|
Format |
Size |
Posted |
|
|
|
| English |
PDF (acrobat)
|
147479 bytes |
2026-10-02 |
[434] Annex 20
- Final list of participants |
| |
Word
|
42329 bytes |
2026-10-02 |
[434] Annex 19
- List of documents issued |
| |
Word
|
60238 bytes |
2026-10-05 |
[434] Annex 18
- Status of Questions assigned to Working Party 7C |
| |
Word
|
56948 bytes |
2026-10-05 |
[434] Annex 17
- Review of Recommendations, Reports and Opinions under the purview of Working Party 7C |
| |
Word
|
8555691 bytes |
2026-10-05 |
[434] Annex 16
- Preliminary draft new Report ITU-R RS.[NGSO-18-GHZ] - Impact assessment of co-frequency sharing between non-GSO FSS (space-to-Earth) and EESS (passive) in 18.6-18.8 GHz band |
| |
Word
|
3435537 bytes |
2026-10-05 |
[434] Annex 15
- Preliminary draft new ITU-R Report - Analysis of interference received by EESS (passive) sensors in the 18.6 18.8 GHz band caused by surface water reflections |
| |
Word
|
3060195 bytes |
2026-10-02 |
[434] Annex 14
- Preliminary draft revision of Report ITU-R RS.2431-0 - Technical and operational characteristics of EESS (passive) systems in the frequency range 275-450 GHz |
| |
Word
|
4352746 bytes |
2026-10-02 |
[434] Annex 13
- Preliminary draft revision of Recommendation ITU-R RS.1861-1 - Typical technical and operational characteristics of Earth exploration-satellite service (passive) systems using allocations between 1.4 and 275 GHz |
| |
Word
|
62385219 bytes |
2026-10-05 |
[434] Annex 12
- Working document towards a [preliminary draft new Report on WRC-27 agenda item 1.19]/[Supporting material for WRC-27 agenda item 1.19] - Studies on possible allocations to the Earth exploration-satellite service (passive) in the bands 4 200-4 400 MHz and 8 400-8 500 MHz |
| |
Word
|
41524 bytes |
2026-10-06 |
[434] Annex 11
- Status of issues related to EESS (passive) above 86 GHZ (as of 13 March 2026) |
| |
Word
|
13253400 bytes |
2026-10-01 |
[434] Annex 10
- Preliminary draft new Report ITU-R RS.[1.18 - EESS] |
| |
Word
|
22110844 bytes |
2026-10-02 |
[434] Annex 9
- Working document towards a preliminary draft revised Report ITU-R RS.2456-1 - Space weather sensor systems using radio spectrum |
| |
Word
|
2521851 bytes |
2026-10-01 |
[434] Annex 8
- Working document towards a preliminary draft
new Report ITU-R RS.[SW_STUDIES] - Studies on possible primary allocations to the meteorological aids
service (space weather) for receive-only space weather sensors
|
| |
Word
|
201509 bytes |
2026-10-02 |
[434] Annex 7
- Preliminary draft new Recommendation ITU-R RS.[RXSW_PROTECT_CRITERIA] - Protection criteria of receive-only space weather sensors in the meteorological aids service (space weather) |
| |
Word
|
790855 bytes |
2026-10-01 |
[434] Annex 6
- Working document towards a preliminary draft new ITU-R Report - Typical technical and operational characteristics of spaceborne active sensors for possible extension of the 3 100-3 300 MHz frequency band under WRC-31 preliminary agenda item 2.12
|
| |
Word
|
510459 bytes |
2026-10-01 |
[434] Annex 5
- Preliminary draft revision of Recommendation ITU-R RS.2105-3 - Typical technical and operational characteristics of Earth exploration-satellite service (active) systems using allocations between 40 MHz and 238 GHz |
| |
Word
|
64489 bytes |
2026-10-02 |
[434] Annex 4
- Draft CPM text for WRC-27 agenda item 1.19 |
| |
Word
|
259418 bytes |
2026-10-02 |
[434] Annex 3
- Draft CPM Text for WRC-27 agenda item 1.18 |
| |
Word
|
184701 bytes |
2026-10-01 |
[434] Annex 2
- Draft CPM Text for WRC-27 agenda item 1.17 |
| |
Word
|
37252 bytes |
2026-09-22 |
[434] Annex 1
- Draft CPM texts for information only in Sections A1/2.12 and A1/2.13 of Annex 1 to the draft CPM Report, in relation to WRC-31 preliminary agenda items 2.12 and 2.13 |
| |
Word
|
121484 bytes |
2026-10-12 |
[434]
- Report on the meeting of Working Party 7C - (14-24 September 2026) |
|
|