Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 49 ]
|
Inclusion of TSAG comments in the text of Q14/11
|
France
|
QALL/11
|
2013-02-14 |
|
[ 48 ]
|
Comments highlighted by the draft Handbook on Physical Realisation of NGN
|
Russian Federation
|
Q8/11, Q11/11
|
2013-02-14 |
|
[ 47 ]
|
Proposed Q11/11 work-plan for Study Period 2013-2016
|
Russian Federation
|
Q11/11
|
2013-02-14 |
|
[ 46 ]
|
Proposal to start new work item on Q.NP-req "Requirements for network performance and quality measurements services (network probes)"
|
Russian Federation
|
Q10/11
|
2013-02-14 |
|
[ 45 ]
|
Proposal to advance draft Recommendation ITU-T Q.MSPQuality "The signaling protocol of the quality of service monitoring system for controlling and data exchanging"
|
Russian Federation
|
Q13/11, Q10/11
|
2013-02-14 |
|
[ 44 ]
|
Proposal new work item - draft Recommendation ITU-T Q.InSpMs "The Framework and protocol requirements for testing of Internet speed access and speed on interconnection among carriers networks"
|
Russian Federation
|
Q15/11
|
2013-02-12 |
|
[ 43 ]
|
Proposal to revise the terms of reference of JCA-CIT
|
A1 Telekom Austria AG
|
QAll/11
|
2013-02-12 |
|
[ 42 ]
(Rev.1-2) |
Proposal to Consent OGC Open GeoSMS for ITU-T Recommendation
|
Open Geospatial Consortium (OGC)
|
Q2/11, Q11/11, Q10/11
|
2013-02-12 |
|
[ 41 ]
|
Proposal for initiating a new work item: Request-Routing System Extension for content delivery
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/11
|
2013-02-12 |
|
[ 40 ]
(Rev.1) |
Draft Action plan of ITU-T SG11 on implementation of ITU C&I Programme
|
A1 Telekom Austria AG
|
QALL/11
|
2013-02-12 |
|
[ 39 ]
(Rev.1) |
Proposal to advance draft ITU-T Q.WebMidCall "Signalling Requirements for Web based Mid-call Service"
|
KT Corporation
|
Q2/11
|
2013-02-12 |
|
[ 38 ]
(Rev.1-2) |
A.5 Justification for draft recommendation: Q.3942.1 - "Terminating Identification Restriction (TIR) using IP Multimedia (IM) Core Network (CN) subsystem"; Conformance Test Specification; Part 1: Protocol Implementation Conformance Statement (PICS)
|
A1 Telekom Austria AG
,
Deutsche Telekom AG
|
Q11/11
|
2013-02-12 |
|
[ 37 ]
(Rev.1) |
A.5 Justification for draft recommendation: Q.3943.1 "Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Tests Specification;Part 1: Protocol Implementation Conformance Statement (PICS)"
|
A1 Telekom Austria AG
,
Deutsche Telekom AG
|
Q11/11
|
2013-02-12 |
|
[ 36 ]
(Rev.1) |
A.5 Justification for draft recommendation: Q.3943.4 - Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Tests Specification; User side; Part 4: Test Suite Structure and Test Purposes (TSS&TP)
|
Deutsche Telekom AG
|
Q11/11
|
2013-02-12 |
|
[ 35 ]
(Rev.1) |
Report and feedback on HATS NGN interoperability event (supported by ITU-T) and new work items proposed
|
NEC Corporation
,
OKI Electric Industry Company Ltd. (OKI)
|
Q10/11
|
2013-02-12 |
|
[ 34 ]
(Rev.1) |
Proposed draft Q.OIP/OIR
|
NEC Corporation
|
Q2/11
|
2013-02-12 |
|
[ 33 ]
(Rev.1-3) |
Proposal to advance and Consent draft ITU-T Q.3942.1 "Terminating Identification Restriction (TIR) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Test Specification;" Part 1: Protocol Implementation Conformance Statement (PICS)"
|
Deutsche Telekom AG
|
Q11/11
|
2013-02-12 |
|
[ 32 ]
|
Proposed texts for section 6 of Draft Recommendation Q.nacp.Nc
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q7/11
|
2013-02-12 |
|
[ 31 ]
|
Proposed texts for section 6 of Draft Recommendation Q.nacp.Ne
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q7/11
|
2013-02-12 |
|
[ 30 ]
(Rev.1) |
Proposal to start a new work item on "Terminating Identification Presentation (TIP) and Terminating Identification Restriction (TIR)" (Q.TIP/TIR)
|
A1 Telekom Austria AG
|
Q3/11, Q2/11
|
2013-02-12 |
|
[ 29 ]
(Rev.1) |
Draft Recommendation ITU-T Q.NGN Net. Conf-OIP-OIR TSS&TP "Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR); Conformance Tests Specification, Network side, Part 2: Test Suite Structure and Test Purposes (TSS&TP)"
|
A1 Telekom Austria AG
,
Deutsche Telekom AG
|
Q11/11
|
2013-02-11 |
|
[ 28 ]
(Rev.1) |
Draft new Recommendation ITU-T Q.3931.3
IMS/PES Performance Benchmark
Part 3: Traffic Sets and Traffic Profiles
|
A1 Telekom Austria AG
|
Q10/11
|
2013-02-11 |
|
[ 27 ]
(Rev.1) |
Proposal to advance draft new Recommendation ITU-T Q.3931.4 "IMS/PES Performance Benchmark; Part 4: Reference Load network quality parameters"
|
A1 Telekom Austria AG
|
Q10/11
|
2013-02-11 |
|
[ 26 ]
(Rev.1) |
Proposal to advance ITU-T Q.3932.2 "IMS/NGN Performance Benchmark; Part 2: Subsystem Configurations and Benchmarks"
|
A1 Telekom Austria AG
|
Q10/11
|
2013-02-11 |
|
[ 25 ]
(Rev.1) |
Proposal to advance draft ITU-T Q.3932.1 "IMS/NGN Performance Benchmark; Part 1: Core concept"
|
A1 Telekom Austria AG
|
Q10/11
|
2013-02-11 |
|
[ 24 ]
|
Proposals for the collaborative QoE/QoS testing platform to advance in "Q.QMS" work item
|
Universidad Del País Vasco
|
Q10/11
|
2013-02-11 |
|
[ 23 ]
|
Open Issues in Draft Revised Recommendation Q.3303.3 (Version 3)
|
Applied Communications Sciences
|
Q4/11
|
2013-02-11 |
|
[ 22 ]
(Rev.1) |
A.5 justification for ITU-T Q.39xx-1
|
A1 Telekom Austria AG
|
Q11/11
|
2013-02-10 |
|
[ 21 ]
(Rev.1) |
A.5 Justification for draft recommendation: Q.3943.2 - Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Tests Specification; Network side; Part 2: Test Suite Structure and Test Purposes (TSS&TP)
|
A1 Telekom Austria AG
,
Deutsche Telekom AG
|
Q11/11
|
2013-02-10 |
|
[ 20 ]
(Rev.1) |
Proposal to advance and Consent draft ITU-T Q.3943.1 "Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance test specification; Part 1: Protocol Implementation Conformance Statement (PICS)"
|
A1 Telekom Austria AG
,
Deutsche Telekom AG
|
Q11/11
|
2013-02-10 |
|
[ 19 ]
(Rev.1-3) |
Proposal to advance and Consent draft ITU-T Q.3943.4 "Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Tests Specification; User side Part 4: Test Suite Structure and Test Purposes (TSS&TP)
|
A1 Telekom Austria AG
,
Deutsche Telekom AG
|
Q11/11
|
2013-02-08 |
|
[ 18 ]
(Rev.1-2) |
Proposal to advance and Consent draft ITU-T Q.3943.2 "Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Tests Specification, Network side, Part 2: Test Suite Structure and Test Purposes (TSS&TP)"
|
A1 Telekom Austria AG
,
Deutsche Telekom AG
|
Q11/11
|
2013-02-08 |
|
[ 17 ]
(Rev.1) |
Propose a new work item on the signalling consideration for cross stratum optimization required in Y.VNC
|
China
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co. Ltd.
|
Q4/11
|
2013-02-08 |
|
[ 16 ]
|
Modifications to TRQ.ets-protocol
|
Applied Communications Sciences
|
Q3/11
|
2013-02-07 |
|
[ 15 ]
|
Modifications to TRQ.ETS-overview
|
Applied Communications Sciences
|
Q3/11
|
2013-02-07 |
|
[ 14 ]
|
Proposals for the traffic parameters of device monitoring to advance "Q.monitor_d"
|
China Telecommunications Corporation
|
Q13/11
|
2013-02-07 |
|
[ 13 ]
|
Proposals for the performance parameters of device monitoring to advance "Q.monitor_d"
|
China Telecommunications Corporation
|
Q13/11
|
2013-02-07 |
|
[ 12 ]
|
Proposal for 'Measurement metrics' of device monitoring, to advance "Q.monitor_d"
|
China Telecommunications Corporation
|
Q13/11
|
2013-02-07 |
|
[ 11 ]
|
Propose to start a new draft Recommendation for requirements of software-defined BAN
|
China Telecommunications Corporation
|
Q6/11, Q5/11, Q4/11
|
2013-02-07 |
|
[ 10 ]
(Rev.1) |
IETF SIP RFC3261Conformance Tests Part1: TSS&TP
|
A1 Telekom Austria AG
|
Q11/11
|
2013-02-07 |
|
[ 9 ]
(Rev.1) |
Reference load profiles and background traffic load
|
A1 Telekom Austria AG
|
Q10/11
|
2013-02-07 |
|
[ 8 ]
(Rev.1) |
Propose a new supplement on signalling requirements and architecture for Software Defined Networking
|
China
|
Q6/11, Q5/11, Q4/11, Q1/11
|
2013-02-06 |
|
[ 7 ]
(Rev.1) |
Propose a new work item on unified intelligent programmable interface for IPv6 transition technologies
|
China
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q6/11
|
2013-02-06 |
|
[ 6 ]
(Rev.1) |
Proposal of requirements for interworking between UE and NGN core of different IP version in Q.IPv6ProMM
|
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q6/11
|
2013-02-04 |
|
[ 5 ]
(Rev.1) |
Proposal of input for general requirements for border translation in Q.IPv6ProMM
|
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q6/11
|
2013-02-04 |
|
[ 4 ]
(Rev.1) |
Proposal of architecture for NGN multimedia services supporting IPv6 transition in Q.IPv6ProMM
|
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q6/11
|
2013-02-04 |
|
[ 3 ]
(Rev.1) |
Propose a new work item on signalling requirements for flexible network service combination on BNG (Broadband Network Gateway)
|
China
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q5/11
|
2013-01-26 |
|
[ 2 ]
(Rev.1) |
Arguments supporting "ITU cloud" feature in Question 15/11
|
Rwanda Utilities Regulatory Authority (RURA)
|
Q15/11
|
2013-01-25 |
|
[ 1 ]
|
Questions assigned to Study Group 11 (Signalling requirements, protocols and test specifications)
|
WTSA-12
|
QALL/11
|
2012-12-03 |
Results:49 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):