| Temporary Documents
	          (WP2)  | 
| 
 | Number 
 | Title | Source | AI/Question 
 | Date | 
|  | [ 143-WP2 ] 
 | Draft Questionnaire on "the requirements of low-cost optical cable backhaul solution toward realistically closing the digital divide in a timely manner" | Rapporteur Q16/15 | Q16/15 | 2014-12-03 | 
|  | [ 142-WP2 ] 
 | LS/o on transfer of Recommendation ITU-T L.71 and Handbook "Compendium of Cable Measurement Methods, 1984" (to ITU-T SG5) | Rapporteur Q16/15 | Q16/15 | 2014-12-03 | 
|  | [ 141-WP2 ] (Rev.1)
 | LS/o on draft revised ITU-T Recommendations for Consent at ITU-T (to IEC SC86A WG3) | Rapporteur Q16/15 | Q16/15 | 2014-12-03 | 
|  | [ 140-WP2 ] (Rev.1)
 | LS/o on revision considerations for Recommendation ITU-T L.60, "Construction of optical/metallic hybrid cables" (to IEC SC86A WG3) | Rapporteur Q16/15 | Q16/15 | 2014-12-03 | 
|  | [ 139-WP2 ] (Rev.1)
 | LS/o on revision considerations for Recommendation ITU-T L.59, "Optical fibre cables for indoor applications" (to IEC SC86A WG3) | Rapporteur Q16/15 | Q16/15 | 2014-12-03 | 
|  | [ 138-WP2 ] (Rev.1)
 | Plan for the revision of the ITU-T Handbook "Optical Fibres, Cables and Systems" | Chairman WP2/15 | Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 | 2014-12-03 | 
|  | [ 137-WP2 ] 
 | Plan for harmonization of Recommendations ITU-T L.10, L.26 and L.43 with IEC in view of consent at next ITU-T SG15 meeting (22 June - 3 July 2015) | Chairman WP2/15 | Q16/15 | 2014-12-03 | 
|  | [ 136-WP2 ] 
 | LS/o on field installable/mountable connectors (reply to IEC-TC86-SC86B-LS002) [to IEC SC86B] | Rapporteur Q7/15 | Q7/15 | 2014-12-02 | 
|  | [ 135-WP2 ] 
 | Draft revised Recommendation ITU-T G.671 (latest draft with Editor's comments) | Editor G.671 | Q7/15 | 2014-11-28 | 
|  | [ 134-WP2 ] 
 | L.fmc: Correspondence summary (September - November 2014) | Editor L.fmc | Q7/15 | 2014-11-27 | 
|  | [ 133-WP2 ] 
 | L.36: Correspondence summary (April - November 2014) | Editor L.36 | Q7/15 | 2014-11-27 | 
|  | [ 132-WP2 ] (Rev.1)
 | LS/o/r on treatment about FG-DR&NRR deliverables (reply to SG2-LS056) [to ITU T SG2] | Rapporteur Q17/15 | Q17/15 | 2014-11-26 | 
|  | [ 131-WP2 ] 
 | Draft new Recommendation ITU-T L.dm-nrr-mdru (initial draft), "Disaster management for improving network resilience and recovery with movable and deployable ICT resource units" | Rapporteur Q17/15 | Q17/15 | 2014-11-26 | 
|  | [ 130-WP2 ] 
 | Draft new Recommendation ITU-T L.nrr-frm (initial draft), "Framework of disaster management for network resilience and recovery" | Rapporteur Q17/15 | Q17/15 | 2014-11-26 | 
|  | [ 129-WP2 ] 
 | Agenda of the joint Q5, 6/15 meeting (Geneva, 26 November 2014) | Rapporteurs Q5, 6/15 | Q6/15, Q5/15 | 2014-11-26 | 
|  | [ 128-WP2 ] 
 | Q8/15: Status report | Rapporteur Q8/15 | Q8/15 | 2014-11-24 | 
|  | [ 127-WP2 ] 
 | G.977: Correspondence summary | Editor G.977 | Q8/15 | 2014-11-24 | 
|  | [ 126-WP2 ] 
 | LS/i on performance testing for field installable/mountable connectors [from IEC SC86B] | IEC SC86B | Q7/15 | 2014-11-22 | 
|  | [ 125-WP2 ] 
 | G.698.3 v1.0.3: Proposed application parameters | Editor G.698.3 | Q6/15 | 2014-11-22 | 
|  | [ 124-WP2 ] 
 | Response to the questionnaire on "Plant solutions for FTTdp (fibre-to-the-distribution point) architecture" | Rapporteur Q16/15 | Q16/15 | 2014-11-21 | 
|  | [ 123-WP2 ] 
 | G.698.2: Overview of contributions proposing parameters and related test methods for 40G and 100G modulation formats in G.698.2 Version 0.9.03 | Editor G.698.2 | Q6/15 | 2014-11-21 | 
|  | [ 122-WP2 ] 
 | Draft revised Recommendation ITU-T G.697 (latest draft, v3.03) | Editor G.697 | Q6/15 | 2014-11-21 | 
|  | [ 121-WP2 ] 
 | Draft revised Recommendation ITU-T G.680 (latest draft, v1.0.6) | Editor G.680 | Q6/15 | 2014-11-21 | 
|  | [ 120-WP2 ] (Rev.1)
 | Draft revised ITU-T Handbook "Optical Fibres, Cables and Systems" | Chairman WP2/15 | Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 | 2014-11-20 | 
|  | [ 119-WP2 ] 
 | Draft revised ITU-T G-Suppl.39 (latest draft, v5.0.2) | Editor G-Suppl.39 | Q6/15 | 2014-11-20 | 
|  | [ 118-WP2 ] 
 | Draft new Recommendation ITU-T G.metro (latest draft) | Editor G.metro | Q6/15 | 2014-11-15 | 
|  | [ 117-WP2 ] 
 | L.53 (Rev): Correspondence summary | Editor L.53 | Q17/15 | 2014-11-13 | 
|  | [ 116-WP2 ] 
 | G.972: Living list | Editor G.972 | Q8/15 | 2014-11-11 | 
|  | [ 115-WP2 ] 
 | Proposed application parameters for G.959.1 version 6.0.2 | Editor G.959.1 | Q6/15 | 2014-11-11 | 
|  | [ 114-WP2 ] 
 | Draft revised Recommendation ITU-T G.959.1 (version 6.0.3) | Editor G.959.1 | Q6/15 | 2014-11-11 | 
|  | [ 113-WP2 ] 
 | G.664: Updated list of references due to availability of IEC 60825-1, Ed. 3.0 | Editor G.664 | Q6/15 | 2014-11-11 | 
|  | [ 112-WP2 ] 
 | G.695: Proposed application parameters (version 5.0.3) | G.695 | Q6/15 | 2014-11-11 | 
|  | [ 111-WP2 ] 
 | Draft new Recommendation ITU-T L.fmc (latest draft) | Editor L.fmc | Q7/15 | 2014-11-10 | 
|  | [ 110-WP2 ] 
 | Draft revised Recommendation ITU-T G.672 (version 1.0.2) | Editor G.672 | Q7/15 | 2014-11-10 | 
|  | [ 109-WP2 ] 
 | Withdrawn by submitter
 | N/A |  | 2014-11-10 | 
|  | [ 108-WP2 ] 
 | Response to the questionnaire on "Microducts technology and its application in the access network" | Rapporteur Q16/15 | Q16/15 | 2014-11-10 | 
|  | [ 107-WP2 ] 
 | Correspondence summary of the new study item regarding the node elements in optical fibre infrastructure management systems | Correspondence leaders | Q16/15 | 2014-11-10 | 
|  | [ 106-WP2 ] 
 | 100G application for submarine systems: Correspondence summary | Correspondence leader, 100G application for SCs | Q8/15 | 2014-11-10 | 
|  | [ 105-WP2 ] 
 | G.metro: Correspondence summary | G.metro Correspondence activity coordinator | Q6/15 | 2014-11-10 | 
|  | [ 104-WP2 ] 
 | G.652 and G.657: Correspondence activity (July 2014 to November 2014) | Editor G.652, G.657 | Q6/15, Q5/15 | 2014-11-10 | 
|  | [ 103-WP2 ] 
 | Revision plan for ITU-T L-series Recommendations and Q16/15 Handbooks | Rapporteur Q16/15 | Q16/15 | 2014-11-07 | 
|  | [ 102-WP2 ] 
 | Draft revised Recommendation ITU-T G.650.2 (latest draft) | Editor G.650.2 | Q5/15 | 2014-11-06 | 
|  | [ 101-WP2 ] (Rev.1)
 | Correspondence activity for revising ITU-T G.650.2, June to October 2014 | Editor G.650.2 | Q5/15 | 2014-11-05 | 
|  | [ 100-WP2 ] 
 | WP2/15 proposed interim activities (for Agreement, December 2014) | Chairman WP2/15 | Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 | 2014-11-03 | 
|  | [ 99-WP2 ] (Rev.1)
 | WP2/15 outgoing Liaison Statements (for Agreement, December 2014) | Chairman WP2/15 | Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 | 2014-11-03 | 
|  | [ 98-WP2 ] (Rev.1-4)
 | WP2/15 Work Programme updates (for Agreement, December 2014) | Chairman WP2/15 | Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 | 2014-11-03 | 
|  | [ 97-WP2 ] (Rev.1-2)
 | WP2/15 texts for Approval, Determination, Consent and Agreement (December 2014) | Chairman WP2/15 | Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 | 2014-11-03 | 
|  | [ 96-WP2 ] (Rev.1)
 | WP2/15 meeting report (Geneva, 24 November - 5 December 2014) | Chairman WP2/15 | Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 | 2014-11-03 | 
|  | [ 95-WP2 ] (Rev.1-2)
 | WP2/15 meeting agenda (Geneva, 24 November - 5 December 2014) | Chairman WP2/15 | Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 | 2014-11-03 | 
|  | [ 94-WP2 ] (Rev.1-2)
 | Report of the Q17/15 meeting (Geneva, November - December 2014) | Rapporteur Q17/15 | Q17/15 | 2014-11-03 | 
| Results:63 total items. Result page: 	
	1 -
	2
	   - Next
  
 | 
Multiple Document Download: Formats and Languages to be included (when available):