Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 502 ]
|
Proposed modifications to working document towards draft CPM text for WRC-19 agenda item 1.5
|
China (People's Republic of)
|
AI1.5
|
2018-06-26 |
|
[ 501 ]
|
Proposal for updates to preliminary draft CPM text for WRC-19 agenda item 7, issue A
|
China (People's Republic of)
|
AI7
|
2018-06-26 |
|
[ 500 ]
|
Views and proposals on the studies of the WRC-19 agenda item 9.1 Issue 9.1.2
|
China (People's Republic of)
|
AI9.1
|
2018-06-26 |
|
[ 499 ]
|
Proposed modifications to preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - Sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9
|
China (People's Republic of)
|
AI9.1
|
2018-06-26 |
|
[ 498 ]
|
Proposed modifications to working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.9
|
China (People's Republic of)
|
AI9.1
|
2018-06-26 |
|
[ 497 ]
|
Proposed updates to preliminary draft CPM text for WRC-19 agenda item 1.6
|
China (People's Republic of)
|
AI1.6
|
2018-06-26 |
|
[ 496 ]
|
Proposed modifications to working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz
|
China (People's Republic of)
|
AI1.5
|
2018-06-26 |
|
[ 495 ]
|
[DRAFT] working document - Simplified regulatory regime for non-GSO satellites with short duration mission
|
South Africa (Republic of)
,
Netherlands (Kingdom of the)
,
Rwanda (Republic of)
,
Zimbabwe (Republic of)
|
|
2018-06-26 |
|
[ 494 ]
|
Revisions to working document on WRC-19 agenda item 1.5 - Operation of Earth Stations in Motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
|
Institute of Electrical and Electronics Engineers, Inc.
|
|
2018-06-26 |
|
[ 493 ]
|
Proposals regarding WRC-19 agenda item 7, issue K - Difficulties for part B examinations under 4.1.12 or 4.2.16 of RR Appendices 30 and 30A and 6.21 C of RR Appendix 30 B
|
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
|
|
2018-06-26 |
|
[ 492 ]
|
Proposed updates to preliminary draft CPM text for WRC-19 agenda item 1.6
|
United States of America
|
AI1.6
|
2018-06-26 |
|
[ 491 ]
|
Sharing study relating (I/N) to spectral efficiency of satellite networks using adaptive coding and modulation (ACM)
|
Canada
|
|
2018-06-25 |
|
[ 490 ]
|
Update to EESS compatibility study in the 50 GHz range under agenda item 1.6
|
Canada
|
AI1.6
|
2018-06-25 |
|
[ 489 ]
|
Revision to sharing study between GSO and non-GSO FSS systems in the 50/40 GHz bands
|
Canada
|
AI1.6
|
2018-06-25 |
|
[ 488 ]
|
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue I
|
Canada
|
|
2018-06-25 |
|
[ 487 ]
|
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue A
|
Canada
|
AI7
|
2018-06-25 |
|
[ 486 ]
|
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue H
|
Canada
|
AI7
|
2018-06-25 |
|
[ 485 ]
|
Elements for the preliminary draft CPM text for WRC-19 agenda item 1.6
|
Canada
|
AI1.6
|
2018-06-26 |
|
[ 484 ]
|
Establishment of Correspondence Group for review of V-band GSO reference links - WRC-19 agenda item 1.6
|
Canada
|
AI1.6
|
2018-06-26 |
|
[ 483 ]
|
Revisions for the draft CPM text for WRC-19 agenda item 9.1, issue 9.1.9
|
Canada
|
AI9.1
|
2018-06-25 |
|
[ 482 ]
|
Revisions for the draft CPM text for WRC-19 agenda item1.5
|
Canada
|
AI1.5
|
2018-06-25 |
|
[ 481 ]
|
FSS protection criteria to be used in studies for WRC-19 agenda items 1.13 and 1.14 for bands between 24.25 and 86 GHz
|
Brazil (Federative Republic of)
|
|
2018-06-25 |
|
[ 480 ]
|
Proposed executive sumary for the working document towards draft CPM text for WRC-19 agenda item 7 - Issue I
|
Brazil (Federative Republic of)
|
AI7
|
2018-06-25 |
|
[ 479 ]
|
Proposed executive sumary for the working document towards draft CPM text for WRC-19 agenda item 7 - Issue H
|
Brazil (Federative Republic of)
|
AI7
|
2018-06-25 |
|
[ 478 ]
|
Proposed executive sumary for the working document towards draft CPM text for WRC-19 agenda item 1.5
|
Brazil (Federative Republic of)
|
AI1.5
|
2018-06-25 |
|
[ 477 ]
|
Comments on Annex 17 to Working Party 4A Chairman's Report - Studies relating to the bringing into use of frequency assignments for all non-GSO satellite systems, and consideration of a milestone-based deployment approach fornon-GSO satellite systems in specific bands and services
|
Iran (Islamic Republic of)
|
AI7
|
2018-06-25 |
|
[ 476 ]
|
Comments on Annex 33 to Working Party 4A Chairman's Report - Preliminary draft CPM text or WRC-19 agenda item 7 - Issue A
|
Iran (Islamic Republic of)
|
|
2018-06-25 |
|
[ 475 ]
|
Criteria for the protection of fixed and broadcasting satellite services in studies under WRC-19 agenda items 1.13, 1.14 and 1.16
|
United Arab Emirates
|
|
2018-06-25 |
|
[ 474 ]
|
Proposed changes to example ESIM Resolution of Annex 29 Document 4A/675 Working Party 4A Chairman's Report - Working document toward draft CPM text for WRC-19 agenda item 1.5
|
Australia
|
AI1.5
|
2018-06-25 |
|
[ 473 ]
|
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue A
|
Indonesia (Republic of)
|
AI7
|
2018-06-25 |
|
[ 472 ]
|
Proposed modifications on working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.3
|
Indonesia (Republic of)
|
|
2018-06-25 |
|
[ 471 ]
|
Modifications to preliminaryd draft CPM text for WRC-19 agenda item 7 - Issue C (Issue C4)
|
Korea (Republic of)
|
AI7
|
2018-06-25 |
|
[ 470 ]
|
Modifications to preliminary draft CPM text for WRC-19 agenda item 7 - Issue C (Issue C7)
|
Korea (Republic of)
|
AI7
|
2018-06-25 |
|
[ 469 ]
|
Modifications to working document towards draft CPM text for WRC-19 agenda item 7 - Issue M
|
Korea (Republic of)
|
AI7
|
2018-06-25 |
|
[ 468 ]
|
Modifications to working document towards draft CPM text for WRC-19 agenda item 7 - Issue N
|
Korea (Republic of)
|
AI7
|
2018-06-25 |
|
[ 467 ]
|
Proposed modification to working document towards draft CPM text for WRC-19 agenda item 1.5
|
Korea (Republic of)
,
New Zealand
|
|
2018-06-25 |
|
[ 466 ]
|
Proposals for modification of preliminary draft CPM text for WRC-19 agenda item 7 - issue H
|
Russian Federation
|
AI7
|
2018-06-22 |
|
[ 465 ]
|
Compatibility studies between FSS in the 51.4-52.4 GHz band (Earth-to-space) and EESS (passive) in the 52.6-53 GHz band
|
Russian Federation
|
AI9.1
|
2018-06-22 |
|
[ 464 ]
|
Proposals on WRC-19 agenda item 1.4 in relation draft CPM text
|
Russian Federation
|
AI1.4
|
2018-06-22 |
|
[ 463 ]
|
Proposed revisions to the working document towards preliminary draft CPM text for WRC-19 agenda item 1.6
|
Russian Federation
|
|
2018-06-22 |
|
[ 462 ]
|
Proposed amendments to example Resolution [AI 1.5/XXX] for WRC-19 agenda item 1.5
|
Russian Federation
|
AI1.5
|
2018-06-22 |
|
[ 461 ]
|
Review of draft CPM text on WRC-19 agenda item 1.4
|
Papua New Guinea
|
|
2018-06-20 |
|
[ 460 ]
|
Discussion on the limit for provisional entry in the Region 1 and 3 lists of Appendixes 30 and 30A related to WRC-19 agenda item 7 - Issue G, Method B
|
Bulgaria (Republic of)
|
|
2018-06-19 |
|
[ 459 ]
|
Proposed modification to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MSS in the frequency band 27.5-29.5 GHz
|
Japan
|
AI1.5
|
2018-06-18 |
|
[ 458 ]
|
Proposed modification to working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz
|
Japan
|
AI1.5
|
2018-06-18 |
|
[ 457 ]
|
Proposed modifications to working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2
|
Japan
|
AI9.1
|
2018-06-18 |
|
[ 456 ]
|
Proposed modifications to working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY]
|
Japan
|
AI9.1
|
2018-06-18 |
|
[ 455 ]
|
Considerations on the PFD and EPM criteria relating to WRC-19 agenda item 7, issue G - Updating the reference situation for Region 1 and 3 networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments
|
Japan
|
AI7
|
2018-06-18 |
|
[ 454 ]
|
Proposed working document towards draft CPM text - WRC-19 agenda item 7 - issue M (Working Party 4A/ Working Party 4C)
|
Iran (Islamic Republic of)
|
|
2018-06-11 |
|
[ 453 ]
|
Draft CPM text for WRC-19 agenda item 1.4 - Agenda item 1.4
|
Spain
|
AI1.4
|
2018-05-30 |
Results:601 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):