International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP9D : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP9D  C 

ITU-R WP9D

Sharing with other services (except for the fixed-satellite service)

Results:258 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 258 ]  
 
Recommendation to be brought to the attention of Working Parties 9C and 9D     BR, Study Group Dpt.     2007-08-09
[ 257 ]  
 
Recommendation to be brought to the attention of Working Parties 8A and 9D     BR Study Group Department     2007-08-08
[ 256 ]  
 
Liaison statement to Working Parties 6B and 9D - System characteristics of television outside broadcast (TVOB), electronic news gathering (ENG) and electronic field production (EFP) in the mobile service for use in sharing studies     WP 8A     2007-08-01
[ 255 ]  
 
Liaison statement to Working Party 4A (copied to Working Parties 8F, 9B, 9D and 4-9S) - Compatibility between broadband wireless access (BWA) systems and fixed-satellite service (FSS) networks     WP 8A     2007-08-01
[ 254 ]  
 
Liaison statement to WP 8B - Consideration of sharing with High-Frequency surface wave radar systems     WP 9C     2007-07-16
[ 253 ]  
 
Liaison statement to ITU-R Working Party 1B on the study of software defined radio and cognitive radio systems in Working Party 1B     WP 4-9S     2007-06-29
[ 252 ]  
 
Liaison statement to WP 8B (for information to WP 7C, 6E, 9C and 9D) - Consideration of sharing with high-frequency surface wave radar systems     WP 8A   240/8   2007-06-15
[ 251 ]  
 
Liaison statement to Working Parties 8A, 8F, 9B, 9D and 4-9S - Compatibility between broadband wireless access (BWA) systems and fixed-satellite service (FSS) networks     WP 4A     2007-06-12
[ 250 ]  
 
Liaison statement to WP 1B - Study of Software Defined Radio and cognitive radio systems in WP 1B     WP 4A     2007-06-08
[ 249 ]  
+Ann.1-9 
Report on the meeting of Working Party 9D (Geneva, 8-16 May 2007)     Chairman, WP 9D     2007-05-18
[ 248 ]  
 
Final List of Participants - Working Party 9D (Geneva, 8-16 May 2007)     Director, BR     2007-05-16
[ 247 ]  
 
Reply to Liaison statement from 1B on the study of software defined radio and cognitive radio systems     WP 6S     2007-05-08
[ 246 ]  
 
List of documents issued     BR Study Group Department     2007-05-04
[ 245 ]  
 
Contribution to the working document towards a preliminary draft revision of Recommendation ITU-R F.758-4 - Considerations in the development of criteria for sharing between digital fixed wireless systems (FWS) in the fixed service and other services     United States of America   127/9, 225/9   2007-05-01
[ 244 ]  
 
Technical and operational characteristics of systems in the fixed service to facilitate sharing with the Earth exploration-satellite (passive) and space research (passive) services in the band 10.6-10.68 GHz     Canada     2007-05-01
[ 243 ]  
 
Preliminary Draft new Recommendation - Technical and operational characteristics of systems in the fixed service to facilitate sharing with the Earth exploration-satellite (passive) and space research (passive) services in the bands 10.6-10.68 GHz and 36-37 GHz     France   113/9   2007-04-30
[ 242 ]  
 
Preliminary draft modifications to Recommendation ITU-R F.1336-2 - Reference radiation patterns of omnidirectional, sectoral and other antennas in point-to-multipoint systems for use in sharing studies in the frequency range from 1 GHz to about 70 GHz     Japan   202/9   2007-04-25
[ 241 ]  
 
Development of a draft new Report on FS characteristics for different frequency bands     Japan   225/9   2007-04-25
[ 240 ]  
 
Proposal for the working document towards a preliminary draft new Recommendation ITU-R F.[COORD] "methodology for the cross-border coordination of fixed service systems and networks operating in the frequency range above 1 GHz"     Russian Federation     2007-04-25
[ 239 ]  
 
Draft revision of Recommendation ITU-R F.758     Japan   127/9, 225/9   2007-04-25
[ 238 ]  
 
Proposal to develop a preliminary draft new Question ITU-R [COORD/9} "Methodology for the cross-border coordination of fixed service systems and networks"     Russian Federation     2007-04-25
[ 237 ]  
 
Development of a draft new Report on analytical lists of the F-series and SF-series Recommendations     Japan     2007-04-25
[ 236 ]  
 
ITU-R Study Group 8 Question to be brought to the attention of Working Parties 4A, 7B, 7C and 9D     BR Study Group Department     2007-04-18
[ 235 ]  
 
ITU-R Study Group 6 Question to be brought to the attention of Working Parties 4B, 8D and 9D     BR Study Group Department     2007-03-13
[ 234 ]  
 
Liaison statement to Working Parties 4-9S and 9D - Preliminary draft new Recommendation ITU-R F.[HAPS-RAS 47GHz] - Protection of the radio astronomy service in the 48.94-49.04 GHz band from unwanted emissions from HAPS in the 47.2-47.5 GHz and 47.9-48.2 GHz bands     WP 7D     2007-02-19
Results:258 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2006-06-20