Collective Letters |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 4 ]
|
Meeting of Study Group 15 - Geneva, 20-31 January 2003
|
SG 15
|
|
2002-10-21 |
|
Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 92 ]
|
Draft new Recommendation G.GPON.gsr - General characteristics for Gigabit-capable Passive Optical Networks (GPON) (for consent)
|
Editor, Rec. G.GPON.gsr
|
Q2/15
|
2002-12-04 |
|
[ 91 ]
|
Up-date to G.780 "Vocabulary of terms for synchronous digital hierarchy (SDH) networks and equipment"
|
Nortel Networks (Europe)
|
Q18/15, Q17/15, Q16/15, Q15/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q9/15
|
2002-12-04 |
|
[ 90 ]
|
Amendment 2 to Recommendations G.983.1 and G.983.1 Amend.1
|
Terawave Communications
|
Q2/15
|
2002-12-04 |
|
[ 89 ]
|
Optical fiber cable statistical PMD requirements for 10 Gbit/s Ethernet
|
United States of America
|
Q15/15
|
2002-11-26 |
|
[ 88 ]
|
Optical fiber cable statistical PMD requirements for 40 Gbit/s over 80 km
|
United States of America
|
Q15/15
|
2002-11-22 |
Currently viewing 5 of 22 documents related to this meeting (more...)
|
Delayed Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 711 ]
|
Transmission schemes of SS7 Signaling optimized for IP-CME
|
Editor Rec. G.ipcme
|
Q5/15
|
2003-01-11 |
|
[ 710 ]
|
Discussion on objective SNR measures for G.VED (G.162)
|
LM Ericsson
|
Q6/15
|
2003-01-10 |
|
[ 709 ]
|
Proposed Edits to the Example PSDs in Draft Appendix V for use in TCM ISDN Environment
|
Fujitsu
,
ACCA Networks
|
Q4/15
|
2003-01-10 |
|
[ 708 ]
|
ADSL: Proposed Amendment to G.992.2 Annex C for improved robustness and extended reach (for consent)
|
Sumitomo Electric Industries
,
Oki Electric Industry
,
NEC
,
Matsushita
,
Fujitsu
,
eAccess
,
Acca Networks
|
Q4/15
|
2003-01-10 |
|
[ 707 ]
|
ADSL: Proposed changes to "Draft G.992.1 Revision: Annex C, Annex I and Appendix V" (for consent)
|
NEC
,
Sumitomo Electric Industries
,
Oki Electric Industry
,
Matsushita
,
Fujitsu
,
eAccess
,
Acca Networks
|
Q4/15
|
2003-01-10 |
Currently viewing 5 of 254 documents related to this meeting (more...)
|
Temporary Documents |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 61-GEN ]
|
Study Group 15 EDH Report
|
SG15 EDH Coordinator
|
QALL
|
2003-01-30 |
|
[ 60-GEN ]
|
Final list of participants
|
TSB
|
QALL
|
2003-01-30 |
|
[ 59-GEN ]
|
ITU-T Workshop on Access Network
|
TSB
|
QALL
|
2003-01-29 |
|
[ 58-GEN ]
|
Information on RSVP Parameters assigned by IANA
|
Chairman WP3/15
|
Q19/15, Q14/15
|
2003-01-24 |
|
[ 57-GEN ]
|
DRAFT Agenda/Work Schedule for Joint Question Meeting on Optical Transport Networks & Technologies (OTNT) Coordination
|
Rapporteur Q.19/15
|
Q9/15, Q19/15, Q17/15, Q16/15, Q14/15, Q13/15, Q12/15, Q11/15
|
2003-01-20 |
Currently viewing 5 of 308 documents related to this meeting (more...)
|
Reports |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 44 ]
|
Report of the fourth meeting of Study Group 15 - Transport networks, systems and equipment (Geneva, 20-31 January 2003) - Implementors' Guide for Recommendation I.751
|
SG 15
|
Q14/15
|
2003-02-19 |
|
[ 43 ]
|
Report of the fourth meeting of Study Group 15 - Transport networks, systems and equipment (Geneva, 20-31 January 2003) - Implementors' Guide for Recommendation G.983.2
|
SG 15
|
Q2/15
|
2003-02-19 |
|
[ 42 ]
|
Report of the fourth meeting of Study Group 15 - Transport networks, systems and equipment (Geneva, 20-31 January 2003) - Implementors' Guide for Recommendation G.773
|
SG 15
|
Q14/15
|
2003-02-19 |
|
[ 41 ]
|
Report of the fourth meeting of Study Group 15 - Transport networks, systems and equipment (Geneva, 20-31 January 2003) - Implementors' Guide for Recommendation G.168
|
SG 15
|
Q6/15
|
2003-02-19 |
|
[ 40 ]
+Corr.1 |
Report of Working Party 5/15, Projects and promotion (Geneva, 20-31 January 2003) - PART I.3: OTN - Standardization and Work Plan (issue 3)
|
SG 15
|
Q9/15, Q1/15
|
2003-02-19 |
Currently viewing 5 of 16 documents related to this meeting (more...)
|
Multiple Document Download: Formats and Languages to be included (when available):