International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 5 : Meeting 2018-09-11 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 5  C (2018-09-11) 

ITU-T SG 5

Environment, climate change and circular economy

Study Period 2017

Meeting  from 2018-09-11 to 2018-09-21

held in Switzerland [Geneva]

Other Meetings : 2021-11-30  2021-05-11  2020-10-19  2020-05-11  2019-09-16  2019-05-13  2018-05-21  2018-03-05  2017-11-13  2017-05-15 

Results:132 total items.
Result page:  1 - 2 - 3  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 409 ]  
 
New versions v 8.32 and 8.64 of the software "EMF-estimator"     National Institute of Telecommunications (Poland) , Orange Polska S.A. (Poland)   Q3/5   2018-08-30
[ 408 ]  
 
Baseline document L.EW 2020 Guideline on Implementing the E-waste Reduction Target of the Connect2020 Agenda     Argentina , Egypt , Huawei Technologies Co., Ltd. (China)   Q7/5   2018-08-30
[ 407 ]  
 
Proposed table of content for a proposed new work item on "A methodology for improving, assessing and scoring the sustainability performance of office buildings"     MJRD Assessment Inc. (Canada)   Q6/5   2018-08-30
[ 406 ]  
 
Proposed new work item on draft Recommendation ITU-T L.xxx on A Methodology for improving, assessing and scoring the sustainability performance of office buildings     MJRD Assessment Inc. (Canada)   Q6/5   2018-08-30
[ 405 ]  
 
Proposed baseline text for proposed new draft Recommendation ITU-T K.Workers_safety     Wavecontrol, S.L. (Spain)   Q3/5   2018-08-30
[ 404 ]  
 
Proposed input to draft recommendation L.CEM Criteria for evaluation of the environmental impact of mobile phones by Apple, Huawei and BRS during the interim period May- September 2018     Egypt   Q7/5   2018-08-30
[ 403 ]  
 
BRS's additions to the draft L.EW Connect 2020 during the Interim period May- September 2018     Egypt   Q7/5   2018-08-30
[ 402 ]  
 
Baseline document for draft Recommendation ITU-T L.ER Guidelines and Certification schemes for e- Waste Recyclers     Egypt   Q7/5   2018-08-30
[ 401 ]  
(Rev.1) 
Proposed draft for L.ENST2 based on ETSI version and e-meetings     Orange   Q6/5   2018-08-29
[ 400 ]  
(Rev.1) 
Proposal of new work item on Carbon Neutrality for organisations in the ICT sector     Orange   Q9/5   2018-08-29
[ 399 ]  
(Rev.1) 
Proposal of new work item : rare metals criticality index     Orange   Q9/5   2018-08-29
[ 398 ]  
(Rev.1) 
Proposal of new work item on the impact of ICT on biodiversity     Orange   Q9/5   2018-08-29
[ 397 ]  
(Rev.1) 
Proposal of new work item TCFD     Orange   Q9/5   2018-08-29
[ 396 ]  
(Rev.1) 
Proposal of a new work item, Supplement on ICT sector 2 degrees trajectory     Orange   Q9/5   2018-08-29
[ 395 ]  
(Rev.1) 
Complement to L.MAE, a 2 degrees scenario for network operators     Orange   Q9/5   2018-08-29
[ 394 ]  
 
Variants of IEEE 802.3 Ethernet Standard implementations     Bourns Limited   Q2/5   2018-08-29
[ 393 ]  
 
L.MAAP: Information regarding a new study on the relation between CO2 emissions of countries and their ICT maturity     Telefon AB - LM Ericsson (Sweden)   Q9/5   2018-08-29
[ 392 ]  
 
L.MAAP: Principles and proposed content     Telefon AB - LM Ericsson (Sweden)   Q9/5   2018-08-29
[ 391 ]  
 
L.1450 next steps: A trajectory for the ICT sector for 2030 in line with Carbon Law     Telefon AB - LM Ericsson (Sweden)   Q9/5   2018-08-29
[ 390 ]  
 
Circular Economy related policy and standardization - the case of Europe     Telefon AB - LM Ericsson (Sweden)   Q7/5   2018-08-29
[ 389 ]  
(Rev.1) 
L.1450, L.1410: Application of Recommendations in new study on the global Energy and Carbon Footprints of the ICT sector     Telefon AB - LM Ericsson (Sweden)   Q9/5, Q6/5   2018-08-29
[ 388 ]  
(Rev.1) 
Proposed new work item on draft Recommendation ITU T L.ICT_CE "ICT response to circular economy     Communications Authority of Kenya (CA) , Argentina , Huawei Technologies Co., Ltd. , Spain , Telecommunications and Post Regulatory Authority (Sudan) , Uganda Communications Commission (UCC)   Q9/5, Q7/5, Q6/5   2018-08-29
[ 387 ]  
(Rev.1) 
Proposed new work item on draft new Recommendation ITU T L.Env_KPI_network-arch "Environmental KPI for network architecture     Argentina , Huawei Technologies Co., Ltd. , Telecommunications and Post Regulatory Authority (Sudan)   Q9/5, Q7/5, Q6/5   2018-08-29
[ 386 ]  
 
MOV terms - Annotated IEC 61051-1 ed. 3 review     Bourns Limited   Q2/5   2018-08-29
[ 385 ]  
(Rev.1) 
Electro Magnetic Field from Mobile Communications Base stations - Monitoring, Compliance and Public Awareness Mechanism.     India , Ministry of Communications   Q3/5   2018-08-29
[ 384 ]  
(Rev.1) 
5G EMF Survey at the 5G Innovation Centre, Southport Australia     Telefon AB - LM Ericsson (Sweden) , Telstra Corporation Ltd.   Q3/5   2018-08-29
[ 383 ]  
(Rev.1) 
ITU-T K91. Suppl. 4 (10/2015) - Electromagnetic field considerations in smart sustainable cities - 5G update     GSMA , Telstra Corporation Ltd.   Q3/5   2018-08-29
[ 382 ]  
(Rev.1) 
K.Supp-5G - Radiofrequency Electromagnetic field (RF-EMF) compliance assessments for 5G wireless networks     Telefon AB - LM Ericsson (Sweden) , Nokia Corporation (Finland) , Telstra Corporation Ltd.   Q3/5   2018-08-29
[ 381 ]  
(Rev.1) 
The 3rd Draft new Recommendation ITU-T K.wire-line_emc     Huawei Technologies Co., Ltd.   Q4/5   2018-08-29
[ 380 ]  
 
Added the requirements for SSI powered by up to 400V IT d.c. system in ITU-T K.psp     Huawei Technologies Co., Ltd.   Q1/5   2018-08-29
[ 379 ]  
 
Some revision suggestions for ITU-T K.psp "Protection of small-size telecommunication installations with poor earthing conditions"     Huawei Technologies Co., Ltd.   Q1/5   2018-08-29
[ 378 ]  
 
The fifth draft of K.psp "Protection of small-size telecommunication installations with poor earthing conditions"     China Unicom   Q1/5   2018-08-29
[ 377 ]  
(Rev.1) 
Comments and proposed changes to K.44     Cisco Systems, Inc.   Q2/5   2018-08-28
[ 376 ]  
(Rev.1) 
ITU-T Rec. L.1310 (07/2017) Energy efficiency metrics and measurement methods for telecommunication equipment  
 
Huawei Technologies Co., Ltd. , Telefon AB - LM Ericsson (Sweden)   Q6/5   2018-08-28
[ 375 ]  
(Rev.1) 
L.1310, "Energy efficiency metrics and measurement methods for telecommunication equipment", Proposed updates on definition of energy efficiency metrics and test methodologies for wireless access technologies     Huawei Technologies Co., Ltd. , Telefon AB - LM Ericsson (Sweden)   Q6/5   2018-08-28
[ 374 ]  
 
Proposal for a new work item on Supplement to K.45 "Technical rationale of resistibility of telecommunication equipment installed in the access and trunk networks against lightning"     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2018-08-28
[ 373 ]  
 
Proposal for a new work item on Supplement to K.20 "Technical rationale of resistibility of telecommunication equipment installed in a telecommunication centre against lightning"     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2018-08-28
[ 372 ]  
 
Proposal for a new work item on Supplement to K.21 "Technical rationale of resistibility of telecommunication equipment installed in customer premises against lightning"     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2018-08-28
[ 371 ]  
(Rev.1-2) 
Re-comments on TD523 and draft K.vss     Nippon Telegraph and Telephone Corporation (NTT)   Q1/5   2018-08-28
[ 370 ]  
(Rev.1) 
Recommendation ITU-T L.GAL2 - Interface for power management in NFV environments "Green Abstraction Layer 2"     Orange (France) , Consorzio Nazionale Interuniversitario per le Telecomunicazioni CNIT (Italy)   Q6/5   2018-08-28
[ 369 ]  
(Rev.1) 
EMF extrapolation method of 5G radio stations for compliance assessment     Korea (Rep. of)   Q3/5   2018-08-28
[ 368 ]  
(Rev.1) 
EMF level monitoring and information platform for various radio stations     Korea (Rep. of)   Q3/5   2018-08-28
[ 367 ]  
 
Introduction on the RF EMF warning signage applied in Korea     Korea (Rep. of)   Q3/5   2018-08-28
[ 366 ]  
(Rev.1) 
K.52 "Guidance on complying with limits for human exposure to electromagnetic fields": New version of the software K.52 calculator     Orange Polska S.A.   Q3/5   2018-08-28
[ 365 ]  
 
Comparison of the exclusion zones in front of the mobile base station antennas caused by the different RF EMF exposure limits     Orange Polska S.A.   Q3/5   2018-08-28
[ 364 ]  
(Rev.1-2) 
Evaluation of the EMF strength for verifying the compliance with guidelines inside the subway train     Korea (Rep. of) , Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))   Q3/5   2018-08-28
[ 363 ]  
 
Comparison of measurement and numerical prediction results of EMF strength in the vicinity of radiocommunication stations     Korea (Rep. of)   Q3/5   2018-08-28
[ 362 ]  
 
Proposal of updating L.green_mgm_DC with a control function     Korea (Rep. of)   Q6/5   2018-08-28
[ 361 ]  
 
Proposed third draft of new Recommendation K.spdsafe "Guidance on safety relating to the use of surge protective devices and surge protective components in telecommunication terminal equipment"     Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q2/5   2018-08-28
[ 360 ]  
 
Comments on earthing conditions of power feeding systems in K.20, K.21 and K.44     Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q2/5   2018-08-28
Results:132 total items.
Result page:  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-19