Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 78 ]
|
Proposed text for use cases in draft recommendation Q.nacp.Ng
|
ETRI
|
Q7/11
|
2009-01-09 |
|
[ 77 ]
|
Update for Draft Q.3306
|
Telekomunikacja Polska (Poland)
|
Q5/11
|
2009-01-09 |
|
[ 76 ]
|
Proposal for Definition of NGN Protocol Sets
|
ETRI
|
Q1/11
|
2009-01-09 |
|
[ 75 ]
|
Discussion Paper: Introduction of circuit grouping in BICC and ISUP protocols
|
LM Ericsson
|
Q3/11
|
2009-01-09 |
|
[ 74 ]
|
Proposed update for Q.3320
|
Telekomunikacja Polska (Poland)
|
Q5/11
|
2009-01-09 |
|
[ 73 ]
|
Proposal to create new recommendation of the architectural framework for network attachment control signalling in NGN
|
ETRI
|
Q7/11
|
2009-01-09 |
|
[ 72 ]
|
Proposed update of handbook appendix
|
Telekomunikacja Polska (Poland)
|
Q6/11
|
2009-01-09 |
|
[ 71 ]
|
Proposed updates of handbook text
|
Telekomunikacja Polska (Poland)
|
Q6/11
|
2009-01-09 |
|
[ 70 ]
|
Proposal of Amendment 2 of Recommendation ITU-T X.603.1 (2007)
|
ETRI
|
Q15/11
|
2009-01-09 |
|
[ 69 ]
|
Proposal of technical corrigendum 1 to Recommendation ITU-T X.603.1 (2007)
|
ETRI
|
Q15/11
|
2009-01-09 |
|
[ 68 ]
|
Proposal of new Clause 9. Parameters in X.mmc-3
|
ETRI
|
Q15/11
|
2009-01-09 |
|
[ 67 ]
|
Proposed Modification of MMC-3 control messages in clause 8 of X.mmc-3
|
ETRI
|
Q15/11
|
2009-01-09 |
|
[ 66 ]
|
Revised texts for draft recommendation Q.nacp.Ng
|
ETRI
|
Q7/11
|
2009-01-09 |
|
[ 65 ]
|
Proposed Modification of MMC-3 control data in clause 8.4 of X.mmc-3
|
ETRI
|
Q15/11
|
2009-01-09 |
|
[ 64 ]
|
Proposed Modification of X.rmcp-3(X.603.2 | ISO/IEC 16512-3) for second FCD
|
ETRI
|
Q15/11
|
2009-01-09 |
|
[ 63 ]
|
Proposal for protocol messages in Q.nacp.Ru
|
ETRI
|
Q7/11
|
2009-01-09 |
|
[ 62 ]
|
Proposal for Q.nacp.Ru recommendation
|
ETRI
|
Q7/11
|
2009-01-09 |
|
[ 61 ]
|
Proposed baseline text for Q.3911 - "Monitoring parameters set for voice services in NGN"
|
China Telecom
|
Q9/11, Q8/11
|
2009-01-09 |
|
[ 60 ]
|
Proposed baseline text for Q.3910 - "Monitoring parameters set for NGN protocols"
|
China Telecom
|
Q9/11, Q8/11
|
2009-01-09 |
|
[ 59 ]
|
Proposal for add procedure description of original PD-PE in Ri interface
|
China Telecom
|
Q5/11
|
2009-01-09 |
|
[ 58 ]
|
A proposal to delete bulk/collective reservation spec of Ri interface and add notes to Q.3307.1
|
China Telecom
|
Q5/11
|
2009-01-09 |
|
[ 57 ]
|
Proposed signalling requirements for supporting the Incoming Communication service feature of IP Centrex
|
China Telecom
|
Q3/11
|
2009-01-09 |
|
[ 56 ]
|
Proposed signaling requirements for supporting the Outgoing Communication service feature of IP Centrex
|
China Telecom
|
Q3/11
|
2009-01-09 |
|
[ 55 ]
|
Proposed signalling requirements for supporting the Internal Communication service feature of IP Centrex
|
China Telecom
|
Q3/11
|
2009-01-09 |
|
[ 54 ]
|
Proposed text for section 5.3 of 'The Signalling Requirements for IP Centrex service'
|
China Telecom
|
Q3/11
|
2009-01-09 |
|
[ 53 ]
|
Proposed modifications for 'The Signalling Requirements for IP Centrex service'
|
China Telecom
|
Q3/11
|
2009-01-09 |
|
[ 52 ]
|
Editorial changes on Q.CRBT
|
KT, ETRI
|
Q3/11, Q2/11
|
2009-01-09 |
|
[ 51 ]
|
Proposed signalling architecture of mobility
|
China Mobile, Huawei Technologies Co., Ltd.
|
Q5/11
|
2009-01-09 |
|
[ 50 ]
|
Proposed outline of a draft Recommendation for signalling architecture and signalling flows for mobility
|
China Mobile, Huawei Technologies Co., Ltd.
|
Q5/11
|
2009-01-09 |
|
[ 49 ]
|
Proposed modifications to draft Q.PCNApp
|
Huawei Technologies Co., Ltd.
|
Q5/11
|
2009-01-09 |
|
[ 48 ]
|
Modifications to the admission control coordination models
|
British Telecom, Huawei Technologies Co., Ltd.
|
Q5/11
|
2009-01-09 |
|
[ 47 ]
|
Proposed modifications to draft Q.CRT
|
Huawei Technologies Co., Ltd.
|
Q3/11, Q2/11
|
2009-01-09 |
|
[ 46 ]
|
Proposed modifications to draft Q.CRBT
|
Huawei Technologies Co., Ltd.
|
Q3/11, Q2/11
|
2009-01-09 |
|
[ 45 ]
|
Proposed modification to Interaction between networks of draft Q.CRBT
|
Huawei Technologies Co., Ltd.
|
Q3/11, Q2/11
|
2009-01-09 |
|
[ 44 ]
|
Proposed additions to draft Recommendation Q.CRT
|
Huawei Technologies Co.,Ltd.
|
Q3/11, Q2/11
|
2009-01-09 |
|
[ 43 ]
|
Proposed additions to draft Recommendation Q.CRBT
|
Huawei Technologies Co.,Ltd.
|
Q3/11, Q2/11
|
2009-01-09 |
|
[ 42 ]
|
Definition of Multimedia CAT Capability Indicator to BICC/ISUP protocols
|
Huawei Technologies Co. Ltd.
|
Q3/11
|
2009-01-09 |
|
[ 41 ]
|
Signalling flows for centralized admission control of unicast combined with decentralized admission control of multicast flows
|
Huawei Technologies Co., Ltd., CATR
|
Q5/11
|
2009-01-09 |
|
[ 40 ]
|
Revised draft of Supp.CRBT-CRT
|
ETRI, KT
|
Q3/11, Q2/11
|
2009-01-09 |
|
[ 39 ]
|
Document withdrawn
|
N/A
|
|
2009-01-09 |
|
[ 38 ]
|
Proposal for change of the question title of Q.12/11
|
ETRI
|
Q12/11
|
2009-01-09 |
|
[ 37 ]
|
NID/USN standardization status of ITU-T
|
ETRI
|
Q12/11
|
2009-01-09 |
|
[ 36 ]
|
Revised texts of Draft Recommendation Q.3308
|
ETRI
|
Q5/11
|
2009-01-09 |
|
[ 35 ]
|
IMS/NGN Performance Benchmark Part 3: Traffic Sets and Traffic Profiles
|
Telekom Austria AG
|
Q8/11, Q11/11
|
2009-01-09 |
|
[ 34 ]
|
IMS/NGN Performance Benchmark Part 2: Subsystem Configurations and Benchmarks
Reposted with correct attachment
|
Telekom Austria AG
|
Q8/11, Q11/11
|
2009-01-09 |
|
[ 33 ]
|
IMS/NGN Performance Benchmark Part 1: Core Concepts
|
Telekom Austria AG
|
Q8/11, Q11/11
|
2009-01-09 |
|
[ 32 ]
|
Network performance objectives Tests for IP-based Voice services
|
Telekom Austria AG
|
Q11/11
|
2009-01-09 |
|
[ 31 ]
|
Comparisons of ITU-T CRBT and 3GPP CAT
|
Korea (Republic of)
|
Q3/11, Q2/11
|
2009-01-09 |
|
[ 30 ]
|
Document withdrawn
|
N/A
|
|
2009-01-09 |
|
[ 29 ]
|
Proposed method of marking signalling packets suitable for IPv6
|
Razoom Inc.
|
Q5/11
|
2009-01-09 |
Results:78 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):