International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG02 : Meeting 2026-09-09 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG02  TD (2026-09-09) 

ITU-T SG02

Operational aspects

Study Period 2025

Meeting  from 2026-09-09 to 2026-09-18

held in Switzerland [Geneva]

Other Meetings : [ 2026-09-09 ]  2026-02-04  2025-08-25  2025-02-05 

Temporary Documents  (GEN)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 525-GEN ]  
 
LS/i/r on information regarding determined Recommendation A.RA "Appointment and operations of registration authorities" (reply to TSAG-LS17) [from ITU-T SG11]     ITU-T Study Group 11   Q1/2   2026-08-20
[ 524-GEN ]  
 
LS/i/r on the ongoing work on draft Recommendation L.CP on Standardized terminology for Computing power and Electric power Coordination" (reply to SG5-LS62) [from ITU-T SG11]     ITU-T Study Group 11   Q7/2, Q6/2, Q5/2   2026-08-20
[ 523-GEN ]  
 
LS/i on initiation of new work item Q.MP-CEC "Monitoring parameters and methods in future networks for Computing power and Electric power Coordination" [from ITU-T SG11]     ITU-T Study Group 11   Q7/2, Q6/2, Q5/2   2026-08-20
[ 522-GEN ]  
 
LS/i on initiation of new work item Q.CPNG-DI "Architecture and signalling requirements of computing power network gateway supporting distributed inference" [from ITU-T SG11]     ITU-T Study Group 11   Q7/2, Q6/2, Q5/2   2026-08-20
[ 521-GEN ]  
 
LS/i/r on consent of draft new Recommendation ITU-T Q.3067 (ex Q.Req_Frame_RRDN) "Requirements and framework for network-based rapid response to disaster caused by natural hazards" (reply to ITU-D Q3/1-1/103-LS6) [from ITU-T SG11]     ITU-T Study Group 11   Q5/2, Q3/2   2026-08-20
Currently viewing 5 of 125  documents related to this meeting (more...)  

 
Temporary Documents  (PLEN)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 518-PLEN ]  
 
Revised baseline text for M.tom-uav-ir: "Interface between telecom operation and management system and UAV telecom service and management system - Protocol neutral requirement"     Editor   Q7/2   2026-08-20
[ 517-PLEN ]  
 
New baseline text of draft Recommendation ITU-T E.195 "ITU-T International numbering resource administration", as agreed at the Q1/2 RGM (June 2026)     Editor   Q1/2   2026-08-19
[ 516-PLEN ]  
 
TSB's handling of data linked to IINs  
Not yet available
 
TSB   Q1/2   2026-08-18
[ 515-PLEN ]  
 
Query about IINs and introduction of an online submission mechanism for notifications forms     TSB   Q1/2   2026-08-18
[ 514-PLEN ]  
 
Initial gap analysis of the current National Numbering Plan framework and its relationship with WTSA Resolution 91     TSB   Q1/2   2026-08-18
Currently viewing 5 of 91  documents related to this meeting (more...)  

 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2026-08-20