International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A-AR : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A-AR  C 

ITU-R WP4A-AR

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:601 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 502 ]  
 
Proposed modifications to working document towards draft CPM text for WRC-19 agenda item 1.5     China (People's Republic of)   AI1.5   2018-06-26
[ 501 ]  
 
Proposal for updates to preliminary draft CPM text for WRC-19 agenda item 7, issue A     China (People's Republic of)   AI7   2018-06-26
[ 500 ]  
 
Views and proposals on the studies of the WRC-19 agenda item 9.1 Issue 9.1.2     China (People's Republic of)   AI9.1   2018-06-26
[ 499 ]  
 
Proposed modifications to preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - Sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9     China (People's Republic of)   AI9.1   2018-06-26
[ 498 ]  
 
Proposed modifications to working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.9     China (People's Republic of)   AI9.1   2018-06-26
[ 497 ]  
 
Proposed updates to preliminary draft CPM text for WRC-19 agenda item 1.6     China (People's Republic of)   AI1.6   2018-06-26
[ 496 ]  
 
Proposed modifications to working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz     China (People's Republic of)   AI1.5   2018-06-26
[ 495 ]  
 
[DRAFT] working document - Simplified regulatory regime for non-GSO satellites with short duration mission     South Africa (Republic of) , Netherlands (Kingdom of the) , Rwanda (Republic of) , Zimbabwe (Republic of)     2018-06-26
[ 494 ]  
 
Revisions to working document on WRC-19 agenda item 1.5 - Operation of Earth Stations in Motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz     Institute of Electrical and Electronics Engineers, Inc.     2018-06-26
[ 493 ]  
 
Proposals regarding WRC-19 agenda item 7, issue K - Difficulties for part B examinations under 4.1.12 or 4.2.16 of RR Appendices 30 and 30A and 6.21 C of RR Appendix 30 B     Asia Satellite Telecommunications Co. Ltd. (AsiaSat)     2018-06-26
[ 492 ]  
 
Proposed updates to preliminary draft CPM text for WRC-19 agenda item 1.6     United States of America   AI1.6   2018-06-26
[ 491 ]  
 
Sharing study relating (I/N) to spectral efficiency of satellite networks using adaptive coding and modulation (ACM)     Canada     2018-06-25
[ 490 ]  
 
Update to EESS compatibility study in the 50 GHz range under agenda item 1.6     Canada   AI1.6   2018-06-25
[ 489 ]  
 
Revision to sharing study between GSO and non-GSO FSS systems in the 50/40 GHz bands     Canada   AI1.6   2018-06-25
[ 488 ]  
 
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue I     Canada     2018-06-25
[ 487 ]  
 
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue A     Canada   AI7   2018-06-25
[ 486 ]  
 
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue H     Canada   AI7   2018-06-25
[ 485 ]  
 
Elements for the preliminary draft CPM text for WRC-19 agenda item 1.6     Canada   AI1.6   2018-06-26
[ 484 ]  
 
Establishment of Correspondence Group for review of V-band GSO reference links - WRC-19 agenda item 1.6     Canada   AI1.6   2018-06-26
[ 483 ]  
 
Revisions for the draft CPM text for WRC-19 agenda item 9.1, issue 9.1.9     Canada   AI9.1   2018-06-25
[ 482 ]  
 
Revisions for the draft CPM text for WRC-19 agenda item1.5     Canada   AI1.5   2018-06-25
[ 481 ]  
 
FSS protection criteria to be used in studies for WRC-19 agenda items 1.13 and 1.14 for bands between 24.25 and 86 GHz     Brazil (Federative Republic of)     2018-06-25
[ 480 ]  
 
Proposed executive sumary for the working document towards draft CPM text for WRC-19 agenda item 7 - Issue I     Brazil (Federative Republic of)   AI7   2018-06-25
[ 479 ]  
 
Proposed executive sumary for the working document towards draft CPM text for WRC-19 agenda item 7 - Issue H     Brazil (Federative Republic of)   AI7   2018-06-25
[ 478 ]  
 
Proposed executive sumary for the working document towards draft CPM text for WRC-19 agenda item 1.5     Brazil (Federative Republic of)   AI1.5   2018-06-25
[ 477 ]  
 
Comments on Annex 17 to Working Party 4A Chairman's Report - Studies relating to the bringing into use of frequency assignments for all non-GSO satellite systems, and consideration of a milestone-based deployment approach fornon-GSO satellite systems in specific bands and services     Iran (Islamic Republic of)   AI7   2018-06-25
[ 476 ]  
 
Comments on Annex 33 to Working Party 4A Chairman's Report - Preliminary draft CPM text or WRC-19 agenda item 7 - Issue A     Iran (Islamic Republic of)     2018-06-25
[ 475 ]  
 
Criteria for the protection of fixed and broadcasting satellite services in studies under WRC-19 agenda items 1.13, 1.14 and 1.16     United Arab Emirates     2018-06-25
[ 474 ]  
 
Proposed changes to example ESIM Resolution of Annex 29 Document 4A/675 Working Party 4A Chairman's Report - Working document toward draft CPM text for WRC-19 agenda item 1.5     Australia   AI1.5   2018-06-25
[ 473 ]  
 
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue A     Indonesia (Republic of)   AI7   2018-06-25
[ 472 ]  
 
Proposed modifications on working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.3     Indonesia (Republic of)     2018-06-25
[ 471 ]  
 
Modifications to preliminaryd draft CPM text for WRC-19 agenda item 7 - Issue C (Issue C4)     Korea (Republic of)   AI7   2018-06-25
[ 470 ]  
 
Modifications to preliminary draft CPM text for WRC-19 agenda item 7 - Issue C (Issue C7)     Korea (Republic of)   AI7   2018-06-25
[ 469 ]  
 
Modifications to working document towards draft CPM text for WRC-19 agenda item 7 - Issue M     Korea (Republic of)   AI7   2018-06-25
[ 468 ]  
 
Modifications to working document towards draft CPM text for WRC-19 agenda item 7 - Issue N     Korea (Republic of)   AI7   2018-06-25
[ 467 ]  
 
Proposed modification to working document towards draft CPM text for WRC-19 agenda item 1.5     Korea (Republic of) , New Zealand     2018-06-25
[ 466 ]  
 
Proposals for modification of preliminary draft CPM text for WRC-19 agenda item 7 - issue H     Russian Federation   AI7   2018-06-22
[ 465 ]  
 
Compatibility studies between FSS in the 51.4-52.4 GHz band (Earth-to-space) and EESS (passive) in the 52.6-53 GHz band     Russian Federation   AI9.1   2018-06-22
[ 464 ]  
 
Proposals on WRC-19 agenda item 1.4 in relation draft CPM text     Russian Federation   AI1.4   2018-06-22
[ 463 ]  
 
Proposed revisions to the working document towards preliminary draft CPM text for WRC-19 agenda item 1.6     Russian Federation     2018-06-22
[ 462 ]  
 
Proposed amendments to example Resolution [AI 1.5/XXX] for WRC-19 agenda item 1.5     Russian Federation   AI1.5   2018-06-22
[ 461 ]  
 
Review of draft CPM text on WRC-19 agenda item 1.4     Papua New Guinea     2018-06-20
[ 460 ]  
 
Discussion on the limit for provisional entry in the Region 1 and 3 lists of Appendixes 30 and 30A related to WRC-19 agenda item 7 - Issue G, Method B     Bulgaria (Republic of)     2018-06-19
[ 459 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MSS in the frequency band 27.5-29.5 GHz     Japan   AI1.5   2018-06-18
[ 458 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz     Japan   AI1.5   2018-06-18
[ 457 ]  
 
Proposed modifications to working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2     Japan   AI9.1   2018-06-18
[ 456 ]  
 
Proposed modifications to working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY]     Japan   AI9.1   2018-06-18
[ 455 ]  
 
Considerations on the PFD and EPM criteria relating to WRC-19 agenda item 7, issue G - Updating the reference situation for Region 1 and 3 networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments     Japan   AI7   2018-06-18
[ 454 ]  
 
Proposed working document towards draft CPM text - WRC-19 agenda item 7 - issue M (Working Party 4A/ Working Party 4C)     Iran (Islamic Republic of)     2018-06-11
[ 453 ]  
 
Draft CPM text for WRC-19 agenda item 1.4 - Agenda item 1.4     Spain   AI1.4   2018-05-30
Results:601 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2019-06-21