Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 366 ]
|
Liaison statement on the new version of the Access Network Transport (ANT) - Standards Overview and Work Plan
|
ITU-T SG 15
|
|
2018-10-24 |
|
[ 365 ]
|
Liaison statement on the new version of the Home Network Transport (HNT) - Standards Overview and Work Plan
|
ITU-T SG 15
|
|
2018-10-24 |
|
[ 364 ]
|
Liaison statement to Working Parties 1A and 1B on protection of sound broadcasting receivers from WPT systems
|
WP 6A
|
Q210/1, AI9.1
|
2018-10-24 |
|
[ 363 ]
|
Reply liaison statement to ITU-R Working Pary 1A (copy for information to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart grid utility management systems
|
WP 5D
|
|
2018-10-23 |
|
[ 362 ]
|
Reply liaison statement on revision of Reocmmendation ITU-R SM.329 (reply to ITU-R Wroking Parties 1A and 5D) - Unwanted emissions in the spurious domain
|
ITU-T SG 5
|
|
2018-10-19 |
|
[ 361 ]
|
Liaison statement on EMC standards and limits - Further reports of disturbances to radiocommunication systems
|
ITU-T SG 5
|
|
2018-10-17 |
|
[ 360 ]
(Rev.1) |
Liaison statement on operation of short-range radiocommunication public access system supporting hearing aid systems
|
European Telecommunications Standards Institute
|
|
2018-10-10 |
|
[ 359 ]
|
Liaison statement on ITU inter-Sector coordinaton: ITU-R Working Parties 1A, 1B, and 1C versus ITU-T Questions
|
ITU-T SG 5
|
|
2018-10-10 |
|
[ 358 ]
|
Liaison statement on work being carried out under study in ITU-T Question 3/5
|
ITU-T SG 5
|
|
2018-10-01 |
|
[ 357 ]
|
Liaison statement to Working Party 1A (copy to Working Parties 1B, 5B, 5C, 6A and 7D for information) - Preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems
|
WP 7A
|
|
2018-09-28 |
|
[ 356 ]
|
Reply liaison statement to Working Party 1B (copy to Working Party 1A, for information) - Protection criteria for SFTS in relation to WRC-19 agenda item 9.1, issue 9.1.6
|
WP 7A
|
AI9.1
|
2018-09-28 |
|
[ 355 ]
|
Liaison statement to Working Party 1A - Countering interference from broadcasting-satellite receiving equipment into EESS (passive) remote sensors
|
WP 7C
|
|
2018-09-28 |
|
[ 354 ]
|
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 7B) - System parameter tables in Recommendation ITU-R SM.1448
and Appendix 7 (Rev.WRC-15) of the Radio Regulations
|
WP 7C
|
|
2018-09-28 |
|
[ 353 ]
|
Liaison statement on G.fast PSD boost for underground networks
|
ITU-T SG 15
|
|
2018-09-05 |
|
[ 352 ]
|
Working Party 1C for action - ITU Intersectoral response to ICNIRP - Public consultation of the draft ICNIRP guidelines on limiting EMF exposure (100 kHz to 300 GHz)
|
ATDI
,
ORANGE POLSKA S.A.
|
Q239/1
|
2018-08-02 |
|
[ 351 ]
|
Liaison statement on ITU Inter-Sector coordination
|
ITU-R SG11
|
|
2018-08-03 |
|
[ 350 ]
|
Response on liaison statement from the ITU-R on 'EMI standards for LED lighting'
|
International Special Committee on Radio Interference
|
|
2018-07-24 |
|
[ 349 ]
|
CISPR response to ITU-R WP 1A liaison statement Document 1A/TEMP/133
|
International Special Committee on Radio Interference
|
|
2018-07-24 |
|
[ 348 ]
|
Liaison statement to Working Parties 1A and 1C - Definition of and test methods for OTA unwanted emission of IMT radio equipment
|
WP 5D
|
|
2018-07-11 |
|
[ 347 ]
|
Liaison statement on new terms and definitions in ITU-T Study Group 20 work
|
SCV
|
|
2018-07-09 |
|
[ 346 ]
|
Liaison statement to Working Party 1A (copy for information to Working Parties 1C, 4A and 7C) - Countering interference from broadcasting-satellite receiving equipment into EESS (passive) remote sensors
|
WP 4B
|
|
2018-07-06 |
|
[ 345 ]
|
Liaison statement to Working Parties 1A, 5A, 5B and 6A (copy to Working Party 1B for information) - Preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz]
|
WP 3L
|
|
2018-07-02 |
|
[ 344 ]
|
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A,
5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448
and Appendix 7 (Rev.WRC-15) of the Radio Regulations
|
WP 4C
|
|
2018-07-02 |
|
[ 343 ]
|
Reply liaison statement to Working Party 6A (copy to Working Parties 1A, 5B and 7A) - Draft CPM text on WRC-19 agenda item 9.1, Issue 9.1.6
|
WP 1B
|
AI9.1
|
2018-06-28 |
|
[ 342 ]
|
Reply liaison statement to ITU-R Working Party 1A on determination of Amendment 1 to Recommendation ITU-T G.9700 (2014)
|
WP 5B
|
|
2018-06-20 |
|
[ 341 ]
|
Reply liaison statement to Working Parties 5D and 1A (copy to Study Group 1) - Unwanted emissions of IMT-2020 systems utilizing active antenna systems and total radiated power
|
WP 1C
|
|
2018-06-12 |
|
[ 340 ]
+Ann.1-14 |
Report on the fifth 2015-2019 meeting of Working Party 1A (Geneva, 4-12 June 2018)
|
Chairman, WP 1A
|
|
2018-06-12 |
|
[ 339 ]
|
Final list of participants Working Party 1A (Geneva, 4-12 June 2018)
|
Director, BR
|
|
2018-06-12 |
|
[ 338 ]
|
Document brought to the attention of Working Party 1A
|
Chairman, WP 1A
|
|
2018-06-04 |
|
[ 337 ]
|
Liaison statement on considerations of EMC/EMI in relation to IMT
|
ITU-T SG 5
|
|
2018-06-04 |
|
[ 336 ]
|
Liaison statement on EMC standards and limits for multi-media equipment to CISPR and ITU-T Study Group 5
|
ITU-T SG 5
|
|
2018-06-04 |
|
[ 335 ]
|
List of documents issued (Documents 1A/260 - 1A/335)
|
BR Study Groups Department
|
|
2018-06-04 |
|
[ 334 ]
|
Report on CISPR activities from June to November 2017 - Including updated information for the period from November 2017 to May 2018
|
Rapporteur, SG 1 RG on Liaison with CISPR
,
Rapporteur to CISPR on WPT issues
|
|
2018-06-01 |
|
[ 333 ]
|
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 3L, 5B and 6A) - Applicability of Recommendation ITU-R M.1732 for use in studies undertaken in working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz]
|
WP 5A
|
|
2018-05-31 |
|
[ 332 ]
|
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 3L and 6A) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5 kHz]
|
WP 5A
|
|
2018-05-31 |
|
[ 331 ]
|
Reply liaison statement to Working Parties 1A and 4C (copy for information to Working Parties 4A, 5D, 7B, and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations
|
WPs 5A, 5B, 5C
|
|
2018-05-31 |
|
[ 330 ]
|
Reply liaison statement to ITU-R Working Party 1A on preparations for WRC-19 agenda item 1.15 and the working document towards a preliminary draft new Report ITU-R SM.[275-450GHz_SHARING] (copy to Working Party 5A for information) - Input as related to WRC-19 agenda item 1.15 - Sharing and compatibility studies between land-mobile, fixed and passive services in the frequency ...
|
WP 5C
|
AI1.15
|
2018-05-31 |
|
[ 329 ]
|
Liaison statement to subcommittees H and F of the International Special Committee on radio interference and the International Electrotechnical Commission TC8
|
WP 5B
|
|
2018-05-30 |
|
[ 328 ]
|
Reply liaison statement to Working Party 1A (copy to Working Parties 1B, 3L, 5A, and 6A) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5 kHz]
|
WP 5B
|
|
2018-05-30 |
|
[ 327 ]
|
Recent developments concerning coexistence of wired telecommunication with radiocommunication systems
|
Rapporteur, RG wired and radio
|
Q236, Q221
|
2018-05-28 |
|
[ 326 ]
|
Proposed amendments to the working document towards draft CPM text for WRC-19 agenda item 1.15
|
Canada
|
AI1.15
|
2018-05-28 |
|
[ 325 ]
|
Proposed modifications to working document towards a preliminary draft new Report ITU-R SM.[275-450GHz_SHARING]
|
Canada
|
AI1.15
|
2018-05-28 |
|
[ 324 ]
|
Proposed modifications to working document towards a preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems
|
European Broadcasting Union
|
|
2018-05-28 |
|
[ 323 ]
|
Proposed revisions to working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM] (Contribution to ITU-R Working Party 1B with copy to Working Party 1A) - [Methodology for spectrum management of wireless power transmission (WPT)]
|
European Broadcasting Union
|
|
2018-05-28 |
|
[ 322 ]
|
This document has been withdrawn
|
Germany (Federal Republic of)
|
AI9.1
|
2018-05-28 |
|
[ 321 ]
|
Proposed draft new Report ITU-R SM.[275-450GHZ_SHARING] - Sharing and compatibility studies between land-mobile, fixed and passive services in the frequency range 275-450 GHz
|
Japan
|
AI1.15
|
2018-05-28 |
|
[ 320 ]
|
Proposed draft CPM text or WRC-19 agenda item 1.15
|
Japan
|
AI1.15
|
2018-05-28 |
|
[ 319 ]
|
Working document towards a preliminary draft new Report ITU-R SM.[WPT.WIDE-BEAM.IMPACTS] - Impact study and human hazard issues for Wireless Power Transmission via radio frequency wide-beam
|
Japan
|
Q210/1
|
2018-05-28 |
|
[ 318 ]
|
Proposed revision of preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]
|
Japan
|
Q210/1, AI9.1
|
2018-05-28 |
|
[ 317 ]
|
Proposal on preliminary draft revision of Recommendation ITU-R SM.2110-0
|
Japan
|
Q210/1, AI9.1
|
2018-05-28 |
Results:466 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):