Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1972 ]
|
G.fast reported parameter precision and trueness requirements
|
British Telecommunications Public Ltd. Co. (BT Plc) (United Kingdom)
|
Q4/15
|
2020-01-14 |
|
[ 1971 ]
|
Noise Generation max|TE| with low-pass filter [G.8273.4]
|
Microsemi Corporation (United States)
|
Q13/15
|
2020-01-14 |
|
[ 1970 ]
(Rev.1) |
Wavelength plan for G.9807.3
|
Google Fiber (United States)
|
Q2/15
|
2020-01-14 |
|
[ 1968 ]
(Rev.1) |
Optical access concepts for G.9807.3
|
Google Fiber (United States)
|
Q2/15
|
2020-01-14 |
|
[ 1967 ]
|
G.mgfast: On the maintenance of DTFO channels
|
Intel Corporation (United States)
|
Q4/15
|
2020-01-14 |
|
[ 1966 ]
|
Changes to IEEE 1588 in the 2019 edition
|
Meinberg Funkuhren GmbH & Co.KG (Germany)
|
Q13/15
|
2020-01-14 |
|
[ 1965 ]
|
Soft handover solution for G.9991
|
Fraunhofer HHI & IIS (Germany)
|
Q18/15
|
2020-01-14 |
|
[ 1964 ]
|
QIT as a topic in the question text of Q12
|
Infinera Corporation (United States)
|
Q12/15
|
2020-01-14 |
|
[ 1963 ]
|
G.hn: Ways forward for G.hn data models
|
Maxlinear Inc (United States)
|
Q18/15
|
2020-01-14 |
|
[ 1962 ]
|
Security as a topic in the question text of Q12
|
Infinera Corporation (United States)
|
Q12/15
|
2020-01-14 |
|
[ 1961 ]
|
Updates on the Smart Grid technical paper text
|
Maxlinear Inc (United States)
|
Q18/15
|
2020-01-14 |
|
[ 1960 ]
|
AI/ML as a topic in the question text of Q12
|
Infinera Corporation (United States)
|
Q12/15
|
2020-01-14 |
|
[ 1959 ]
|
G.hn: RPF working text updates
|
Maxlinear Inc (United States)
|
Q18/15
|
2020-01-14 |
|
[ 1958 ]
|
G.hn: Mechanism to send reduced set of topology information for smart grid applications
|
Maxlinear Inc (United States)
|
Q18/15
|
2020-01-14 |
|
[ 1957 ]
|
G.vlc: Corrigenda to G.vlc Recommendation
|
Maxlinear Inc (United States)
|
Q18/15
|
2020-01-14 |
|
[ 1956 ]
|
Basing ELP modelling on IEEE Std 802.1Qcp
|
Nokia USA (United States)
|
Q14/15
|
2020-01-14 |
|
[ 1955 ]
|
Revising G.8012 and G.8012.1
|
Nokia USA (United States)
|
Q10/15
|
2020-01-14 |
|
[ 1954 ]
|
G.mgfast: Review of G.9701 section 7.3 (Transmit PSD mask) for re-use in G.mgfastn
|
Nokia Corporation (Finland)
|
Q4/15
|
2020-01-14 |
|
[ 1953 ]
|
G.vlc: Handling alignment between G.hn and G.vlc Recommendations
|
Maxlinear Inc (United States)
|
Q18/15
|
2020-01-14 |
|
[ 1952 ]
|
Coexistence and integration of G.9991 with 802.11bb
|
Fraunhofer HHI & IIS (Germany)
|
Q18/15
|
2020-01-14 |
|
[ 1951 ]
|
Proposal for an Open Cable Budget
|
Subcom, LLC (United States)
|
Q8/15
|
2020-01-14 |
|
[ 1950 ]
|
G.vlc: 802.1X Port-Based Authentication
|
Maxlinear Inc (United States)
,
Signify Netherlands B.V.
|
Q18/15
|
2020-01-14 |
|
[ 1949 ]
|
Proposal to address the cumulative network dynamic Time Error (dTE) budgeting difference between O-RAN synchronization specification and ITU-T G.8271.1 specification
|
Juniper Networks (United States)
|
Q13/15
|
2020-01-14 |
|
[ 1948 ]
|
Dimensioning in G.ctn5g
|
Ericsson Canada, Inc.
|
Q11/15
|
2020-01-14 |
|
[ 1947 ]
|
Cumulative network dynamic Time Error (dTE) budgeting, differs in O-RAN synchronization specification compared to ITU-T G.8271.1
|
Juniper Networks (United States)
|
Q13/15
|
2020-01-14 |
|
[ 1946 ]
|
Architecture view in G.ctn5g
|
Ericsson Canada, Inc.
|
Q11/15
|
2020-01-14 |
|
[ 1945 ]
|
A 25 Gb/s Linerate for ITU Q2 Projects
|
AT&T, Inc. (United States)
,
British Telecommunications Public Ltd. Co. (BT Plc) (United Kingdom)
,
Broadcom Corporation (United States)
,
Corning Incorporated (United States)
,
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
,
Intel Corporation (United States)
,
KT Corporation (Korea (Rep. of))
,
Mitsubishi Electric Corporation (Japan)
,
NBN Corporation Limited (Australia)
,
Nokia Corporation (Finland)
,
Nokia USA (United States)
,
Oki Electric Industry Company Ltd. (OKI) (Japan)
,
SK Telecom (Korea (Rep. of))
,
Sumitomo Electric Industries, Ltd. (Japan)
,
Telecom Italia S.p.A. (Italy)
,
Telefon AB - LM Ericsson (Sweden)
,
TELUS Communications Inc. (Canada)
,
Tibit Communications (United States)
|
Q2/15
|
2020-01-14 |
|
[ 1944 ]
|
G.8271.1: Estimation of Max|TER|
|
Calnex Solutions Limited (United Kingdom)
|
Q13/15
|
2020-01-14 |
|
[ 1943 ]
|
Comments on G.ctn5g
|
Ericsson Canada, Inc.
|
Q11/15
|
2020-01-14 |
|
[ 1942 ]
|
Considerations and proposal for progressing with G.Sup_sub1G development
|
SM Optics s.r.l. (Italy)
,
Telecom Italia S.p.A. (Italy)
|
Q11/15
|
2020-01-14 |
|
[ 1941 ]
|
Use of Optical Clocks as reference for Synchronization in Telecommunications
|
Orange (France)
|
Q13/15
|
2020-01-14 |
|
[ 1940 ]
|
Synchronization requirements for Continuous-Variable Quantum Key Distribution (CV-QKD)
|
Orange (France)
|
Q13/15
|
2020-01-14 |
|
[ 1939 ]
|
Proposal to allow two-wavelength attenuation models in G.650.1
|
OFS Fitel, LLC (United States)
|
Q5/15
|
2020-01-14 |
|
[ 1938 ]
|
25G Extended Budget using SOA-based OLT-Rx
|
Nokia Corporation (Finland)
,
Nokia USA (United States)
|
Q2/15
|
2020-01-14 |
|
[ 1937 ]
|
G.8261: Network limit for shorter chains of enhanced clocks
|
Calnex Solutions Limited (United Kingdom)
|
Q13/15
|
2020-01-14 |
|
[ 1936 ]
|
G.vdsl: VDSL PSD
|
British Telecommunications Public Ltd. Co. (BT Plc) (United Kingdom)
|
Q4/15
|
2020-01-14 |
|
[ 1935 ]
|
Justification for an 0.25 dB/km attenuation specification value for G.654.E fibre
|
OFS Fitel, LLC (United States)
|
Q6/15, Q5/15
|
2020-01-14 |
|
[ 1934 ]
|
Baseline receiver sensitivity for 50G PON ONU
|
Nokia Corporation (Finland)
,
Nokia USA (United States)
|
Q2/15
|
2020-01-14 |
|
[ 1933 ]
(Rev.1) |
Identifying mis-connection and mis-configuration of FlexE and G.mtn links
|
Microsemi Corporation (United States)
|
Q11/15
|
2020-01-14 |
|
[ 1932 ]
|
Optical Techniques
|
Ministry of Telecommunications & Information Technology (State of Palestine)
|
QALL/15
|
2020-01-14 |
|
[ 1931 ]
|
3GPP/NR plans for positioning
|
Nokia Corporation (Finland)
|
Q13/15
|
2020-01-14 |
|
[ 1930 ]
|
Virtual PTP port definition
|
Nokia Corporation (Finland)
|
Q13/15
|
2020-01-14 |
|
[ 1929 ]
|
Packet network segment and Inter-working function definition
|
Nokia Corporation (Finland)
|
Q13/15
|
2020-01-14 |
|
[ 1928 ]
|
PTS holdover [G.8273.4]
|
Nokia Corporation (Finland)
|
Q13/15
|
2020-01-14 |
|
[ 1927 ]
|
APTS holdover [G.8273.4]
|
Nokia Corporation (Finland)
|
Q13/15
|
2020-01-14 |
|
[ 1926 ]
|
FFO study with different input signals [G.8271.1]
|
Nokia Corporation (Finland)
|
Q13/15
|
2020-01-14 |
|
[ 1925 ]
|
G.mgfast: Proposal for DTFO channel monitoring
|
Broadcom Corporation (United States)
,
Nokia Corporation (Finland)
|
Q4/15
|
2020-01-14 |
|
[ 1924 ]
(Rev.1) |
G.mgfast: Working text for an Annex on NT Identification and Authentication
|
ADTRAN (United States)
|
Q4/15
|
2020-01-14 |
|
[ 1923 ]
|
add IWF P-F [G.8273.4]
|
Nokia Corporation (Finland)
|
Q13/15
|
2020-01-14 |
|
[ 1922 ]
|
add IWF F-P [G.8273.2]
|
Nokia Corporation (Finland)
|
Q13/15
|
2020-01-14 |
Results:436 total items. Result page:
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):