International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG13 : Meeting 2006-07-17 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG13  TD-WP1 (2006-07-17) 

ITU-T SG13

Next-generation networks

Study Period 2005

Meeting  from 2006-07-17 to 2006-07-28

held in Switzerland [Geneva]

Other Meetings : 2009-09-01  2009-01-12  2008-09-12  2008-05-22  2008-01-14  2007-09-21  2007-04-16  2006-11-03  [ 2006-07-17 ]  2006-01-16  2005-08-29  2005-04-25  2004-12-07 

Results:24 total items.
Temporary Documents  (WP1)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 85-WP1 ]  
 
Agenda closing Plenary WP 1     Chairman WP 1/13   Q1/13   2006-07-26
[ 84-WP1 ]  
(Rev.1-4) 
Q.1/13 meeting report     Rapporteur   Q1/13   2006-07-26
[ 83-WP1 ]  
 
LS on terminology for NGN     Rapporteur   Q11/13   2006-07-26
[ 82-WP1 ]  
 
New draft Recommendation "Generic requirements and framework of FPBN naming and addressing"     Editor   Q13/13   2006-07-25
[ 81-WP1 ]  
 
New draft Recommendation "High level architecture of Future Packet Based Networks"     Editor   Q13/13   2006-07-24
[ 80-WP1 ]  
 
New draft Recommendation "General requirements of Future Packet Based Networks"     Editor   Q13/13   2006-07-24
[ 79-WP1 ]  
(Rev.1) 
Q.13/13 meeting report     Rapporteur   Q13/13   2006-07-24
[ 78-WP1 ]  
(Rev.1) 
Q.11/13 draft meeting report     Acting Rapporteur   Q11/13   2006-07-24
[ 77-WP1 ]  
 
Draft ITU-T NGN Release 1 Description (Y.NGN-R1)     Editor   Q1/13   2006-07-19
[ 76-WP1 ]  
(Rev.1-2) 
Draft meeting agenda of Q.11/13     Acting Rapporteur   Q11/13   2006-07-17
[ 75-WP1 ]  
 
Draft agenda of Q.13/13     Rapporteurs   Q13/13   2006-07-17
[ 74-WP1 ]  
(Rev.1-2) 
Q.1/13 draft meeting agenda     Rapporteur   Q1/13   2006-07-13
[ 73-WP1 ]  
(Rev.1) 
Terms for inclusion in Y.term     Acting Rapporteur Q.11/13   Q11/13   2006-07-11
[ 72-WP1 ]  
(Rev.1-2) 
Revised Baseline For Text for Recommendation on Terminology and Definitions     Acting Rapporteur Q.11/13   Q11/13   2006-07-11
[ 71-WP1 ]  
 
Liaison statement on NGN GSI and Project Mangement Database     ITU-T SG 3   Q1/13   2006-06-30
[ 70-WP1 ]  
 
Response to liaison statement on Recommendation on "High level architecture of FPBN"     Q.12/15 Rapp Group meeting   Q13/13   2006-06-28
[ 69-WP1 ]  
 
Response to LS from SG 13 on NGN Project Management Database     ITU-T SG 4   Q1/13   2006-06-12
[ 68-WP1 ]  
 
NGN Project Management Database     ITU-T SG 17   Q1/13   2006-05-18
[ 67-WP1 ]  
 
NGN Release 1 Roadmap (Output Document of the Q.1/13 Rapporteur Group meeting, Kobe, 22-27 April 2006)     Editor of NGN Release 1 Roadmap   Q1/13   2006-05-22
[ 66-WP1 ]  
(Rev.1) 
Q.1/13 Living List (Output Document of the Q.1/13 Rapporteur Group meeting, Kobe, 22-27 April 2006)     Rapporteur Q.1/13   Q1/13   2006-05-12
[ 65-WP1 ]  
 
Q.1/13 Rapporteur Group meeting report (Kobe, Japan, 22-27 April 2006)     Q.1/13 Rapporteur   Q1/13   2006-05-12
[ 64-WP1 ]  
 
LS to SG 13 and NGN-JCA on NGN Project Management Tool     ITU-T SG 16   Q1/13   2006-05-05
[ 63-WP1 ]  
 
 
Withdrawn
 
N/A     2006-04-26
[ 62-WP1 ]  
 
Liaison statement on correction to TD 43 Rev.1 (WP 1/13), Q.1/13 Living List of approved/draft Recommendations that could fall into the scope of NGN     ITU-T SG 19   Q1/13   2006-02-23
Results:24 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-7