Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 32 ]
(Rev.2) |
Draft new Report ITU-R SA.[SPECTRUM REQ] - Spectrum requirements for future EESS missions operating under a potential new EESS uplink allocation in the 7/8 GHz range
|
WP 7B
|
|
2013-04-15 |
|
[ 31 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SA.1155 - Protection criteria related to the operation of data relay satellite systems
|
WP 7B
|
|
2013-04-15 |
|
[ 30 ]
(Rev.2) |
Draft new Report ITU-R SA.[PROX OPS] - Sharing conditions between space research service proximity operations links and fixed and mobile service links in the 410-420 MHz band
|
WP 7B
|
|
2013-04-15 |
|
[ 29 ]
|
Draft revision of Recommendation ITU-R SA.1414 - Characteristics of data relay satellite systems
|
WP 7B
|
|
2013-04-15 |
|
[ 28 ]
(Rev.2) |
Draft revision of Report ITU-R RS.2068 - Current and future use of the band 13.25-13.75 GHz by spaceborne active sensors
|
WP 7C
|
|
2013-04-11 |
|
[ 27 ]
|
Liaison statement to Study Groups 4, 5, 6 and 7 and Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D as concerned Groups for WRC-15 Agenda item 1.1 - Preparations for WRC-15 Agenda item 1.1 - Technical and operational characteristics
|
JTG 4-5-6-7
|
|
2012-12-06 |
|
[ 26 ]
|
Liaison statement to ITU-R Study Groups 1, 3, 4, 5, 6 and 7 - ITU-R Study Groups Vocabulary Work
|
CCV
|
|
2012-11-16 |
|
[ 25 ]
|
Liaison statement from ITU-D Study Group 1 - Invitation to participate in and provide input to the work of the Correspondence Group on the Elaboration of a Working Definition of the Term "ICT"
|
ITU-D SG 1
|
|
2012-10-24 |
|
[ 24 ]
|
Draft Revision of Recommendation ITU-R RA.1417 - A radio-quiet zone in the vicinity of the L2 Sun-Earth Lagrange point
|
SG 7D
|
147/7
|
2012-10-10 |
|
[ 23 ]
|
Draft new Recommendation ITU-R SA.[EES/METSAT USAGE 401-403 MHz] - Basic general partitioning and sharing conditions for the band 401-403 MHz for future long-term coordinated use of data collection systems on geostationary and non-geostationary METSAT and EESS systems
|
WP 7B
|
|
2012-10-05 |
|
[ 22 ]
|
Draft new Recommendation ITU-R SA.[EES/MET DCS INTERF] - Protection criteria for non-GSO data collection platforms in the band 401-403 MHz
|
WP 7B
|
|
2012-10-05 |
|
[ 21 ]
|
Draft revision of Recommendation ITU-R SA.509-2 - Space research earth station and radio astronomy reference antenna radiation pattern for use in interference calculations, including coordination procedures, for frequencies less than 30 GHz
|
WP 7B
|
|
2012-10-05 |
|
[ 20 ]
|
Summary report of actions taken during the meeting of Radiocommunication Study Group 7
|
Chairman, SG 7
|
|
2012-05-24 |
|
[ 19 ]
|
Final List of Participants - Study Group 7 (Geneva, 8-9 May 2012)
|
Director, BR
|
|
2012-05-09 |
|
[ 18 ]
|
List of documents issued
|
BR Study Groups Department
|
|
2012-05-07 |
|
[ 17 ]
|
Review of the Questions assigned by the Radiocommunication Assembly (RA-12) to Study Group 7
|
Chairman, SG 7
|
|
2012-05-02 |
|
[ 16 ]
|
Proposed modifications to draft new Report ITU-R RS.[31.5 GHz SHARE] on sharing studies between EESS (passive) and fixed service in the band 31.5-31.8GHz
|
United Kingdom of Great Britain and Northern Ireland
|
232/7
|
2012-05-01 |
|
[ 15 ]
|
Executive Report of Working Party 7A
|
Chairman, WP 7A
|
|
2012-05-01 |
|
[ 14 ]
|
Executive report on the September 2011 meeting of Working Party 7D
|
Chairman, WP 7D
|
|
2012-04-29 |
|
[ 13 ]
|
Studies on the feasibility of achieving a continuous reference time-scale and related activities (WRC-15 Agenda item 1.14)
|
Russian Federation
|
|
2012-04-27 |
|
[ 12 ]
|
Results of WRC-12 - Science services issues
|
Chairman, SG 7
|
|
2012-04-30 |
|
[ 11 ]
|
Results of CPM15-1 - Science services issues
|
Chairman, SG 7
|
|
2012-04-30 |
|
[ 10 ]
|
Results of the Radiocommunication Assembly 2012
|
Chairman, SG 7
|
|
2012-04-30 |
|
[ 9 ]
|
Report on the September 2011 meeting of Working Party 7B with a view to its next meeting (September 2012)
|
Chairman, WP 7B
|
|
2012-04-26 |
|
[ 8 ]
|
Report on the status of Study Group 7 ITU-R Recommendations
|
Vice-Chairman, SG 7
|
|
2012-04-26 |
|
[ 7 ]
|
Report on the status of Study Group 7 Handbooks
|
Vice-Chairman, SG 7
|
|
2012-04-24 |
|
[ 6 ]
|
Executive report on the September 2011 meeting of Working Party 7C
|
Chairman, WP 7C
|
|
2012-04-24 |
|
[ 5 ]
|
Information for studies related to WRC-15 Agenda item 1.1
|
United States of America
|
|
2012-04-23 |
|
[ 4 ]
|
Liaison statement to Study Groups 4, 5, 6 and 7, and Working Parties 4A, 4B, 4C, 5A, 5B, 5C 5D, 6A, 7B, 7C and 7D - Preparations for WRC-15 Agenda items 1.1 and 1.2 in response to decisions of CPM15-1
|
Chairman, JTG 4-5-6-7
|
|
2012-03-26 |
|
[ 3 ]
|
Draft new Recommendation ITU-R TF.[TIME_TRANSFER] - Relativistic time transfer in the vicinity of the Earth and in the solar system
|
WP 7A
|
253/7
|
2012-02-01 |
|
[ 2 ]
|
Documents to be carried over from the 2007-2011 study period
|
SG 7
|
|
2012-02-01 |
|
[ 1 ]
(Rev.1-3) |
Questions assigned to Radiocommunication Study Group 7
|
SG 7
|
|
2012-02-01 |
Results:132 total items. Result page:
Previous -
1 -
2 -
3
|
Multiple Document Download: Formats and Languages to be included (when available):