05
[ 10 ]  
 
Proposal on the modeling and simulation of IMT networks for use in sharing and compatibility studies     China (People's Republic of)     2016-02-05
[ 8 ]  
 
Consideration on IMT spectrum needs estimate for WRC-19 - agenda item 1.13     China (People's Republic of)     2016-02-05
[ 7 ]  
 
Proposal on the studies on coexistence conditions between IMT and aeronautical mobile service in the band 4 800-4 990 MHz     China (People's Republic of)     2016-02-05
Results:119 total items.
Result page:  Previous -  1 - 2 - 3  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-6-20