Collective Letters  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 8 ]
+Corr.1 +Add.1 |
Meeting of Study Group 15, Geneva, 5-16 December 2011
This corrigendum applies to the English version only
|
SG 15
|
|
2011-10-05 |
|
Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1938 ]
|
G.fast: Multi-layer TCAM
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-11-24 |
|
[ 1937 ]
|
Mapping of G.798 atomic functions to G.874.1 object classes
|
Deutsche Telekom AG
|
Q14/15
|
2011-11-23 |
|
[ 1936 ]
|
G.hnem: Proposal for subcarrier spacing of coexistence preamble symbols
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-23 |
|
[ 1935 ]
|
G.vector: Editorial fix in G.993.5 Figure 7-4 and 7-5.
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-11-23 |
|
[ 1934 ]
|
G.gen: G.vdsl: G.vector: VDSL2 Dynamic Virtual Noise
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-11-23 |
Currently viewing 5 of 420 documents related to this meeting (more...)
|
Temporary Documents  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 310-GEN ]
|
oLS: Reply to JCA-CIT (Ref: JCA-CIT-LS 4-E) on draft document on CIT needs
|
ITU-T Study Group 15
|
QALL/15
|
2011-12-15 |
|
[ 309-GEN ]
|
iLS: LS to TSAG and ITU-T SGs on pre-defined form to document the establishment of work items towards new Recommendations
|
ITU-T SG16
|
QALL/15
|
2011-12-12 |
|
[ 308-GEN ]
|
iLS: Reply LS to TSAG, JCA-CIT and ITU-T SGs on draft document on Conformance and Interoperability Testing (CIT) needs for review and comment by the Study Groups (JCA-CIT-LS4)
|
ITU-T SG16
|
QALL/15
|
2011-12-12 |
|
[ 307-GEN ]
|
Report of IEC SC86B meeting Melbourne, 27-29 October 2011
|
Liaison Rapporteur to IEC SC86B
|
Q7/15
|
2011-12-12 |
|
[ 306-GEN ]
|
iLS: Communication to ITU-T Q6/15 and Q12/15 from IETF's CCAMP Working Group on Flexible Grids
|
IETF CCAMP
|
Q6/15, Q12/15
|
2011-12-08 |
Currently viewing 5 of 609 documents related to this meeting (more...)
|
Reports  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 30 ]
|
Report of Working Party 3/15, Transport network structures (Geneva meeting, 5-16 December 2011)
|
SG 15
|
Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
|
2012-02-06 |
|
[ 29 ]
|
Report of Working Party 2/15, Optical access/transport network technologies and physical infrastructures (Geneva meeting, 5-16 December 2011)
|
SG 15
|
Q8/15, Q7/15, Q6/15, Q5/15, Q18/15, Q17/15, Q16/15
|
2012-02-06 |
|
[ 28 ]
|
Report of Working Party 1/15, Transport aspects of access networks and home networking (Geneva meeting, 5-16 December 2011)
|
SG 15
|
Q4/15, Q2/15, Q1/15
|
2012-02-06 |
|
[ 27 ]
|
Report of the sixth meeting of Study Group 15, Optical transport networks and access network infrastructures (Geneva, 5-16 December 2011)
|
SG 15
|
QALL/15
|
2012-01-31 |
|
Multiple Document Download: Formats and Languages to be included (when available):