International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : 4-7-8-9 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R 4-7-8-9  C 

ITU-R 4-7-8-9

5 GHz band allocations

Results:51 total items.
Result page:  1 - 2  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source Date
[ 51 ]  
 
Liaison statement to JTG 4-7-8-9 - Agenda item 1.5     WP 8B   2001-06-04
[ 50 ]  
 
List of documents issued     JTG 4-7-8-9   2001-06-04
[ 49 ]  
 
Agenda item 1.5 of WRC-03 - Proposal to modify the CPM text     France   2001-06-04
[ 48 ]  
 
Protection of MLS in the 5 140-5 150 MHz band from Jason altimeter satellite     France   2001-06-04
[ 47 ]  
 
Frequency sharing between EESS-altimetry missions and NGSO MSS feeder-links in the band 5 140-5 250 MHz     France   2001-06-04
[ 46 ]  
 
Revision of draft CPM text - Chapter 2 - Mobile, mobile-satellite and space science services     Finland , France , Germany , Sweden , United Kingdom   2001-06-04
[ 45 ]  
 
WRC Agenda item 1.5, Resolution 736, resolves 1 and 3     Canada   2001-06-04
[ 44 ]  
 
Revisions to the radiolocation sections of the draft CPM text for Agenda item 1.5     Canada   2001-06-04
[ 43 ]  
 
Liaison statement to Joint Task Group 4-7-8-9 - Regulatory measures to protect feeder links (Earth-to-space) for the mobile-satellite service which operate in the band 5 150-5 250 MHz     WP 4A   2001-06-04
[ 42 ]  
 
Liaison statement to WP 7C (and WP 8B and JTG 4-7-8-9 for information) - WRC-03, Agenda item 1.5, Resolution 736 (WRC-2000) resolves 1: sharing between wireless access systems in the mobile service (including RLANS) and ...     JRG 8A-9B   2001-06-04
[ 41 ]  
 
LS on WRC-03 Agenda item 1.5, Resolution 736, resolves 1, 2 and 3 - Proposed elements for Draft CPM text     JRG 8A-9B   2001-06-04
[ 40 ]  
 
Liaison statement on WRC-03 Agenda item 1.5, Resolution 736 (WRC-2000) resolves 3: sharing between wireless access systems in the mobile service (including RLANS), and the EES/SR (active) services in the band 5 470-5 570 MHz     JRG 8A-9B   2001-06-04
[ 39 ]  
 
Liaison statement to WP 7C and JTG 4-7-8-9 - WRC-03 Agenda item 1.5, Resolution 736 (WRC-2000) resolves 2: Sharing between fixed wireless access in the fixed service with the EES/SR services in the band 5 250-5 350 MHz     JTG 8A-9B   2001-06-04
[ 38 ]  
 
Liaison statement to Joint Rapporteurs Group 8A-9B and JTG 4-7-8-9 - WRC-03 agenda item 1.5, Resolution 736 (WRC-2000) resolves 2: sharing between fixed wireless access in the fixed service with the EES/SR (active) services in ...     WP 7C   2001-06-04
[ 37 ]  
 
Liaison statement to JTG 4-7-8-9 and JRG 8A-9B - WRC-03 agenda item 1.5, Resolution 736 (WRC-2000) resolves 3: sharing between Wireless Access Systems (including RLANs) in the Mobile Service and the EES/SR (active) services in the.     WP 7C   2001-06-04
[ 36 ]  
 
Liaison statement to WPs 4A, 8D and JTG 4-7-8-9 - Sharing between spaceborne altimeters operating in the EES (active) and other services in the band 5 140-5 250 MHz     WP 7C   2001-06-04
[ 35 ]  
 
LS to JRG 8A-9B and JTG 4-7-8-9 - WRC-03 Agenda item 1.5, Res. 736 (WRC-2000) resolves 1, Sharing between wireless access systems in the mobile service (including RLANs) and the EES/SR (active) services in the band 5 250-5 350 MHz     WP 7C   2001-06-04
[ 34 ]  
 
Liaison statement to JTG 4-7-8-9 and WP 7C - Sharing between altimeters operating in the Earth Exploration-Satellite Service (Active) and other services in the band 5 140-5 250 MHz     JRG 8A-9B   2001-06-04
[ 33 ]  
 
Liaison statement to Working Parties 4A, 7C, 8D, Joint Rapporteur's Group 8A-9B and Joint Task group 4-7-8-9 - Earth exploration-satellite service (active) allocation in the band 5 140-5 250 MHz     WP 8B   2001-06-04
[ 32 ]  
 
Reply liaison statement to JTG 4-7-8-9 on Revision to draft CPM text - Chapter 2     WP 8B   2001-06-04
[ 31 ]  
 
Reply liaison statement from WP 8B - proposed modification to recommendation ITU-R SA.1280     WP 8B   2001-06-04
[ 30 ]  
 
Liaison statement to WP 7C and JTG 4-7-8-9 - Earth exploration-satellite service (active) allocation in the band 5 140-5 250 MHz     WP 4A   2001-06-04
[ 29 ]  
(Rev.1) 
Chairman's report on the second meeting of Joint Task Group 4-7-8-9 (Cleveland, 4-8 June 2001)     Ch. JTG 4-7-8-9   2001-06-04
[ 28 ]  
 
List of documents issued     BRSGD   2001-06-04
[ 27 ]  
 
Liaison statement from Working Party 8B - Reply to JTG 4-7-8-9 liaison statement with proposed text for Section 2.2 of the CPM Report     WP 8B   2001-06-04
Results:51 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2002-08-28