Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1218 ]
|
Editorial comments on ePTS LD
To be verified by TSB
|
Net Insight AB (Sweden)
|
Q13/15
|
2026-06-16 |
|
[ 1217 ]
|
Contribution to address comments in C1201
To be verified by TSB
|
Net Insight AB (Sweden)
|
Q13/15
|
2026-06-16 |
|
[ 1216 ]
|
AI and the scope of Q2
To be verified by TSB
|
Futurewei Technologies Inc. (United States)
|
Q2/15
|
2026-06-16 |
|
[ 1215 ]
|
G.sup.ION-aiBB: Hierarchical AI-based distributed storage and compute over PON
To be verified by TSB
|
AT&T, Inc. (United States)
,
Nokia Corporation (Finland)
|
Q2/15
|
2026-06-16 |
|
[ 1214 ]
|
G.9804.2: ONU activation cycle state transition condition based on upstream wavelength match in the G.9804.2 Amd.3
To be verified by TSB
|
Futurewei Technologies Inc. (United States)
,
Nokia Corporation (Finland)
,
Nokia Solutions (Shanghai) Co., Ltd. (China)
|
Q2/15
|
2026-06-16 |
|
[ 1213 ]
|
G.9804.2: Editorial revision suggestions for G.9804.2 Amd.3
To be verified by TSB
|
Futurewei Technologies Inc. (United States)
,
Nokia Corporation (Finland)
,
Nokia Solutions (Shanghai) Co., Ltd. (China)
|
Q2/15
|
2026-06-16 |
|
[ 1212 ]
|
ePTS Monitoring
To be verified by TSB
|
Net Insight AB (Sweden)
,
Türk Telekom A.S. (Türkiye)
|
Q13/15
|
2026-06-16 |
|
[ 1211 ]
|
G.sup.88: Text proposal for DCPC-ODB and DCPC-SSB for inclusion into G.sup.88
To be verified by TSB
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
,
Huawei Technologies Düsseldorf GmbH (Germany)
,
Nokia Corporation (Finland)
|
Q2/15
|
2026-06-16 |
|
[ 1210 ]
|
G.sup.88: Update on complexity comparison of VHSP physical architectures
To be verified by TSB
|
Nokia Corporation (Finland)
,
ZTE Corporation (China)
|
Q2/15
|
2026-06-16 |
|
[ 1209 ]
|
Consistency across the Recommendations of the G.709.x series
To be verified by TSB
|
ADTRAN Holdings Inc. (United States)
,
China Information Communication Technologies Group
|
Q11/15
|
2026-06-16 |
|
[ 1208 ]
|
G.sup.88: ER penalty for IM-Coherent solutions for VHSP
To be verified by TSB
|
Nokia Corporation (Finland)
,
Nokia USA (United States)
|
Q2/15
|
2026-06-16 |
|
[ 1207 ]
|
Proposed working assumption and workplan for the development of B1T DWDM specifications
To be verified by TSB
|
ADTRAN Holdings Inc. (United States)
,
AT&T, Inc. (United States)
,
China Information Communication Technologies Group
,
Ciena Canada
,
Nokia USA (United States)
,
Orange (France)
|
Q6/15
|
2026-06-16 |
|
[ 1206 ]
|
G.dop: Simulation results on G.dop
To be verified by TSB
|
Maxlinear Inc (United States)
|
Q3/15
|
2026-06-16 |
|
[ 1205 ]
|
Proposal for updates to the specifications for the 800G application codes in draft revised G.698.2
To be verified by TSB
|
Ciena Canada
|
Q6/15
|
2026-06-16 |
|
[ 1204 ]
|
Distributed Fibre Optic Sensing (DFOS) applications for preventive maintenance of Optical Fibre Outside Plant (OSP)
To be verified by TSB
|
Sterlite Technologies Limited (India)
|
Q7/15
|
2026-06-16 |
|
[ 1203 ]
|
Issues in ITU-T G.8032
|
Nokia USA (United States)
|
Q10/15
|
2026-06-16 |
|
[ 1202 ]
|
Support of MEF 140 in draft revised G.8011
|
Nokia USA (United States)
|
Q10/15
|
2026-06-16 |
|
[ 1201 ]
|
Clarifications in G.Suppl-ePTS
To be verified by TSB
|
Calnex Solutions plc. (United Kingdom)
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2026-06-16 |
|
[ 1200 ]
|
Initial thoughts for B1T OTN management
To be verified by TSB
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q14/15, Q11/15
|
2026-06-16 |
|
[ 1199 ]
|
Proposed updates to G.7714.1 for B100G OTN and FlexO transport entities
To be verified by TSB
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q14/15
|
2026-06-16 |
|
[ 1198 ]
|
Proposed updates to Appendix I of G.7702
To be verified by TSB
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q12/15
|
2026-06-16 |
|
[ 1197 ]
|
T-TSC with multiple ports
To be verified by TSB
|
Nvidia (Israel)
|
Q3/15
|
2026-06-16 |
|
[ 1196 ]
|
Consideration of hitless protection switch mechanism for OTN
|
China Academy of Information and Communications Technology (CAICT)
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q11/15
|
2026-06-16 |
|
[ 1195 ]
|
Proposal to start a technical report on hollow-core fibres and their corresponding transmission technologies
|
Centre Tecnològic de Telecomunicacions de Catalunya (CTTC) (Spain)
,
China Academy of Information and Communications Technology (CAICT)
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
Orange (France)
,
TKH Group NV (Netherlands (Kingdom of the))
,
VIAVI Solutions (United States)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q6/15, Q5/15, Q2/15
|
2026-06-16 |
|
[ 1194 ]
|
Development of flyers for the promotion of ITU-T success stories
|
Canada
|
QALL/15
|
2026-06-16 |
|
[ 1193 ]
|
New use cases for PTP Announce message delay analysis in Appendix III of ITU-T G.781.1
To be verified by TSB
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2026-06-16 |
|
[ 1192 ]
(Rev.1) |
G.9804.2: Handling of Multi-Rate ONUs
|
ADTRAN Holdings Inc. (United States)
,
Nokia Corporation (Finland)
|
Q2/15
|
2026-06-16 |
|
[ 1191 ]
|
G.sup.88: DC Leakage-Induced ONU Interference and Mitigation in 200G Burst-Mode Coherent PON
To be verified by TSB
|
ADTRAN Holdings Inc. (United States)
|
Q2/15
|
2026-06-16 |
|
[ 1190 ]
|
Investigation on HCF interoperability
To be verified by TSB
|
China Mobile Communications Co. Ltd.
|
Q6/15, Q5/15
|
2026-06-16 |
|
[ 1189 ]
(Rev.1) |
G.7044: definitions
To be verified by TSB
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q11/15
|
2026-06-16 |
|
[ 1188 ]
|
Reuse G.8273.2 for FTS-Lite clock specification
|
Nvidia (Israel)
|
Q13/15
|
2026-06-16 |
|
[ 1186 ]
|
An optical link transceiver specification for G.xFIN-PHY
Not yet uploaded
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q3/15
|
2026-06-16 |
|
[ 1185 ]
|
Content proposal of activation process clause for G.Xfin-DLL
To be verified by TSB
|
China Telecommunications Corporation
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q3/15
|
2026-06-16 |
|
[ 1184 ]
|
FMCI updates on WMCI channel establishment
To be verified by TSB
|
China Academy of Information and Communications Technology (CAICT)
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q3/15
|
2026-06-16 |
|
[ 1183 ]
|
Consideration on reducing SFU response time
To be verified by TSB
|
China Academy of Information and Communications Technology (CAICT)
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q3/15
|
2026-06-16 |
|
[ 1182 ]
|
Technology maturity and cost assessment of the CPON for G.sup.88
To be verified by TSB
|
ZTE Corporation (China)
|
Q2/15
|
2026-06-16 |
|
[ 1181 ]
|
Technology maturity and cost assessment of IM-DD for G.sup.88
To be verified by TSB
|
ZTE Corporation (China)
|
Q2/15
|
2026-06-16 |
|
[ 1180 ]
|
Discussion of OCS and WSS application
To be verified by TSB
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q6/15
|
2026-06-16 |
|
[ 1179 ]
|
Discussion of optical switch application in data center
To be verified by TSB
|
Beijing University of Posts and Telecommunications (China)
,
China Unicom
|
Q6/15
|
2026-06-16 |
|
[ 1178 ]
|
Implementation of a Proof of Concept (PoC) - Fiber Optic Unbundling in Senegal
To be verified by TSB
|
Autorité de Régulation des Télécommunications et des Postes (ARTP) (Senegal)
|
Q2/15
|
2026-06-16 |
|
[ 1177 ]
|
Ethernet packet clients over FlexOyP for B1T
To be verified by TSB
|
China Mobile Communications Co. Ltd.
|
Q11/15
|
2026-06-16 |
|
[ 1176 ]
|
Service-oriented Management and Control
|
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2026-06-16 |
|
[ 1175 ]
|
Further test results of possible crosstalk effect with the self-tuning mechanism function for the revised G.698.4
To be verified by TSB
|
China Unicom
,
ZTE Corporation (China)
|
Q6/15
|
2026-06-16 |
|
[ 1174 ]
|
Proposal of new term 200G PAM4 in revised G.959.1
To be verified by TSB
|
China Unicom
|
Q6/15
|
2026-06-16 |
|
[ 1173 ]
|
DCP Component of GSTR.ENO
To be verified by TSB
|
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2026-06-16 |
|
[ 1172 ]
|
New work item of supplement for Mapping of sub-100G ODUk signals to FlexOL
To be verified by TSB
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2026-06-16 |
|
[ 1169 ]
|
Situation discussion of FlexO-16o-RSH in G.709.5 draft
To be verified by TSB
|
China Mobile Communications Co. Ltd.
|
Q11/15
|
2026-06-16 |
|
[ 1168 ]
|
Initial data for Data over twisted pair lines-based (DoTPL) domain type profile
To be verified by TSB
|
Maxlinear Inc (United States)
|
Q3/15
|
2026-06-16 |
|
[ 1167 ]
|
Considerations for 800G MTN over 800GBASE-R PHY
To be verified by TSB
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q11/15
|
2026-06-16 |
|
[ 1166 ]
|
Considerations for MTN Slots Allocation
To be verified by TSB
|
ZTE Corporation (China)
|
Q11/15
|
2026-06-16 |
Results:450 total items. Result page:
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):