Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 192 ]
|
Liaison statement to Working Party 4A (copied to Working Parties 8F, 9B, 9D and 4-9S) - Compatibility between broadband wireless access (BWA) systems and fixed-satellite service (FSS) networks
|
WP 8A
|
|
2007-08-01 |
|
[ 191 ]
|
Liaison statement to Working Parties 8A, 8F, 9B, 9D and 4-9S - Compatibility between broadband wireless access (BWA) systems and fixed-satellite service (FSS) networks
|
WP 4A
|
|
2007-06-12 |
|
[ 190 ]
|
Liaison statement to WP 1B - Study of Software Defined Radio and cognitive radio systems in WP 1B
|
WP 4A
|
|
2007-06-08 |
|
[ 189 ]
+Ann.1-7 |
Chairman's report - Meeting 21-25 May 2007
|
Chairman, WP 4-9S
|
|
2007-05-23 |
|
[ 188 ]
|
Final List of Participants - Working Party 4-9S (Geneva, 21-23 May 2007)
|
Director, BR
|
|
2007-05-23 |
|
[ 187 ]
|
Liaison statement to ITU-R Working Party 1B on the study of software defined radio and cognitive radio systems in Working Party 1B
|
WP 9B and 9D
|
|
2007-05-21 |
|
[ 186 ]
|
List of documents issued
|
BR Study Group Department
|
|
2007-05-18 |
|
[ 185 ]
|
Review of old Recommendations of Working Party 4-9S
|
United States of America
|
|
2007-05-11 |
|
[ 184 ]
|
Proposed liaison statement to Working Parties 3J and 3M regarding the definition of height in Annex 1 of Recommendation ITU-R P.835-4
|
Canada
|
|
2007-05-14 |
|
[ 183 ]
|
Preliminary draft Revision of Recommendation ITU-R SF.1006 - Determination of the interference potential between earth stations of the fixed-satellite service and stations in the fixed service
|
United States of America
|
|
2007-05-11 |
|
[ 182 ]
|
Draft new Recommendation ITU-R SF.[4-9S/HAPS-PLIMIT] - Methodology for determining the power level for HAPS user terminals to facilitate sharing with space station receivers in the bands 47.2-47.5 GHz and 47.9-48.2 GHz
|
Korea (Republic of)
|
|
2007-05-10 |
|
[ 181 ]
|
Regulatory and procedural considerations regarding the use of HAPS in the FS in the bands 27/31 GHz and 47/48 GHz
|
Korea (Republic of)
|
|
2007-05-10 |
|
[ 180 ]
|
Reply to Liaison statement from 1B on the study of software defined radio and cognitive radio systems
|
WP 6S
|
|
2007-05-08 |
|
[ 179 ]
|
Preliminary review of the old Recommendations within Working Party 4-9S
|
Japan
|
|
2007-04-25 |
|
[ 178 ]
|
Development of a draft new Report on analytical lists of the F-series and SF-series Recommendations
|
Japan
|
|
2007-04-25 |
|
[ 177 ]
|
Recommendation to be brought to the attention of Working Parties 4A, 6S, 7B, 8D and 4-9S
|
BR Study Group Department
|
|
2007-03-14 |
|
[ 176 ]
|
Draft Revision of Recommendation ITU-R SF.1649 - Guidance for determination of interference from earth stations on vessels (ESVS) to stations in the fixed service when the ESV is within the minimum distance
|
Chairmen, SGs 4and 9
|
254/4, 226/9
|
2007-03-12 |
|
[ 175 ]
|
Liaison statement to Working Parties 4-9S and 9D - Preliminary draft new Recommendation ITU-R F.[HAPS-RAS 47GHZ] - Protection of the radio astronomy service in the 48.94-49.04 GHz band from unwanted emissions from HAPS in the 47.2-47.5 GHz and 47.9-48.2 GHz bands
|
WP 7D
|
|
2007-02-19 |
|
[ 174 ]
|
Liaison statement to ITU-R Working Party 1B on the study of software defined radio and cognitive radio systems in Working Party 1B - (Copy for information to ITU-R WPs 1A, 4A, 4-9S, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 9B and 9D)
|
WP 8F
|
|
2007-02-16 |
|
[ 173 ]
|
Preliminary draft new Recommendation ITU-R F. [HAPS-BORDER 47GHz] - PFD limits at international borders for HAPS providing FWA services to protect FS in neighbouring countries in 47.2-47.5 GHz and 47.9-48.2 GHz bands
|
Australia
|
|
2007-01-17 |
|
[ 172 ]
|
Preliminary draft new Recommendation ITU-R F. [HAPS- RAS 47GHz] - Protection of RAS in 48.94-49.04 GHz band from Out-of-Band emissions from HAPS in 47.2-47.5 GHz and 47.9-48.2 GHz bands
|
Australia
|
|
2007-01-15 |
|
[ 171 ]
|
Liaison statement to Radiocommunication Study Groups and Working Parties - Terminology database
|
CCV
|
|
2007-01-11 |
|
[ 170 ]
|
Liaison statement to WPs 1A, 4A, 4-9S, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 8F, 9B and 9D - The study of software defined radio and cognitive radio systems in Working Party 1B
|
WP 1B
|
|
2006-11-09 |
|
[ 169 ]
|
Liaison statement to Working Party 4-9S - Application of Recommendation ITU-R P.676-6
|
WP 3J
|
|
2006-11-08 |
|
[ 168 ]
+Corr.1 |
Liaison statement to Working Parties 1A, 1C, 4A, 4-9S, 6E, 7B, 7C, 7D, 8A, 8B, 8F, 9A and 9D - Spreadsheet implementation of the clear-air portion of Recommendation ITU-R P.452-12
|
WP 3M
|
|
2006-10-06 |
Results:192 total items. Result page:
1 -
2 -
3 -
4
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):