Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 338 ]
|
G.8032 SF and FS
|
Alcatel-Lucent, AimValley BV
|
Q9/15
|
2008-11-28 |
|
[ 337 ]
|
G.lt: Update to SELT-PMD draft text
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2008-11-28 |
|
[ 336 ]
|
G.984.4 Implementer's Guide
|
Huawei Technologies Co.,Ltd.
|
Q2/15
|
2008-11-26 |
|
[ 335 ]
|
Signal Degrade (SD) triggered protection switching
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-26 |
|
[ 334 ]
|
Proposal on the link recovery in case of multiple failures in G.8032
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-26 |
Currently viewing 5 of 338 documents related to this meeting (more...)
|
Temporary Documents  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 56-GEN ]
|
Discussion and next steps of phase/time synchronization in G-PON
|
Rapporteur Q2/15
|
Q13/15, Q2/15
|
2008-12-08 |
|
[ 55-GEN ]
(Rev.1-2) |
Final list of participants
|
TSB
|
QALL/15
|
2008-12-02 |
|
[ 54-GEN ]
|
Work on Wavelength Switched Optical Networks
|
Rapporteur Q12/15
|
Q12/15, Q6/15
|
2008-12-01 |
|
[ 53-GEN ]
(Rev.1) |
Draft agenda for joint Question sessions on Optical Transport Networks (OTN) Coordination
|
Rapporteur Q3/15
|
Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q9/15, Q7/15, Q6/15, Q3/15
|
2008-12-01 |
|
[ 52-GEN ]
|
Questionnaire from ITU-T Focus Group on ICT and Climate Change
|
Chairman FG ICT&CC
|
QALL/15
|
2008-12-01 |
Currently viewing 5 of 429 documents related to this meeting (more...)
|
Reports  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 4 ]
|
Report of the first meeting of Working Party 3/15, Transport network structures (2009-2012) (Geneva, 1 - 12 December 2008)
|
SG 15
|
Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
|
2009-03-05 |
|
[ 3 ]
|
Report of the first meeting of Working Party 2/15 Optical access/transport network technologies and physical infrastructures (2009-2012), (Geneva, 1 - 12 December 2008)
|
SG 15
|
Q8/15, Q7/15, Q6/15, Q5/15, Q18/15, Q17/15, Q16/15
|
2009-03-13 |
|
[ 2 ]
|
Report of the first meeting of Working Party 1/15, Transport aspects of Access networks and home networking (2009-2012), (Geneva, 1-12 December 2008)
|
SG 15
|
Q4/15, Q2/15, Q1/15
|
2009-02-27 |
|
[ 1 ]
|
Report of the first meeting of Study Group 15, Optical transport networks and access network infrastructures, (Geneva, 1-12 December 2008)
|
SG 15
|
Q1-19/15
|
2009-02-19 |
|
Multiple Document Download: Formats and Languages to be included (when available):