International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP7D : Meeting 2026-09-14 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP7D  TD (2026-09-14) 

ITU-R R23-WP7D

Radio Astronomy

Meeting  from 2026-09-14 to 2026-09-24

held in Switzerland [Geneva]

Results:21 total items.
Temporary Documents  Documents / Contributions
 
Number 
Title Source Date
[ 160 ]  
 
Annex XX to Working Party 7D Chair's Report - Preliminary draft new Recommendation [SZM_THRESHOLDS] - Protection criteria for radio astronomy in the shielded zone of the Moon     WP 7D   2026-09-24
[ 159 ]  
 
Working document towards draft CPM text for WRC-27 agenda item 1.16     WP 7D   2026-09-24
[ 158 ]  
 
Draft CPM text for WRC-27 agenda item 1.18, Resolves 2     WP 7D   2026-09-24
[ 157 ]  
(Rev.1) 
Annex XX to Working Party 7D Chair's Report - Working document towards a preliminary draft new Report ITU-R RA.[SZM_UEMR] - Unintended electromagnetic radiation affecting radio astronomy observations in the Shielded Zone of the Moon     WP 7D   2026-09-23
[ 156 ]  
(Rev.1) 
Annex XX to Working Party 7D Chair's Report - Preliminary draft new Report ITU-R RA.[SZM-FAC] - Radio astronomy facilities on the Moon     WP 7D   2026-09-23
[ 155 ]  
 
Annex XX to Working Party 7D Chair's Report - Working document towards a preliminary draft new Recommendation ITU-R RA.[RAS-NGSO] - Minimizing interference from non-GSO satellites at RAS stations     WP 7D   2026-09-23
[ 154 ]  
 
Annex XX to Working Party 7D Chair's Report - Working document towards a preliminary draft new Report ITU-R RA.[BSA] - Evaluation of radio telescope boresight avoidance and its impact on reduction of unwanted emissions from non-GSO satellite systems     WP 7D   2026-09-23
[ 153 ]  
 
Annex XX to Working Party 7D Chair's Report - Working document towards a preliminary draft new Report ITU-R RA.[NGSO-RAS-RQZ] - Studies on new coexistence measures between non-GSO satellite systems and RAS stations in the Radio Quiet Zones supporting the Square Kilometre Array Observatory (SKAO) and the Atacama Large Millimeter/submillimeter Array (ALMA)]     WP 7D   2026-09-23
[ 152 ]  
 
Annex XX to Working Party 7D Chair's Report - Preliminary draft new Report ITU-R RA.[AGG-NGSO-ABOVE-10 GHZ] - Aggregated interference from non-GSO satellite systems into radio astronomy service in primary bands 10.6-10.7, 42.5-43.5, 76-77.5 94.1-95, 100 102 and 130-134 GHz     WP 7D   2026-09-23
[ 151 ]  
 
Annex XX to Working Party 7D Chair's Report - Radio astronomy station antenna characteristics     WP 7D   2026-09-23
[ 150 ]  
(Rev.1) 
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5B, 7B and 7C - Revision of Report ITU-R RA.2188-1     WP 7D   2026-09-22
[ 149 ]  
 
Preliminary draft new Report ITU-R RA.[RAS-SAT 71-235 GHZ] - Compatibility between RAS operating in the 76-81, 130-134, 164-167 and 226-231.5 GHz and adjacent active satellite services     WP 7D   2026-09-22
[ 148 ]  
(Rev.2) 
Preliminary draft revision of Recommendation ITU-R RA.1631 - Reference radio astronomy antenna pattern to be used for compatibility analyses between non-GSO systems and radio astronomy service stations based on the epfd concept     WP 7D   2026-09-18
[ 147 ]  
 
Preliminary draft revision of Report ITU-R RA.2188-1 - Power flux-density and e.i.r.p. levels potentially damaging to radio astronomy receivers     WP 7D   2026-09-18
[ 146 ]  
(Rev.1) 
Annex XX to Working Party 7D Chair's Report - Working document towards preliminary draft new Report ITU-R RA.[URFE] - Unintended radio frequency energy (URFE) radiated by spaceborne equipment into RAS frequency bands     WP 7D   2026-09-18
[ 145 ]  
(Rev.1) 
Working document towards a preliminary draft revision of Report ITU-R RA 2512-0 - Technical and operational characteristics of broadband, background-limited detectors operating in the millimetre-wave regime     WP 7D   2026-09-15
[ 144 ]  
 
Annex xx to Working Party 7D Chair's Report - Working document towards a preliminary draft new Report ITU-R RA.[SPACEVLBI] - Technical and operational characteristics of space-based very long baseline interferometry for radio astronomy     WP 7D   2026-09-15
[ 143 ]  
 
Annex XX to Working Party 7D Chair's Report - Proposed updates to some elements for working document towards a preliminary draft new Report ITU-R RA.[SATCON-AGG] - Determining the interference levels and data loss to the radio astronomy service caused by single and multiple satellite systems     WP 7D   2026-09-15
[ 142 ]  
 
Annex XX to Working Party 7D Chair's Report - Working document towards a preliminary draft new [Recommendation/Report] on threshold levels above 275 GHZ     WP 7D   2026-09-14
[ 141 ]  
(Rev.1) 
Draft new Report ITU-R RA.[RECEIVER-RESILIENCE] - Resilience of radio astronomy receivers     WP 7D   2026-09-14
[ 140 ]  
 
Annex XX to Working Party 7D Chair's Report Working document towards a preliminary draft new Report ITU-R RA.[SZM-DARK_SECTOR] - Spectrum management practices and experience gained from RAS operations in Antarctica and similarly remote environments     WP 7D   2026-09-14
Results:21 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2026-09-24