International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1A  C 

ITU-R WP1A

Spectrum engineering techniques

Results:402 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 402 ]  
 
Liaison statement to ITU-R SG 1, WPs 1A, 1B, 5A and 5D regarding ITU-T G.9959 (ex-G.wnb), narrowband wireless home networking     ITU-T SG 15     2012-01-03
[ 401 ]  
 
Liaison to ITU-R Study Group 1 and Study Group 5 regarding G.wnb, narrowband wireless home networking     ITU-T SG 15     2011-11-23
[ 400 ]  
 
Liaison statement to ITU-T Study Group 15 regarding G.wnb, narrow-band wireless home networking (copy to ITU-R Study Group 1, Working Party 5D)     WP 5A     2011-11-22
[ 399 ]  
 
Liaison statement to Working Party 1A - Developments on PLT systems     WP 5B     2011-11-18
[ 398 ]  
 
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Draft revision of Recommendation ITU-R F.758-4     WP 5C     2011-11-16
[ 397 ]  
 
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Handbook on "Propagation information for the prediction of interference and coordination distance"     SG 3     2011-10-31
[ 396 ]  
 
Reply liaison statement to Working Party 1A (copy to Working Party 6A for information) - Question ITU-R 230-1/3 on "Prediction methods and models applicable to power line telecommunications systems"     SG 3   230-1/3   2011-10-31
[ 395 ]  
 
Liaison statement to ITU-T Study Group 15 regarding G.WNB, narrowband wireless home networking (copy to ITU-R Study Group 1, Working Party 5A)     WP 5D     2011-10-21
[ 394 ]  
 
Liaison statement to the Working Party 1A Rapporteur Group on PLT and to Working Party 1A - Further work on power line telecommunications - Observations on the recently approved texts, Recommendation ITU-R SM.1879-1 and Report ITU-R SM.2212, dealing with the impact of PLT on radiocommunication services     WP 6A     2011-10-19
[ 393 ]  
 
Liaison statement to Working Party 1A - Protection of digital broadcasting services against interference caused by radiation from industrial, scientific and medical (ISM) equipment     WP 6A     2011-10-19
[ 392 ]  
 
Liaison statement to Study Group 1 (copy to Working Party 1A for information) - A database for the protection of radio services     WP 6A     2011-10-19
[ 391 ]  
 
Liaison statement to Study Group 1 (for information to Study Group 7 and Working Parties 1A, 1B, 4A, 4C, 5B and 5C) - Definitions for adjacent channel leakage power ratio (ACLR) and adjacent channel selectivity (ACS)     WP 6A     2011-10-10
[ 390 ]  
 
Reply liaison to Study Group 1 - A database for the protection of radio services     WPs 7B, 7C and 7D     2011-10-05
[ 389 ]  
 
Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working Party 1A) - A database for the protection of radio services     WP 4A     2011-09-29
[ 388 ]  
 
Liaison statement to all JCA-IoT contacts on IoT standards roadmap     ITU-T JCA-IoT Convener     2011-09-23
[ 387 ]  
 
Liaison statement on the new project on ITU-T G.fast     ITU-T SG 15     2011-09-22
[ 386 ]  
 
Liaison statement to ITU-R Study Group 1 and Study Group 5 regarding G. wnb, narrowband wireless home networking     ITU-T SG 15     2011-09-22
[ 385 ]  
 
Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working Parties 1A, 4A) - A database for the protection of radio services     WP 4C     2011-09-21
[ 384 ]  
 
Liaison statement to ITU-T Study Group 15 on narrowband wireless home networking (copy to ITU-R Study Group 1 and Working Parties 1A, 1B and 5D for information)     WP 5A     2011-06-28
[ 383 ]  
 
Liaison statement to Study Group 1 and Working Party 1A (copy to Study Groups 4, 6 and 7) - A database for the protection of radio services     WPs 5A, 5B, 5C and 5D     2011-06-28
[ 382 ]  
 
Liaison statement to ITU-R Working Parties 1A, 1B, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Revisions of F-Series Recommendations on the interference criteria (Recommendations ITU-R F.758-4 and ITU-R F.1495-1)     WP 5C     2011-06-22
[ 381 ]  
 
ISO/IEC JTC 1/SC 31 - Automatic identification and data capture techniques     ISO     2011-06-16
[ 380 ]  
 
This document has been withdrawn     BR Study Group Department     2011-06-06
[ 379 ]  
+Ann.1-14 
Report of the meeting of Working Party 1A (Geneva, 25 May - 1 June 2011)     Chairman, WP 1A     2011-06-01
[ 378 ]  
 
Final List of Participants - Working Party 1A (Geneva, 25 May-1 June 2011)     Director, BR (w)     2011-06-01
Results:402 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2013-11-05