Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 450 ]
|
Question ITU-R 1-6/5 - Interference protection ratios and minimum field strengths required in the land mobile services
|
SG 5
|
|
2015-10-23 |
|
[ 449 ]
|
Recommendation ITU-R SM.1541-6 - Unwanted emissions in the out-of-band domain
|
SG 1
|
|
2015-10-12 |
|
[ 448 ]
|
Recommendation ITU-R F.758-6 - System parameters and considerations in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and systems in other services and other sources of interference
|
SG 5
|
|
2015-10-12 |
|
[ 447 ]
|
Liaison statement on real-time transmission of flight data in the context of global flight tracking
|
Chairman, ITU-T (FG AC)
|
|
2015-09-02 |
|
[ 446 ]
|
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Working document toward a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]
|
WP 5A
|
|
2015-08-26 |
|
[ 445 ]
|
Liaison statement to Working Parties 4A, 4C, 5B, 5C, 5D, 7B and 7D - On proposed revisions to Recommendation ITU-R M.1732
|
WP 5A
|
|
2015-08-26 |
|
[ 444 ]
|
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D (copy for information to ETSI ATTM TM4, CEPT ECC PT SE19) - Development of draft revision of Recommendation ITU-R F.758-5 and a draft new Recommendation ITU-R F.[FS DEPLOY] - Recommendations on sharing or commpatibility studies between the fixed service and systems in other services
|
WP 5C
|
|
2015-08-25 |
|
[ 443 ]
|
Reply liaison statement to ITU-T Focues Group on aviation applications of cloud computing for flight data monitoring (copy to Working Party 4A, 4C ITU Inter-Sector Coordination Team)
|
WP 5B
|
|
2015-07-23 |
|
[ 442 ]
|
Reply liaison statement to Working Party 4C - Global flight tracking for civil aviation
|
WP 5B
|
|
2015-07-23 |
|
[ 441 ]
|
Reply liaison statement to Working Party 4C, Study Group 4 and Study Group 5 (with information to Working Parties 3M, 4A, 4B, 5A, 5B, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10
|
WP 5C
|
|
2015-07-16 |
|
[ 440 ]
|
Liaison statement on radio frequency interference and co-existence between wired telecommunication and radiocommunication systems (reply to ITU-R WP 5B - 5B/TEMP/372)
|
ITU-T SG9
|
|
2015-07-14 |
|
[ 439 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 4C, 5A, 5B, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.8
|
WP 4A
|
|
2015-07-01 |
|
[ 438 ]
|
Liaison statement to Working Party 5B (copy for information to Working Parties 4B and 4C) - Comments on the working document towards a preliminary draft new Report ITU-R M.[UAS-FSS]
|
WP 4A
|
|
2015-07-01 |
|
[ 437 ]
|
Reply liaison statement to Study Group 5 (copy for information to Working Party 4B, 4C and 5D) - Coexistence issues between the satellite and terrestrial components of IMT and the proposed revision of Recommendation ITU-R M.1036-4
|
SG 4
|
|
2015-06-30 |
|
[ 436 ]
|
Liaison statement to Working Party 4C (copy for information to Study Groups 4 and 5 and Working Party 4B) - Coexistence issues between the satellite and terrestrial components of IMT and the proposed revision of Recommendation ITU-R M.1036-4
|
WP 5D
|
|
2015-06-22 |
|
[ 435 ]
+Ann.2-7 |
Report on the meeting of Working Party 4C (Geneva, 10-16 June 2015)
|
Chairman, WP 4C
|
|
2015-06-12 |
|
[ 434 ]
|
Final list of participants - Working Party 4C (10 - 16 June 2015)
|
Director, BR
|
|
2015-06-16 |
|
[ 433 ]
|
Liaison statement to ITU-T Study Group 5 (copy for information to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A, 7D and ITU-T Study Groups 9 and 15) - ITU-R interest in K-series Recommendations
|
WP 1A
|
|
2015-06-12 |
|
[ 432 ]
|
Liaison statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 4C, 5A, 5B, 5C, 5D, 6A and 7D) - Developments concerning co-existence issues
|
WP 1A
|
|
2015-06-12 |
|
[ 431 ]
|
Liaison statement to Working Party 3L (copy to ITU-R Working Parties 1C, 4C, 5A, 5B, 5C, 5D, 6A, and 7D and to ITU-T Study Groups 5, 9, and 15) - Evaluating the leakage and impact of radio frequency noise from telecommunication systems using metallic conductors
|
WP 1A
|
|
2015-06-12 |
|
[ 430 ]
|
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 7B and 7D - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities
|
WP 1B
|
|
2015-06-11 |
|
[ 429 ]
|
Reply to liaison statements from Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 6A - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED] - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems
|
WP 1A
|
|
2015-06-09 |
|
[ 428 ]
|
List of documents issued (Documents 4C/369 - 4C/428)
|
BR Study Groups Department
|
|
2015-06-09 |
|
[ 427 ]
|
Liaison statement on real-time transmission of flight data in the context of global flight tracking
|
Chairman, ITU-T FG AC
|
|
2015-06-08 |
|
[ 426 ]
|
Proposed revision to Annex 6 to Working Party 4C Chairman's Report - Preliminary draft new Report ITU-R M.[MMSS 7/8 GHZ SHARING] - Possible allocations to the maritime mobile-satellite service in the 7/8 GHz range
|
France
|
|
2015-06-03 |
Results:450 total items. Result page:
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):