Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG05 : Réunion 2009-10-12 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG05  C (2009-10-12) 

UIT-T SG05

ICT and climate change

Période d'études 2009

Réunion  du 2009-10-12 au 2009-10-16

Lieu : Suisse [Genève]

Autres réunions : 2012-10-08  2012-04-11  2011-09-20  2011-04-27  2010-11-23  2010-10-01  2010-04-12  2010-01-19  2009-05-25  2008-11-24 

Resultats:37 documents
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 76 ]  
 
GDT Self-Oscillation     IEEE   Q4/5, Q13/5   2009-10-02
[ 75 ]  
 
Reference Model for Recurring GHG Footprint of ICT equipment     Juniper Networks   Q21/5, Q20/5, Q19/5, Q18/5, Q17/5   2009-10-02
[ 74 ]  
 
Method for Assessing Potential Carbon Dioxide Equivalent Emission Reduction of ICT Services     Telefon AB - LM Ericsson   Q18/5   2009-10-02
[ 73 ]  
 
ICT Specific Life Cycle Assessment for Products and Systems     Telefon AB - LM Ericsson   Q18/5   2009-10-02
[ 72 ]  
 
Proposal of Study Items Related to Specifications of Power Feeding Systems     NTT   Q19/5   2009-10-02
[ 71 ]  
 
Experimentation performed by FT and SNCF on ADSL disturbances created by the passage of trains     France Telecom Orange and SNCF   Q9/5   2009-10-02
[ 70 ]  
 
Different kinds of environmental impacts assessments in the field of ICT, proposal to focus on some of them     France Telecom Orange   Q18/5   2009-10-02
[ 69 ]  
 
Brazil Experience With EMF Measurements, Monitoring and Enforcement     ANATEL, Brazil   Q3/5   2009-10-01
[ 68 ]  
 
Proposal of averaging time reduction for evaluation of human exposure     Republic of Korea   Q3/5   2009-10-01
[ 67 ]  
 
Reference for optical cable usage with metallic parts related to K.25     Republic of Korea   Q5/5   2009-10-01
[ 66 ]  
 
Introduction of "Integrated I/O connection interface for mobile device" standard     Republic of Korea   Q21/5   2009-10-01
[ 65 ]  
 
Proposal for a work item on a method for providing recycling information about the rare metals in ICT products     Republic of Korea   Q21/5   2009-10-01
[ 64 ]  
 
Proposal for development of establishment guidance for green data centers     Republic of Korea   Q19/5   2009-10-01
[ 63 ]  
 
Development of a GHG accounting methodology for ICT projects     Republic of Korea   Q18/5   2009-10-01
[ 62 ]  
 
Development of an ICT environmental labelling standard     Republic of Korea   Q18/5   2009-10-01
[ 61 ]  
 
Development of an ICT-product carbon footprinting methodology     Republic of Korea   Q18/5   2009-10-01
[ 60 ]  
 
The result of ITU Virtual International Symposium on ICTs and Climate Change     Republic of Korea   Q17/5   2009-10-01
[ 59 ]  
 
Proposal for a work item on ICT GHG Inventory System     Republic of Korea   Q18/5   2009-10-01
[ 58 ]  
 
Importance of impact assessment of ICT technologies influencing other sectors     ETRI   Q18/5   2009-10-01
[ 57 ]  
 
Collaboration with ISO TC207 for ICT&CC standardization     ETRI   Q17/5   2009-10-01
[ 56 ]  
 
Collaboration with ISO/IEC JTC 1 for ICT&CC standardization     ETRI   Q17/5   2009-10-01
[ 55 ]  
 
Collaboration with ISO/IEC JTC 1 Study Group on Energy Efficiency of Data Centers     ETRI   Q19/5   2009-10-01
[ 54 ]  
 
Proposal for standardization of Utility Computing services as an energy efficient ICT infrastructure service mechanism     ETRI   Q17/5   2009-10-01
[ 53 ]  
 
A work item proposal for eco-management guidance of ICT equipment for customers     ETRI   Q18/5   2009-10-01
[ 52 ]  
 
Proposal of evaluation method for reduction of environmental loads by improved work efficiency     Japan   Q18/5   2009-10-01
[ 51 ]  
 
Proposed Draft Recommendation of L.methodology     Japan   Q18/5   2009-10-01
[ 50 ]  
 
Proposed Scope and Study Items for Draft Recommendation of L.methodology     Japan   Q18/5   2009-10-01
[ 49 ]  
 
Proposed Definitions of Terminologies related to ICT and climate change     Japan   Q14/5   2009-10-01
[ 48 ]  
 
Proposal on drafting the key technical points of L.adapter     China   Q21/5   2009-10-01
[ 47 ]  
 
Deficiencies in GDT specifications that hinder coordination design     IEEE   Q4/5, Q13/5   2009-10-01
[ 46 ]  
 
Modelling GDT sparkover     IEEE   Q4/5, Q13/5   2009-10-01
[ 45 ]  
 
EMF exposure assessment - special cases     Telekomunikacja Polska, Poland   Q2/5   2009-10-01
[ 44 ]  
 
Co-endroit, séparation et interopérabilité dans des réseaux de télécommunications     ARPTC   Q1/5   2009-10-01
[ 43 ]  
 
North American wiring simulators     IEEE   Q4/5, Q13/5   2009-09-25
[ 42 ]  
 
Time variation of electromagnetic field strength radiated from IMT-2000 base station antenna     NTT DoCoMo Inc. , NICT   Q3/5   2009-09-17
[ 41 ]  
 
Equipment testing and evaluating methods for the QOE of broadband customer premises equipments within Multi-interference factors     China Telecoms Corp.   Q8/5, Q12/5   2009-09-10
[ 40 ]  
 
Test methods for Resistibility of xDSL modem related to lightning protection     China Telecoms Corp.   Q4/5   2009-09-10
Resultats:37 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2025-5-7