| Contributions  | 
| 
 | Number 
 | Title | Source | AI/Question 
 | Date | 
|  | [ 356 ] 
 | Q7/5  - EMF Guide - | Ghana | Q7/5 | 2014-07-10 | 
|  | [ 355 ] 
 | Contribution to DRAFT Recommendation K.OVP: Overvoltage Protection Guide for telecommunications equipment installed in a customer premise | Orange | Q4/5 | 2014-07-10 | 
|  | [ 354 ] 
 | Withdrawn
 | N/A |  | 2014-07-10 | 
|  | [ 353 ] (Rev.1-2)
 | Q7/5 -EMF Guide - Additional Contribution on SAR | Microsoft Corporation | Q7/5 | 2014-07-10 | 
|  | [ 352 ] (Rev.1-2)
 | Comments on the EMF guide draft | Microsoft Corporation | Q7/5 | 2014-07-10 | 
|  | [ 351 ] 
 | Draft new Recommendation ITU-T K.Maps | Argentina
          	    ,
        	    Brazil
          	    ,
        	    Colombia
          	    ,
        	    Ecuador
          	    ,
        	    El Salvador
          	    ,
        	    Uruguay | Q7/5 | 2014-07-10 | 
|  | [ 350 ] 
 | Base text for K.spd: Basic requirements for Surge Protective Devices | Bourns Limited | Q4/5, Q2/5 | 2014-07-10 | 
|  | [ 349 ] (Rev.1-2)
 | EMF - Guide - Proposed corrections and extensions | India
          	    ,
        	    Ministry of Communications and Information Technology, Law and J | Q7/5 | 2014-07-10 | 
|  | [ 348 ] (Rev.1-5)
 | Minor addition to K.83 - Monitoring of electromagnetic field levels | Microsoft Corporation
          	    ,
        	    Telefon AB - LM Ericsson | Q7/5 | 2014-07-10 | 
|  | [ 347 ] 
 | Proposal to delete the open wire in the context of K.5 | Electronics and Telecommunications Research Institute (ETRI) | Q3/5 | 2014-07-10 | 
|  | [ 346 ] 
 | Suggestion by a measurement result for the progress of K.int | Electronics and Telecommunications Research Institute (ETRI) | Q3/5 | 2014-07-10 | 
|  | [ 345 ] (Rev.1)
 | 4th draft of K.mpis: Measurement of human exposure levels when a wireless installation is put into service | Korea (Rep. of) | Q7/5 | 2014-07-10 | 
|  | [ 344 ] (Rev.1)
 | Monitoring of electromagnetic field levels in Korea | Korea (Rep. of) | Q7/5 | 2014-07-10 | 
|  | [ 343 ] (Rev.1)
 | Proposal to update the FAQs in the draft EMF Guide of March 2014 | Korea (Rep. of) | Q7/5 | 2014-07-10 | 
|  | [ 342 ] 
 | Minor addition to K.83 - Monitoring of electromagnetic field levels | Telstra Corporation Ltd. | Q7/5 | 2014-07-10 | 
|  | [ 341 ] 
 | Base text for K.thy: Parameters of fixed-voltage thyristor overvoltage protector components for the protection of telecommunications installations | Bourns Limited | Q4/5, Q2/5 | 2014-07-09 | 
|  | [ 340 ] 
 | Some Considerations on of Electromagnetic Compatibility For Wireless Body Area Communications | ZTE Corporation | Q11/5 | 2014-07-09 | 
|  | [ 339 ] (Rev.1)
 | Proposal for revision of K.27 related to earthing configuration of 400 V DC systems | Nippon Telegraph and Telephone Corporation (NTT) | Q5/5 | 2014-07-09 | 
|  | [ 338 ] (Rev.1)
 | Proposal for Ethernet port protection using Gas Discharge Tube arrestors (GDTs) against overvoltage | Nippon Telegraph and Telephone Corporation (NTT) | Q4/5 | 2014-07-09 | 
|  | [ 337 ] (Rev.1)
 | ITU EMF Guide - Recommendation Proposal | Orange Polska S.A.
          	    ,
        	    Telstra Corporation Ltd. | Q7/5 | 2014-07-09 | 
|  | [ 336 ] (Rev.1)
 | 3rd Draft of Recommendation K.secmiti | Nippon Telegraph and Telephone Corporation (NTT) | Q10/5 | 2014-07-09 | 
|  | [ 335 ] (Rev.1-2)
 | Liaison with CISPR/I about standardizing the test methods for radiation immunity for the use of wireless devices in the vicinity of telecommunication equipment | Nippon Telegraph and Telephone Corporation (NTT) | Q9/5 | 2014-07-09 | 
|  | [ 334 ] (Rev.1)
 | Immunity Test Levels considering Near Field for use of Wireless Communication Devices close to Telecommunications Network Equipment | Nippon Telegraph and Telephone Corporation (NTT) | Q9/5 | 2014-07-09 | 
|  | [ 333 ] (Rev.1)
 | EMC requirements for electrical systems in the telecommunication facilities | Nippon Telegraph and Telephone Corporation (NTT) | Q9/5 | 2014-07-09 | 
|  | [ 332 ] (Rev.1-2)
 | Emission from coaxial cables and connectors | Nippon Telegraph and Telephone Corporation (NTT) | Q8/5 | 2014-07-09 | 
|  | [ 331 ] 
 | EMF - Guide - Comments on the draft from Japan | National Institute of Information and Communications Technology | Q7/5 | 2014-07-09 | 
|  | [ 330 ] 
 | Contribution from Argentina on "Q7/5 - EMF Guide " | Argentina | Q7/5 | 2014-07-09 | 
|  | [ 329 ] (Rev.1-4)
 | EMF compliance assessment for radio relays | Alcatel-Lucent International
          	    ,
        	    GSM Association
          	    ,
        	    Orange
          	    ,
        	    Telefon AB - LM Ericsson
          	    ,
        	    Telstra | Q7/5 | 2014-07-08 | 
|  | [ 328 ] 
 | EMF around Fixed Point-to-Point systems - comments to COM 5 - C 0309 | Israel | Q7/5 | 2014-07-07 | 
|  | [ 327 ] 
 | K.mpis recommendation draft -review of COM 5 - C 0311 | Israel | Q7/5 | 2014-07-07 | 
|  | [ 326 ] 
 | RF Human hazards, safety precautions; observations to COM 5 - C 0312 | Israel | Q7/5 | 2014-07-07 | 
|  | [ 325 ] (Rev.1)
 | Comment to the draft of the ITU-T Recommendation K.mpis | Orange Polska S.A. | Q7/5 | 2014-07-07 | 
|  | [ 324 ] 
 | Revised proposal for the drafting of  a new recommendation K.XXX "Guidance on the Environmental Management for Electromagnetic Radiation from  Radiocommunication Base Stations" | China Telecommunications Corporation | Q7/5 | 2014-07-07 | 
|  | [ 323 ] 
 | The first draft of the new Recommendation K.ldt"Lightning Protection of the Dedicated Transformer for Radio Base Station" | China Telecommunications Corporation | Q5/5 | 2014-07-07 | 
|  | [ 322 ] (Rev.1-2)
 | K.appl1: Surge Protective Component Application Guide - Gas Discharge Tubes-Update | Bourns Limited | Q2/5 | 2014-07-05 | 
|  | [ 321 ] 
 | New waveshape definitions for 1.2/50-8/20 and 10/700 | Bourns Limited | Q4/5, Q2/5 | 2014-07-04 | 
|  | [ 320 ] 
 | The first draft of k.ntt "Protection of neighborhood of telecommunication towers against lightning" | China Unicom | Q5/5 | 2014-07-04 | 
|  | [ 319 ] 
 | K.20, K.21 and K.45 edits and comments from previous C103 | Bourns Limited | Q4/5 | 2014-07-04 | 
|  | [ 318 ] (Rev.1)
 | ITU K44 table question | Littelfuse UK Ltd. | Q4/5 | 2014-07-03 | 
|  | [ 317 ] (Rev.1)
 | ITU K44 Ethernet test conditions that should be referenced in K20/21/45 | Littelfuse UK Ltd. | Q4/5 | 2014-07-03 | 
|  | [ 316 ] (Rev.1)
 | K20 Table 1a clarification | Littelfuse UK Ltd. | Q4/5 | 2014-07-03 | 
|  | [ 315 ] (Rev.1)
 | K21 Table 1a clarification | Littelfuse UK Ltd. | Q4/5 | 2014-07-03 | 
|  | [ 314 ] (Rev.1)
 | K45 Table 1 clarification | Littelfuse UK Ltd. | Q4/5 | 2014-07-03 | 
|  | [ 313 ] (Rev.1-2)
 | Ethernet surges in ATIS STEP NEP document | Littelfuse UK Ltd. | Q4/5 | 2014-07-03 | 
|  | [ 312 ] (Rev.1)
 | Prévention des dommages et sécurité | Dem. Rep. of the Congo | Q7/5 | 2014-07-02 | 
|  | [ 311 ] 
 | K.mpis recommendation draft | Alcatel-Lucent International
          	    ,
        	    Brazil
          	    ,
        	    GSM Association
          	    ,
        	    Orange
          	    ,
        	    Telefon AB - LM Ericsson | Q7/5 | 2014-07-02 | 
|  | [ 310 ] 
 | Proposal on the revision of K.79 considering the vehicle  and aero environment | Ministry of Industry and Information Technology (MIIT) | Q11/5 | 2014-07-02 | 
|  | [ 309 ] (Rev.1-2)
 | EMF around Fixed Point-to-Point systems | Orange Polska S.A. | Q7/5 | 2014-07-01 | 
|  | [ 308 ] (Rev.1)
 | EMF-Guide - Proposed corrections and extensions | Orange Polska S.A. | Q7/5 | 2014-06-23 | 
|  | [ 307 ] (Rev.1)
 | Proposal of the revision of Recommendation ITU-T K.52 | Orange Polska S.A. | Q7/5 | 2014-06-23 | 
| Results:51 total items. Result page: 	
	1 -
	2
	   - Next
  
 | 
Multiple Document Download: Formats and Languages to be included (when available):