International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:159 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
Contributions  [ Source: United States of America ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 288 ]  
 
Working document towards a preliminary draft new Report on the intent and application of Recommendation ITU-R S.1432-1     United States of America     2013-09-20
[ 287 ]  
 
Working document towards text for the draft Report to the Conference Preparatory Meeting (CPM) on WRC-15 agenda item 1.7     United States of America     2013-09-20
[ 286 ]  
 
Further thoughts on simplification of radio regulation regime on space services - WRC-15 agenda item 7     United States of America     2013-09-20
[ 285 ]  
 
Draft CPM Text on WRC-12 agenda item 7 - Modifications to No. 11.49     United States of America     2013-09-20
[ 284 ]  
 
New databank items - Addition of USASAT-70O and USASAT-71L technical characteristics to the electronic databank     United States of America     2013-09-20
[ 283 ]  
 
Preliminary draft new Report ITU-R S.[BROADBAND BY FSS] - Broadband access by fixed-satellite service systems     United States of America     2013-09-20
[ 282 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[FSS 7/8 GHz Compatibility] - Compatibility studies between the fixed-satellite service and the terrestrial and other space services in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space)     United States of America     2013-09-20
[ 281 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3     United States of America     2013-09-20
[ 222 ]  
 
Working document on guidelines that could be used by Administrations wishing to license ESOMPs mounted on vessels and operating in NGSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services     United States of America     2013-04-25
[ 221 ]  
 
Working document on the guidelines that could be used by Administrations wishing to license airborne ESOMPs operating in NGSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services     United States of America     2013-04-25
[ 220 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R S.[GSO FSS E/S IN 29.5-30.0/19.7-20.2 GHz] - Technical and operational requirements for earth stations on mobile platforms operating with geostationary FSS satellite networks in the bands 19.7-20.2 GHz and 29.5 - 30.0 GHz     United States of America     2013-04-25
[ 219 ]  
 
Working document - Technical and operational studies towards the preparation of a preliminary draft new Report regarding earth stations on mobile platforms in the 17.3-19.7 and 27.5-29.5 GHz bands of the geostationary satellite orbit fixed-satellite service     United States of America     2013-04-25
[ 218 ]  
 
Feasibility of FSS/AMS/Mobile sharing in the frequency band 14.5-15.35 GHz     United States of America     2013-04-25
[ 209 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3     United States of America     2013-04-24
[ 208 ]  
 
Working document towards text for the draft Report to the Conference Preparatory Meeting (CPM) on WRC-15 Agenda Item 1.7     United States of America     2013-04-24
[ 207 ]  
 
Liaison statement to Working Party 5B - Preliminary draft new Report ITU-R M.[UAS-PERF-AND-REQ] - WRC Agenda item 1.5 WD PDNR [UAS-FSS] FSS assumptions and characteristics     United States of America     2013-04-24
[ 206 ]  
 
Modifications to Recommendation ITU-R S.1503-1     United States of America     2013-04-24
[ 205 ]  
 
Draft liaison statement to Working Party 5D - Compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments     United States of America     2013-04-24
[ 204 ]  
 
Working document towards a preliminary draft new Recommendation on a possible methodology for frequency sharing between fixed-satellite service networks comprising ubiquitously deployed earth stations and terrestrial services in adjacent areas     United States of America     2013-04-24
[ 203 ]  
 
Interference effect of transmissions from earth stations on board vessels operating in fixed-satellite service networks on co-frequency stations     United States of America     2013-04-24
[ 202 ]  
 
Further discussions on the Working Document towards a Preliminary Draft New Recommendation ITU-R S.[ALT.RAD.PTTRN]     United States of America     2013-04-24
[ 201 ]  
 
Working document - Draft CPM text related to Agenda item 9.1.2 -Size of the coordination arc for triggering coordination under RR No.9.7 between geostationary-satellite networks     United States of America     2013-04-24
[ 200 ]  
 
Working Document addressing consequences for late notification under RR No.11.49     United States of America     2013-04-24
[ 199 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3     United States of America     2013-04-24
[ 198 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz range for the GSO fixed-satellite service in Region 1     United States of America     2013-04-24
[ 197 ]  
 
Working document on a framework for a Preliminary Draft New Recommendation for control and non-payload communication (CNPC) links of unmanned aircraft systems (UAS) in non- segregated airspace     United States of America     2013-04-24
[ 196 ]  
 
Liaison statement to Working Party 5B - Clarification of BR comment on FSS assignments - WRC-15 Agenda item 1.5     United States of America     2013-04-24
[ 195 ]  
 
Proposed updates to working document towards a preliminary draft new Report ITU-R S.[FSS 7/8 GHz compatibility] - Compatibility studies between the fixed-satellite service and the terrestrial and other space services in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space)     United States of America     2013-04-24
[ 194 ]  
 
Agenda Item 1.6 FSS deployment model     United States of America     2013-04-24
[ 106 ]  
 
Working document towards a preliminary draft new Recommendation on the use of earth stations on mobile platforms operating with GSO FSS networks in bands within the frequency ranges 20/30 GHz     United States of America   70-1/4   2012-09-11
[ 105 ]  
 
Initial evaluation of the applicability of the value of 6% ?T/T for triggering coordination between geostationary fixed-satellite service networks     United States of America     2012-09-11
[ 104 ]  
 
Working document - Information related to Agenda item 9.1.2 - Size of the coordination arc for triggering coordination under RR No. 9.7     United States of America     2012-09-11
[ 103 ]  
 
Preliminary draft new Report ITU-R S.[ESV] on the interference effect of transmissions from earth stations on board vessels operating in fixed-satellite service networks on co-frequency stations     United States of America     2012-09-11
[ 102 ]  
 
Draft new Report on the technical and operational requirements for earth stations on mobile platforms operating in non-GSO FSS systems in the frequency bands from 17.3 to 19.3, 19.7 to 20.2, 27 to 29.1 and 29.5 to 30.0 GHz     United States of America   70-1/4   2012-09-11
[ 101 ]  
 
Comments on the development of the epfd software     United States of America     2012-09-11
[ 100 ]  
 
Expansion of working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the fixed-satellite service in Regions 2 and 3 (GSO)     United States of America     2012-09-11
[ 99 ]  
 
Expansion of working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the fixed-satellite service in Region 1 (GSO)     United States of America     2012-09-11
[ 98 ]  
 
Draft outline and preliminary material for the draft CPM Report to WRC-15 for Agenda items 1.6.1 and 1.6.2 in Chapter 4, Satellite services - Sub-Chapter 4.1, Fixed-satellite service, Agenda item 1.6     United States of America     2012-09-11
[ 78 ]  
 
Draft Liaison statement to Working Party 5B -Characteristics of FSS Coordination     United States of America     2012-08-30
[ 77 ]  
 
Draft liaison statement to ITU-R Working Party 5B - WRC-15 Agenda item 1.7     United States of America     2012-08-30
[ 76 ]  
 
Preliminary outline for draft CPM text on WRC-15 Agenda item 1.8     United States of America     2012-08-30
[ 75 ]  
 
Working document towards a preliminary draft new Recommendation on alternative off-axis radiation patterns for earth station antennas     United States of America     2012-08-30
[ 74 ]  
 
Draft new Recommendation ITU-R S.[TIME_VAR_SMALL_E/S] - Statistical methodology to assess time-varying interference produced by a network of small earth stations operating with TDMA schemes onto geostationary fixed-satellite service networks     United States of America   208/4   2012-08-30
[ 73 ]  
 
Draft revision of Recommendation ITU-R S.732 - Method for statistical processing of earth-station antenna side-lobe peaks     United States of America     2012-08-30
[ 72 ]  
 
Preliminary results for feasibility of FSS/SRS (deep-space) sharing in the frequency bands 7150-7190 MHz and 8400-8450 MHz     United States of America     2012-08-30
[ 71 ]  
 
Assessment of Interference Potential between Proposed FSS and Existing SRS (s-E) Allocations in the 8 GHz Band     United States of America     2012-08-30
[ 39 ]  
 
Proposed draft liaison statement to JTG 4-5-6-7 on WRC-15 Agenda item 1.1     United States of America     2012-05-22
[ 38 ]  
 
Working document on information related to WRC-15 agenda items 1.6.1/1.6.2: Receiver characteristics of EESS (active) in the 13.25-13.75 GHz band     United States of America     2012-05-22
[ 37 ]  
 
Working Document towards a Preliminary Draft New Report on the interference effect of transmissions from earth stations on board vessels operating in fixed-satellite service networks on fixed service stations     United States of America     2012-05-22
[ 36 ]  
 
Working document on issues related to earth stations on mobile platforms operating in geostationary fixed-satellite service networks in the 17.3 to 30.0 GHz band     United States of America     2012-05-22
Results:159 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-9-21